CN203879484U - 页岩气井地面测试系统 - Google Patents

页岩气井地面测试系统 Download PDF

Info

Publication number
CN203879484U
CN203879484U CN201420258313.2U CN201420258313U CN203879484U CN 203879484 U CN203879484 U CN 203879484U CN 201420258313 U CN201420258313 U CN 201420258313U CN 203879484 U CN203879484 U CN 203879484U
Authority
CN
China
Prior art keywords
phase separator
open flow
shale gas
well ground
gas well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420258313.2U
Other languages
English (en)
Inventor
唐伟
韩家新
吴绪虎
何晓波
张相权
袁洪斌
胡定洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Chongqing Fuling Shale Gas Exploration and Development Co Ltd
Original Assignee
Downhole Testing Co of Sinopec Jianghan Petroleum Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Downhole Testing Co of Sinopec Jianghan Petroleum Engineering Co Ltd filed Critical Downhole Testing Co of Sinopec Jianghan Petroleum Engineering Co Ltd
Priority to CN201420258313.2U priority Critical patent/CN203879484U/zh
Application granted granted Critical
Publication of CN203879484U publication Critical patent/CN203879484U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型涉及一种页岩气井地面测试系统,包括依次连接的压裂井口、上游数据头、碎屑捕集器、降压管汇台、下游数据头、热交换器和两相分离器,所述两相分离器的气体出口分别与主放喷池和副放喷池连接,所述两相分离器的液体出口与排污池连接,所述两相分离器的气体出口还与集气站连接,所述两相分离器的气体出口处设有高级孔板流量计,所述两相分离器与主放喷池通过主放喷测试管线连接,所述两相分离器与集气站通过试采管线连接,所述主放喷测试管线上设有自力式调节阀。本实用新型能够实现测试求产过程中的天然气回收,降低污染排放,并且测试求产数据准确。

