CN203835397U - Receiving structure used when shield tunneling machine reaches tunneling terminal - Google Patents

Receiving structure used when shield tunneling machine reaches tunneling terminal Download PDF

Info

Publication number
CN203835397U
CN203835397U CN201420224499.XU CN201420224499U CN203835397U CN 203835397 U CN203835397 U CN 203835397U CN 201420224499 U CN201420224499 U CN 201420224499U CN 203835397 U CN203835397 U CN 203835397U
Authority
CN
China
Prior art keywords
received well
receiving well
header
cup
shield machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420224499.XU
Other languages
Chinese (zh)
Inventor
丁仕辉
林世友
丘宏余
汪永剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Guangdong No 2 Hydropower Engineering Co Ltd
Original Assignee
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Guangdong No 2 Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Water Power Urban Rail Transit Construction Co Ltd, Guangdong No 2 Hydropower Engineering Co Ltd filed Critical Guangdong Water Power Urban Rail Transit Construction Co Ltd
Priority to CN201420224499.XU priority Critical patent/CN203835397U/en
Application granted granted Critical
Publication of CN203835397U publication Critical patent/CN203835397U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a receiving structure used when a shield tunneling machine reaches a tunneling terminal. The receiving structure used when the shield tunneling machine reaches the tunneling terminal comprises a receiving well, a receiving platform located in the receiving well, a receiving well wall and three diaphragm walls arranged in a weak stratum, wherein a front receiving well chamber is defined by the receiving well wall and the three diaphragm walls, a continuous vacuum water pumping device is arranged in the front receiving well chamber, a tunnel portal is arranged in the portion, between the front receiving well chamber and the receiving well, of the receiving well wall, and a sealing device is installed on the tunnel portal. According to the receiving structure used when the shield tunneling machine reaches the tunneling terminal, the front receiving well chamber and the continuous vacuum water pumping device are arranged in front of the tunnel portal of the receiving well, soil mass near the tunnel portal is separated from soil mass outside the front chamber, a channel through which underground water outside the front receiving well chamber seeps into the front receiving well chamber is blocked, underground water in the front receiving well chamber is pumped and discharged, in this way, the water level is made to be 3 m below the shield tunneling machine, the solidification function is achieved through the weak stratum in the front receiving well chamber when it rains, and the good condition is created for the shield tunneling machine to enter the receiving well.

