CN203891256U - Field splicing node of shear walls of steel pipe bundle combination structure - Google Patents

Field splicing node of shear walls of steel pipe bundle combination structure Download PDF

Info

Publication number
CN203891256U
CN203891256U CN201420225141.9U CN201420225141U CN203891256U CN 203891256 U CN203891256 U CN 203891256U CN 201420225141 U CN201420225141 U CN 201420225141U CN 203891256 U CN203891256 U CN 203891256U
Authority
CN
China
Prior art keywords
steel pipe
shear wall
pipe bundle
combining structure
bundle combining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420225141.9U
Other languages
Chinese (zh)
Inventor
胡立黎
王彦超
杨强跃
陆国兵
付波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangxiao Steel Structure Co Ltd
Original Assignee
Zhejiang Hangxiao Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hangxiao Steel Structure Co Ltd filed Critical Zhejiang Hangxiao Steel Structure Co Ltd
Priority to CN201420225141.9U priority Critical patent/CN203891256U/en
Application granted granted Critical
Publication of CN203891256U publication Critical patent/CN203891256U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a field splicing node of shear walls of a steel pipe bundle combination structure. The field splicing node is formed by the plurality of shear walls of the steel pipe bundle combination structure through splicing; every shear wall comprises a left flange and a right flange which are vertically arranged; a plurality of division plates are separately arranged between the left flange and the right flange; every shear wall is divided into a plurality of units through the left flange, the right flange and the division plates; every unit comprises an empty chamber; concrete is poured in every empty chamber; the previous shear wall is connected with the next shear wall through welding seams; the division plate which is arranged at the connecting positions of the welding seams of every upper shear wall and the corresponding lower shear wall is provided with anchoring reinforcements which penetrate the division plate of the upper shear wall and the corresponding lower shear wall; the anchoring reinforcements are parallel to the left flange and the right flange of every shear wall. According to the field splicing node of the shear walls of the steel pipe bundle combination structure, the strength of the connecting positions of the shear walls is enhanced.