Description

页岩气井地面测试系统
技术领域
本实用新型涉及一种页岩气井地面测试系统。
背景技术
页岩气,是从页岩层中开采出来的天然气,是一种重要的非常规天然气资源。页岩气常分布在盆地内厚度较大、分布广的页岩烃源岩地层中,分布范围广、厚度大,且普遍含气,这使得页岩气井能够长期地以稳定的速率产气。随着页岩气被视为未来能源的“明星”而大量开采,但其生产开发过程中,如何减少前期地面测试放喷求产过程中燃烧而白白浪费掉的页岩气,充分利用页岩气这种清洁高效的能源,仍值得进一步关注和探讨。
图1所示为现有技术中的页岩气井地面测试系统,求产期间天然气通过降压管汇节流后进入两相分离器,进过两相分离器初步分离后直接排放至主、副放喷池进行空放燃烧,期间运用临界速度流量计对气体流动产量进行计量,可求得单井工作制度下的真实产量。
以全国页岩气开发示范区焦石坝地区为例,前期十几口井的开发投产,总结出在礁石坝地区页岩气单井4个工作制(6mm、8mm、10mm、12mm)求产下,产能范围为6×104m3/d~60×104m3/d,在页岩气井前期放喷求产过程中,每天空放燃烧掉6×104m3/d~60×104m3/d天然气,若按2元/方的天然气单价计算,每天燃烧掉的页岩气的直接经济损失为12万~120万,燃烧将直接产生二氧化碳10.6吨-106吨排放,加剧国内各地区雾霾的问题。与此同时,在放喷求产燃烧的过程中,大量高速气流在放喷口燃烧会产生剧烈的震动和噪音,严重影响了周围百姓的生活。
发明内容
本实用新型要解决的技术问题在于,提供一种能够实现天然气回收,降低污染排放,并且测试求产数据准确的页岩气井地面测试系统。
本实用新型解决其技术问题所采用的技术方案是:构造一种页岩气井地面测试系统,包括依次连接的压裂井口、上游数据头、碎屑捕集器、降压管汇台、下游数据头、热交换器和两相分离器,所述两相分离器的气体出口分别与主放喷池和副放喷池连接,所述两相分离器的液体出口与排污池连接,所述两相分离器的气体出口还与集气站连接,所述两相分离器的气体出口处设有高级孔板流量计,所述两相分离器与主放喷池通过主放喷测试管线连接,所述两相分离器与集气站通过试采管线连接,所述主放喷测试管线上设有自力式调节阀;当试采管线的压力低于集气站管线压力时,所述自力式调节阀自动调整至关闭,当试采管线的压力高于集气站管线压力时,所述自力式调节阀自动平稳开启。
上述方案中,所述降压管汇台还通过放压管线与所述高级孔板流量计连接。
上述方案中,所述降压管汇台与所述排污池连接,与所述排污池连接的排污管线上设有液体流量计。
上述方案中,所述两相分离器还通过安全释放管线与主放喷池连接。
上述方案中,所述两相分离器的气体出口通过副放喷测试管线与所述副放喷池连接,所述副放喷测试管线上设有临界速度流量计。
上述方案中,所述自力式调节阀还与闸板阀并联连接。
上述方案中,所述自力式调节阀的下游还设有临界速度流量计。
上述方案中,所述热交换器通过蒸汽管线与锅炉连接。
实施本实用新型的页岩气井地面测试系统,具有以下有益效果:
1、本实用新型中设置的自力式调节阀的作用是保持两相分离器稳定的测试压力和集气站稳定的管网压力。当试采管线的管网压力骤然降低时,自力式调节阀会自动调整甚至关闭,以维持管网压力;当试采管线的管网压力逐渐升高时,自力式调节阀会平稳开启,将多余的天然气计量后排放至主放喷池燃烧。本实用新型通过设置自力式调节阀既保证了天然气的采集,并减缓了分离器本身的压力波动,保证了压力、产量等测试数据的准确录取。
2、本实用新型中采用高级孔板流量计代替原有的临界速度流量计进行计量,高级孔板流量计安装在两相分离器出口管线上。高级孔板流量计不需要像临界速度流量计一样考虑临界流速问题,计量运算时只需要孔板上下游有20-100kpa的压差就能准确计量,因此测试两相分离器流出的气体产量更加准确。
附图说明
下面将结合附图及实施例对本实用新型作进一步说明,附图中:
图1是现有技术中页岩气井地面测试系统示意图;
图2是本实用新型页岩气井地面测试系统示意图。
具体实施方式
为了对本实用新型的技术特征、目的和效果有更加清楚的理解,现对照附图详细说明本实用新型的具体实施方式。
如图2所示,本实用新型的页岩气井地面测试系统包括依次连接的压裂井口1、上游数据头2、碎屑捕集器3、降压管汇台4、下游数据头13、热交换器14、两相分离器15、主放喷池11、副放喷池6、排污池19和集气站9。
两相分离器15的气体出口分别与主放喷池11、副放喷池6和集气站9连接,两相分离器15的液体出口与排污池19连接。两相分离器15的气体出口处设有高级孔板流量计8,两相分离器15与主放喷池11通过主放喷测试管线连接,两相分离器15与集气站9通过试采管线连接,主放喷测试管线上设有自力式调节阀10。
设置自力式调节阀10的作用是保持两相分离器15稳定的测试压力和集气站9稳定的管网压力。本实施例中采用的自力式调节阀10为KIMRAY气动薄膜阀,其具体结构为现有技术,在此不再赘述。本实施例中进站回收需提供5.5Mpa管网压力。当试采管线的管网压力骤然降低时,自力式调节阀10会自动调整甚至关闭,以维持管网压力;当试采管线的管网压力逐渐升高时,自力式调节阀10会平稳开启,将多余的天然气计量后排放至主放喷池11燃烧。本实用新型通过设置自力式调节阀10既保证了天然气的采集,并减缓了两相分离器15本身的压力波动,保证了压力、产量等测试数据的准确录取。
采用自力式调节阀10后,如果在主放喷测试管线上设置临界速度流量计7来测试求产数据存在较大误差,主要表现在多余气量通过主测试管线进入临界速度流量计7时无法满足临界流速要求(通过孔板的气流必须达到临界状态既P下≦0.546P上),造成产量不准确。
因此,本实用新型采用高级孔板流量计8代替原有的临界速度流量计7进行计量,高级孔板流量计8安装在两相分离器15出口管线上。高级孔板流量计8不需要像临界速度流量计7一样考虑临界流速问题,计量运算时只需要孔板上下游有20-100kpa的压差就能准确计量,因此测试两相分离器15流出的气体产量更加准确。
进一步的,降压管汇台4还通过放压管线5与高级孔板流量计8连接,降压管汇台4中的气体可以直接通过放压管线5后通过高级孔板流量计8计量。
进一步的,降压管汇台4与排污池19连接,与排污池19连接的排污管线18上设有液体流量计17。
进一步的,两相分离器15还通过安全释放管线16与主放喷池11连接,出现紧急状况时,通过安全释放管线16进入主放喷池11。
进一步的,两相分离器15的气体出口通过副放喷测试管线与副放喷池6连接,副放喷测试管线上设有临界速度流量计7。
进一步的,自力式调节阀10还与闸板阀12并联连接,建立旁路备用管线做紧急处理,防止自力式调节阀10发生故障导致失控。
进一步的,自力式调节阀10的下游还设有临界速度流量计7,可以验证高级孔板流量计8产量数据做准备。
进一步的,热交换器14通过蒸汽管线20与锅炉21连接。
上面结合附图对本实用新型的实施例进行了描述,但是本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本实用新型的启示下,在不脱离本实用新型宗旨和权利要求所保护的范围情况下,还可做出很多形式,这些均属于本实用新型的保护之内。