Description

A kind of shield machine arrives the reception structure of driving terminal
Technical field
The utility model relates to the reception structure that a kind of shield machine arrives driving terminal.
Background technology
In shield-tunneling construction, the reception that shield machine arrives driving terminal is the key link of shield construction, especially at soft stratum (as loose sandy soils, moisture soft clay stratum etc.).Because soil body self-stability and water proofing property in soft stratum are poor, when shield machine enters received well, gluing, sealing completely between shield structure housing and received well portal, form annular spaces, soft soil outside the portal borehole wall and underground water, by annular spaces, scurry in well, cause the front ground of portal to cave in, even cause tunnel deformation, muddy water to pour in the major accident in tunnel.So, must carry out near the soil body anti-seepage reinforcing pretreatment of received well portal.
At present, the method that near the soil stabilization of shield structure received well portal adopts both at home and abroad mainly contains agitation pile, rotary churning pile, chemical grouting, freezing etc.But agitation pile is because being limited by current technical level, be difficult to guarantee that agitation pile is definitely vertical, with the received well borehole wall can not good contact, and easily form bottom each agitation pile overlap joint discontinuous, cause jag, form leakage passage, meanwhile, mixing pile construction length is restricted; Rotary churning pile reinforcing method, chemical consolidation method, freezing reinforcing method, engineering quantity is larger, long in time limit, operating expenses is high.
Utility model content
The purpose of this utility model, is to provide a kind of shield machine to arrive the reception structure of driving terminal.
The solution that the utility model solves its technical problem is: a kind of shield machine arrives the reception structure of driving terminal, it comprises received well, is positioned at the receiving platform of received well, the received well borehole wall and be placed in soft stratum San road impervious wall, described received well borehole wall He San road impervious wall surrounds a received well cup, in described received well cup, be furnished with two rows and continue vacuum pumping device, the received well borehole wall between received well cup and received well is provided with portal, and described portal has been installed sealing device.
As the further improvement of technique scheme, described received well cup San road impervious wall becomes walling material can adopt hardened slurry, self-solidifying mortar, wet concrete, plain concrete, and impervious wall 28d compressive strength in the length of time is lower than 5MPa.
Further improvement as technique scheme, described lasting vacuum pumping device comprises header and the filter of header lower end is set, in described header, be provided with the gutter that an external diameter is less than header internal diameter, the upper end mouth of pipe of described header is provided with for sealing the nozzle device of header, the upper end mouth of pipe of described gutter connects this nozzle device, the lower end mouth of pipe of described gutter is connected with submersible pump, described nozzle device be provided with can by the vacuum hole vacuumizing in header and with the unidirectional hole of extraneous one-way conduction.
The beneficial effects of the utility model are: the utility model by arranging received well cup and lasting vacuum pumping device before the portal of received well, near soil body portal and the outer soil body of cup are separated, and block the passage of the outer Groundwater infiltration received well cup of received well cup, underground water in pump drainage received well cup again, make water level be down to following 3m at the bottom of shield machine, soft layer in the process of precipitation in received well cup reaches consolidation, for shield machine enters received well, creates good condition.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, below the accompanying drawing of required use during embodiment is described is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present utility model, rather than whole embodiment, and those skilled in the art is not paying under the prerequisite of creative work, can also obtain other design schemes and accompanying drawing according to these accompanying drawings.
Fig. 1 is received well cup floor map;
Fig. 2 is that shield machine arrives at and receives into cup elevational schematic view;
Fig. 3 is received well portal sealing device schematic diagram;
Fig. 4 is that shield machine arrives at received well elevational schematic view;
Fig. 5 is the structural representation that continues vacuum pumping device.
The specific embodiment
Below with reference to embodiment and accompanying drawing, the technique effect of design of the present utility model, concrete structure and generation is clearly and completely described, to understand fully the purpose of this utility model, feature and effect.Obviously; described embodiment is a part of embodiment of the present utility model, rather than whole embodiment, based on embodiment of the present utility model; other embodiment that those skilled in the art obtains under the prerequisite of not paying creative work, all belong to the scope that the utility model is protected.In addition, all connection/annexations of mentioning in literary composition, not singly refer to that member directly joins, and refer to and can by adding or reducing, connect auxiliary according to concrete performance, form more excellent draw bail.
With reference to Fig. 1~Fig. 5, a kind of shield machine arrives the reception structure of driving terminal, it comprises received well, is positioned at the receiving platform 8 of received well, the received well borehole wall 2 and be placed in soft stratum 5 San road impervious walls 1, the described received well borehole wall 2 He San road impervious walls 1 surround a received well cup 3, in described received well cup 3, be furnished with and continue vacuum pumping device 4, the received well borehole wall 2 between received well cup 3 and received well is provided with portal 6, and described portal 6 has been installed sealing device.
By received well cup 3 and lasting vacuum pumping device 4 are set before the portal 6 at received well, near the outer soil body of the soil body and cup portal 6 is separated, and block the passage of the outer Groundwater infiltration received well of received well cup 3 cup 3, underground water in pump drainage received well cup 3 again, make water level be down to following 3m at the bottom of shield machine, soft layer 5 in the process of precipitation in received well cup 3 reaches consolidation, for shield machine enters received well, creates good condition.
Be further used as preferred embodiment, 1 one-tenth walling material of described received well cup 3 San road impervious walls can adopt hardened slurry, self-solidifying mortar, wet concrete, plain concrete, and impervious wall 28d compressive strength in the length of time is lower than 5MPa.
Be further used as preferred embodiment, described lasting vacuum pumping device comprises header 10 and the filter of header lower end is set, in header 10, put into again the gutter 30 that an external diameter is less than header 10 internal diameters, and at the lower end of gutter 30 mouth of pipe, one submersible pump 40 is installed, the fillter section tube wall of header 10 is provided with inlet opening 80, and there is the muscle 90 of putting more energy in tube wall outside to reinforce, in the muscle 90 outer wrap drainage geotextiles 70 of putting more energy into, prevent inlet opening 80 obstructions, nozzle device 20 is provided with sealing flange with the header 10 upper end mouths of pipe, sealing flange inside is provided with seal washer 60.The wall of nozzle device 20 be provided be connected with vacuum pump vacuumize hole 220 and with the unidirectional hole 210 of extraneous one-way conduction, the inner 230 in unidirectional hole 210 is connected with gutter 30, outer end 240 is connected with one way valve, guarantees the one-way conduction in gutter 30.With vacuum pump, by vacuumizing hole, header is vacuumized, make water in soft subgrade soil by the fillter section of header 10 lower ends, enter header 10 under pressure, use 4 pairs of water that enter in header 10 of submersible pump to extract, water is discharged to the external world by gutter 30 upper ends.Water level alarm device is installed on submersible pump 40, is controlled the duty of submersible pump, when water level reaches in warning line, prescribe a time limit, submersible pump 40 operates automatically, extracts water out header, when water level reaches under warning line, prescribes a time limit, and submersible pump 40 quits work automatically.
Adopt the shield machine that above-mentioned reception structure is carried out to arrive a method of reseptance that tunnels terminal, it comprises the following steps,
1) at portal 6 front ends of the received well three road impervious walls 1 of constructing, jointly form received well cup 3 with received well portal 6 boreholes wall, received well cup 3 internal layers and the outer field soil layer of received well cup 3 are separated;
2) in the interior layout of received well cup 3, continue vacuum pumping device 4 and draw water, the interior water level of received well cup 3 is down at the bottom of shield machine machine below, make the soil body discharging consolidation in received well cup 3;
3) shield machine construction arrives at received well cup 3, and normal construction is through the received well cup 3 fixed soil layer of precipitation;
4) shield machine arrives at the received well borehole wall 2, stops driving, shield machine shield body cutterhead is withstood on to portal 6 positions of the received well borehole wall 2, by mud in screw machine emptying native cabin dregs or the emptying mud of mud tube storehouse;
5) in received well, carry out portal 6 and abolish, and at portal 6 mounting sealing devices 7;
6) portal 6 is abolished and is installed after sealing device 7, and shield machine is pushed to received well, completes shield structure and receives.
Be further used as preferred embodiment, in step 2) in, in step 2) in, the interior employing of received well cup 3 continues vacuum pumping device 4 draws water, and makes soil body discharging consolidation in cup, and water level is down at the bottom of shield machine machine following 3 meters.
Be further used as preferred embodiment, before step 3), shield machine normal construction is through in the rear arrival received well of impervious wall 1 cup 3.
Referring to figs. 1 through Fig. 4, a preferred embodiment of the present utility model is as follows:
1,, after the received well of shield machine has been constructed, at received well hole front end construct three road impervious walls 1 and the common received well cup 3 that forms of the received well borehole wall 2, the soil layer that received well cup 3 is inside and outside is separated, and the outer water infiltration of blocking-up received well cup 3;
2, interior setting of received well cup 3, continue vacuum pumping device 4 and draw water, the interior water level of received well cup 3 is down to following 3m at the bottom of shield machine machine, make the interior soil body discharging consolidation of received well cup 3, the self-stability of raising received well cup 3 interior soft layers 5;
3, shield machine construction arrives at received well cup 3, and normal construction is through the soft layer 5 of the fixed strengthening of precipitation in received well cup 3 impervious walls 1 and received well cup 3;
4, shield machine arrives at the received well borehole wall 2, stops driving, cutter head of shield machine is withstood on and receives borehole wall portal 6 positions, by mud in screw machine emptying native cabin dregs or the emptying mud of mud tube storehouse;
5, in received well, carry out portal 6 concrete and abolish, and at hole 6 surrounding mounting sealing devices 7, the slip casting when preventing that shield machine from recovering driving behind section of jurisdiction is run off;
6, portal 6 concrete are abolished and are installed after sealing device 7, shield machine are pushed to the receiving platform 8 of received well, complete shield structure and receive.
More than that better embodiment of the present utility model is illustrated, but the utility model is created and is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite without prejudice to the utility model spirit, and the modification that these are equal to or replacement are all included in the application's claim limited range.