Description

The on-the-spot splicing of steel pipe bundle combining structure shear wall node
Technical field
The utility model relates to the on-the-spot splicing of a kind of steel pipe bundle combining structure shear wall node.
Background technology
Under construction, by the material of agent structure, divide, conventional have two kinds of concrete structure and steel work.Steel pipe bundle combining structure shear wall is that steel work and concrete structure are effectively combined and become a kind of novel lateral resistant member, the advantage that the architectural composition that has given full play to concrete shear force wall flexibly, structure steel fabrication industrialization degree is high, speed of application is fast has been brought into play steel high-strength lights, material property advantage that concrete rigidity is large simultaneously.
At present, in the upper and lower layer of steel pipe bundle combining structure shear wall structure wall assembly process, because vertical connected node often needs to bear the effects such as pressure, moment of flexure, shearing simultaneously, stress is comparatively complicated, and the connected node between upper and lower layer steel pipe bundle combining structure shear wall is the weak link in this structural system.After the on-site hoisting of steel pipe bundle combining structure shear wall is installed and is finished, adopt butt weld that the upper and lower steel pipe bundle combining structure shear wall left and right side edge of a wing is welded together, but cannot adopt welding procedure that the dividing plate in steel pipe bundle combining structure shear wall is linked together, cause steel pipe bundle combining structure shear wall junction local strength to weaken.
Summary of the invention
In order to overcome the shortcoming a little less than the local strength of junction between existing steel pipe bundle combining structure shear wall, the utility model provides the on-the-spot splicing of a kind of steel pipe bundle combining structure shear wall node.
The technical solution adopted in the utility model is:
The on-the-spot splicing of steel pipe bundle combining structure shear wall node, it is characterized in that: by a plurality of steel pipe bundle combining structure shear walls, be spliced to form, described steel pipe bundle combining structure shear wall comprises left wing's edge and the right flank edge of vertical setting, between described left wing's edge and right flank edge, be arranged at intervals with polylith dividing plate, described steel pipe bundle combining structure shear wall becomes a plurality of unit by left wing's edge, right flank edge with baffle for separating, described unit has cavity, fluid concrete in described cavity; A upper steel pipe bundle combining structure shear wall is connected by weld seam with next steel pipe bundle combining structure shear wall, on the dividing plate of the weld seam junction of upper and lower steel pipe bundle combining structure shear wall, be provided with anchor bar, described anchor bar runs through the dividing plate of upper and lower steel pipe bundle combining structure shear wall, and the left and right edge of a wing of described anchor bar and steel pipe bundle combining structure shear wall be arranged in parallel; One end of described anchor bar is anchored in the concrete of last steel pipe bundle combining structure shear wall, and the other end is anchored in the concrete of a rear steel pipe bundle combining structure shear wall.
Further, described anchor bar is U character form structure, and the dual-side of described U character form structure is parallel with the left and right edge of a wing of steel pipe bundle combining structure shear wall; The openend of U character form structure is anchored in the concrete of last steel pipe bundle combining structure shear wall, and the bending bottom anchor of U character form structure is in the concrete of a rear steel pipe bundle combining structure shear wall.
Further, described concrete can be ordinary concrete, high-strength concrete, light weight aggregate concrete or self-compacting concrete.
The beneficial effects of the utility model are embodied in: the utility model welds anchor bar on the dividing plate at shear wall node place, have strengthened the local strength of steel pipe bundle combining structure shear wall junction, and method of attachment is reliable, and construction method is simple.
Accompanying drawing explanation
Fig. 1 is the utility model Novel steel tube bank combining structure member integrated sectional view.
Fig. 2 is that in Fig. 1, anchor bar is the schematic diagram of U character form structure.
The specific embodiment
See figures.1.and.2, the on-the-spot splicing of steel pipe bundle combining structure shear wall node, by a plurality of steel pipe bundle combining structure shear walls 1, be spliced to form, described steel pipe bundle combining structure shear wall 1 comprises left wing's edge 11 and the right flank edge 12 of vertical setting, between described left wing's edge 11 and right flank edge 12, be arranged at intervals with polylith dividing plate, described steel pipe bundle combining structure shear wall 1 becomes a plurality of unit by left wing's edge 11, right flank edge 12 with baffle for separating, described unit has cavity, fluid concrete in described cavity; A upper steel pipe bundle combining structure shear wall is connected by weld seam with next steel pipe bundle combining structure shear wall, on the dividing plate of the weld seam junction 2 of upper and lower steel pipe bundle combining structure shear wall, be provided with anchor bar 3, described anchor bar 3 runs through the dividing plate of upper and lower steel pipe bundle combining structure shear wall, and described anchor bar 3 be arranged in parallel with the left and right edge of a wing 11,12 of steel pipe bundle combining structure shear wall; One end of described anchor bar 3 is anchored in the concrete of last steel pipe bundle combining structure shear wall, and the other end is anchored in the concrete of a rear steel pipe bundle combining structure shear wall.
Further, described anchor bar 3 is U character form structure, and the dual-side of described U character form structure is parallel with the left and right edge of a wing of steel pipe bundle combining structure shear wall; The openend of U character form structure is anchored in the concrete of last steel pipe bundle combining structure shear wall, and the bending bottom anchor of U character form structure is in the concrete of a rear steel pipe bundle combining structure shear wall.
Further, described concrete can be ordinary concrete, high-strength concrete, light weight aggregate concrete or self-compacting concrete.
Content described in this manual embodiment is only enumerating the way of realization of inventive concept; protection domain of the present utility model should not be regarded as only limiting to the concrete form that embodiment states, protection domain of the present utility model also and the equivalent technologies means that can expect according to the utility model design in those skilled in the art.

Claims (3)

1. node is spliced at steel pipe bundle combining structure shear wall scene, it is characterized in that: by a plurality of steel pipe bundle combining structure shear walls, be spliced to form, described steel pipe bundle combining structure shear wall comprises left wing's edge and the right flank edge of vertical setting, between described left wing's edge and right flank edge, be arranged at intervals with polylith dividing plate, described steel pipe bundle combining structure shear wall becomes a plurality of unit by left wing's edge, right flank edge with baffle for separating, described unit has cavity, fluid concrete in described cavity; A upper steel pipe bundle combining structure shear wall is connected by weld seam with next steel pipe bundle combining structure shear wall, on the dividing plate of the weld seam junction of upper and lower steel pipe bundle combining structure shear wall, be provided with anchor bar, described anchor bar runs through the dividing plate of upper and lower steel pipe bundle combining structure shear wall, and the left and right edge of a wing of described anchor bar and steel pipe bundle combining structure shear wall be arranged in parallel; One end of described anchor bar is anchored in the concrete of last steel pipe bundle combining structure shear wall, and the other end is anchored in the concrete of a rear steel pipe bundle combining structure shear wall.
2. the on-the-spot splicing of steel pipe bundle combining structure shear wall as claimed in claim 1 node, is characterized in that: described anchor bar is U character form structure, and the dual-side of described U character form structure is parallel with the left and right edge of a wing of steel pipe bundle combining structure shear wall; The openend of U character form structure is anchored in the concrete of last steel pipe bundle combining structure shear wall, and the bending bottom anchor of U character form structure is in the concrete of a rear steel pipe bundle combining structure shear wall.
3. the on-the-spot splicing of steel pipe bundle combining structure shear wall as claimed in claim 2 node, is characterized in that: described concrete can be ordinary concrete, high-strength concrete, light weight aggregate concrete or self-compacting concrete.
CN201420225141.9U 2014-05-05 2014-05-05 Field splicing node of shear walls of steel pipe bundle combination structure Expired - Lifetime CN203891256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420225141.9U CN203891256U (en) 2014-05-05 2014-05-05 Field splicing node of shear walls of steel pipe bundle combination structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420225141.9U CN203891256U (en) 2014-05-05 2014-05-05 Field splicing node of shear walls of steel pipe bundle combination structure