Claims (8)

1.一种页岩气井地面测试系统,包括依次连接的压裂井口、上游数据头、碎屑捕集器、降压管汇台、下游数据头、热交换器和两相分离器,所述两相分离器的气体出口分别与主放喷池和副放喷池连接,所述两相分离器的液体出口与排污池连接,其特征在于,所述两相分离器的气体出口还与集气站连接,所述两相分离器的气体出口处设有高级孔板流量计,所述两相分离器与主放喷池通过主放喷测试管线连接,所述两相分离器与集气站通过试采管线连接,所述主放喷测试管线上设有自力式调节阀;当试采管线的压力低于集气站管线压力时,所述自力式调节阀自动调整至关闭,当试采管线的压力高于集气站管线压力时,所述自力式调节阀自动平稳开启。
2.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述降压管汇台还通过放压管线与所述高级孔板流量计连接。
3.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述降压管汇台与所述排污池连接,与所述排污池连接的排污管线上设有液体流量计。
4.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述两相分离器还通过安全释放管线与主放喷池连接。
5.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述两相分离器的气体出口通过副放喷测试管线与所述副放喷池连接,所述副放喷测试管线上设有临界速度流量计。
6.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述自力式调节阀还与闸板阀并联连接。
7.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述自力式调节阀的下游还设有临界速度流量计。
8.根据权利要求1所述的页岩气井地面测试系统,其特征在于,所述热交换器通过蒸汽管线与锅炉连接。
CN201420258313.2U 2014-05-20 2014-05-20 页岩气井地面测试系统 Expired - Fee Related CN203879484U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420258313.2U CN203879484U (zh) 2014-05-20 2014-05-20 页岩气井地面测试系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420258313.2U CN203879484U (zh) 2014-05-20 2014-05-20 页岩气井地面测试系统

Publications (1)

Publication Number Publication Date
CN203879484U true CN203879484U (zh) 2014-10-15

Family

ID=51679994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420258313.2U Expired - Fee Related CN203879484U (zh) 2014-05-20 2014-05-20 页岩气井地面测试系统

Country Status (1)

Country Link
CN (1) CN203879484U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104373102A (zh) * 2014-11-12 2015-02-25 中国石油天然气股份有限公司 一种气井水力压裂后密闭排液测试求产装置及方法
CN110264065A (zh) * 2019-06-18 2019-09-20 中石化石油工程技术服务有限公司 页岩气压裂高压控制元件的全生命周期管理系统
CN111946330A (zh) * 2020-08-05 2020-11-17 中石化石油工程技术服务有限公司 一种页岩气进站超压紧急处理撬
CN113123742A (zh) * 2021-04-22 2021-07-16 中国海洋石油集团有限公司 一种海上高温高压窄安全密度窗口井的井控系统及方法
CN113622871A (zh) * 2020-05-07 2021-11-09 中国石油化工股份有限公司 一种节流放喷系统及使用方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104373102A (zh) * 2014-11-12 2015-02-25 中国石油天然气股份有限公司 一种气井水力压裂后密闭排液测试求产装置及方法
CN104373102B (zh) * 2014-11-12 2017-11-10 中国石油天然气股份有限公司 一种气井水力压裂后密闭排液测试求产装置及方法
CN110264065A (zh) * 2019-06-18 2019-09-20 中石化石油工程技术服务有限公司 页岩气压裂高压控制元件的全生命周期管理系统
CN113622871A (zh) * 2020-05-07 2021-11-09 中国石油化工股份有限公司 一种节流放喷系统及使用方法
CN111946330A (zh) * 2020-08-05 2020-11-17 中石化石油工程技术服务有限公司 一种页岩气进站超压紧急处理撬
CN111946330B (zh) * 2020-08-05 2023-12-01 中石化石油工程技术服务有限公司 一种页岩气进站超压紧急处理撬
CN113123742A (zh) * 2021-04-22 2021-07-16 中国海洋石油集团有限公司 一种海上高温高压窄安全密度窗口井的井控系统及方法
CN113123742B (zh) * 2021-04-22 2022-11-22 中国海洋石油集团有限公司 一种海上高温高压窄安全密度窗口井的井控系统及方法

Similar Documents

Publication Publication Date Title
CN203879484U (zh) 页岩气井地面测试系统
CN201037402Y (zh) 采空区卸压煤层气抽采模拟实验装置
CN104929610A (zh) 一种基于大丛式井组天然气生产分离橇装装置
CN206439810U (zh) 一种疏水扩容器乏汽回收系统
CN202194628U (zh) 采气树及气井地面建设集成橇一体化装置
CN202024306U (zh) 一种锅炉余热回收器
CN202338775U (zh) 高压天然气管线在线排污装置
CN105865220A (zh) 一种双背压凝汽器优化运行装置及其运行方法
CN204238991U (zh) 一种利用废热代替低压缸抽汽有效焓的热力系统
CN102328997A (zh) 厌氧反应器甲烷气体回收系统
CN203771036U (zh) 加气站撬装设备
CN202832470U (zh) 原油气液分离流程集成设备
CN206956854U (zh) 一种全密闭变频无负压供水设备
CN201978377U (zh) 阻火器
CN213177697U (zh) 一种短流程天然气集输系统
CN207776853U (zh) 一种煤层气丛式井橇装装置
CN210422599U (zh) 一种页岩气单井快速试气系统
CN209809751U (zh) 适用于拌合站的集成化环保除尘系统及其控制系统
CN204057979U (zh) 一种高浓度氨水制配系统
CN204754901U (zh) 一种基于大丛式井组天然气生产分离橇装装置
CN208312551U (zh) 混水调温隔压装置
CN201756955U (zh) 一种低气油比的油田平台的伴生气的回收处理装置
CN207226161U (zh) 一种缓冲筒
CN108086968B (zh) 一种煤层气丛式井橇装装置
CN206973268U (zh) 一种具有多级安全保护功能的天然气调压橇装装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOPEC CHONGQING FULING SHALE GAS EXPLORATION AND

Free format text: FORMER OWNER: DOWNHOLE TESTING COMPANY SINOPEC JIANGHAN PETROLEUM ENGINEERING CO., LTD.

Effective date: 20141119

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Aichun

Inventor after: Zhang Xiangquan

Inventor after: Wu Wei

Inventor after: Mao Qingchun

Inventor after: Zhao Kun

Inventor after: Liu Xing

Inventor after: Xia Xubo

Inventor after: Han Jiaxin

Inventor after: Wu Xuhu

Inventor after: Tang Wei

Inventor before: Tang Wei

Inventor before: Han Jiaxin

Inventor before: Wu Xuhu

Inventor before: He Xiaobo

Inventor before: Zhang Xiangquan

Inventor before: Yuan Hongbin

Inventor before: Hu Dinghong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: TANG WEI HAN JIAXIN WU XUHU HE XIAOBO ZHANG XIANGQUAN YUAN HONGBIN HU DINGHONG TO: LI AICHUN WU WEI MAO QINGCHUN ZHAO KUN LIU XING XIA XUBO HAN JIAXIN WU XUHU TANG WEI ZHANG XIANGQUAN

Free format text: CORRECT: ADDRESS; FROM: 430040 WUHAN, HUBEI PROVINCE TO: 408014 FULING, CHONGQING

TR01 Transfer of patent right

Effective date of registration: 20141119

Address after: 408014, 6 Feng Feng Road, Xincheng District, Fuling District, Chongqing, China

Patentee after: Sinopec Chongqing Fuling Shale Gas Exploration and Development Co., Ltd.

Address before: 430040, Ma Panlut, No. 9 silver and gold lake, Dongxihu lake, Wuhan, Hubei

Patentee before: DOWNHOLE TESTING COMPANY, SINOPEC JIANGHAN PETROLEUM ENGINEERING CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20160520

CF01 Termination of patent right due to non-payment of annual fee