Publications (1)

Publication Number Publication Date
CN203891256U true CN203891256U (en) 2014-10-22

Family

ID=51717676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420225141.9U Expired - Lifetime CN203891256U (en) 2014-05-05 2014-05-05 Field splicing node of shear walls of steel pipe bundle combination structure

Country Status (1)

Country Link
CN (1) CN203891256U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821989A (en) * 2016-04-18 2016-08-03 杭萧钢构股份有限公司 Assembly type steel pipe bundle concrete shear wall structure system and construction method thereof
CN105839814A (en) * 2016-05-12 2016-08-10 浙江东南网架股份有限公司 Longitudinal connecting joint between multi-cavity steel plate shear walls and operating method of longitudinal connecting joint
CN116497976A (en) * 2023-06-28 2023-07-28 华侨大学 Double-steel-plate-concrete combined shear wall connection node structure and connection construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821989A (en) * 2016-04-18 2016-08-03 杭萧钢构股份有限公司 Assembly type steel pipe bundle concrete shear wall structure system and construction method thereof
CN105839814A (en) * 2016-05-12 2016-08-10 浙江东南网架股份有限公司 Longitudinal connecting joint between multi-cavity steel plate shear walls and operating method of longitudinal connecting joint
CN116497976A (en) * 2023-06-28 2023-07-28 华侨大学 Double-steel-plate-concrete combined shear wall connection node structure and connection construction method
CN116497976B (en) * 2023-06-28 2023-09-26 华侨大学 Double-steel-plate-concrete combined shear wall connection node structure and connection construction method

Similar Documents

Publication Publication Date Title
CN104047378A (en) Steel tube bundle combined structure shear wall field spliced node
CN203080736U (en) Combined profile steel box-shaped steel plate shear wall
CN206289751U (en) A kind of assembled steel plate concrete combined shear wall and floor support plate connecting node
CN202831233U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns inscribed a pipe coat
CN103334499B (en) A kind of beam column node connection device
CN204212267U (en) End plate type girder steel and steel pipe bundle combining structure shear wall connected node
CN204781322U (en) Steel core concrete column and outsourcing U -shaped steel -concrete composite beam connected node
CN202755656U (en) Split bolt fixing structure for double-layer steel plate shearing wall
CN203891256U (en) Field splicing node of shear walls of steel pipe bundle combination structure
CN203361354U (en) Beam column pitch point connecting device
CN104912197A (en) Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN106759858A (en) The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column
CN203905210U (en) Steel pipe bundle combined structure shear wall in-site splicing joint
CN104233961B (en) A kind of supporting shelf bracket of No. 0 block of cantilever bridge
CN103206075A (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN203891207U (en) Shear wall connecting node of steel beam and steel pipe bundle combination structure
CN206693403U (en) A kind of steel core concrete column and connected mode
CN104047379A (en) Steel tube bundle composite structure shear wall field splice node
CN108104263A (en) A kind of novel fabricated steel-regeneration concrete combination frame structural system
CN202831232U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns containing a pipe coat
CN203795608U (en) Prefabricated reinforced concrete beam and steel pipe column connecting joint
CN106759112B (en) The manufacturing method of concrete works sealing swaging die with reinforcing fiber
CN208486165U (en) A kind of concrete circular stub and girder steel consolidate connecting structure
CN203640257U (en) Support of overhanging type scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HANGXIAO STEEL COMPONENT CO., LTD.

Free format text: FORMER NAME: ZHEJIANG HANGXIAO STEEL STRUCTURE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Xiaoshan Economic Development Zone hongken road Xiaoshan District Hangzhou city Zhejiang province 311217 No. 305

Patentee after: HANGXIAO STEEL STRUCTURE Co.,Ltd.

Address before: Xiaoshan Economic Development Zone hongken road Xiaoshan District Hangzhou city Zhejiang province 311217 No. 305

Patentee before: ZHEJIANG HANGXIAO STEEL STRUCTURE Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141022