Claims (3)

1. a shield machine arrives the reception structure of tunneling terminal, it is characterized in that: it comprises received well, is positioned at the receiving platform of received well, the received well borehole wall and be placed in soft stratum San road impervious wall, described received well borehole wall He San road impervious wall surrounds a received well cup, in described received well cup, be furnished with lasting vacuum pumping device, the received well borehole wall between received well cup and received well is provided with portal, and described portal has been installed sealing device.
2. shield machine according to claim 1 arrives the reception structure of driving terminal, it is characterized in that: described received well cup San road impervious wall becomes walling material can adopt hardened slurry, self-solidifying mortar, wet concrete, plain concrete, and impervious wall 28d compressive strength in the length of time is lower than 5MPa.
3. shield machine according to claim 2 arrives the reception structure of driving terminal, it is characterized in that: described lasting vacuum pumping device comprises header and the filter of header lower end is set, in described header, be provided with the gutter that an external diameter is less than header internal diameter, the upper end mouth of pipe of described header is provided with for sealing the nozzle device of header, the upper end mouth of pipe of described gutter connects this nozzle device, the lower end mouth of pipe of described gutter is connected with submersible pump, described nozzle device be provided with can by the vacuum hole vacuumizing in header and with the unidirectional hole of extraneous one-way conduction.
CN201420224499.XU 2014-05-04 2014-05-04 Receiving structure used when shield tunneling machine reaches tunneling terminal Expired - Fee Related CN203835397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420224499.XU CN203835397U (en) 2014-05-04 2014-05-04 Receiving structure used when shield tunneling machine reaches tunneling terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420224499.XU CN203835397U (en) 2014-05-04 2014-05-04 Receiving structure used when shield tunneling machine reaches tunneling terminal

Publications (1)

Publication Number Publication Date
CN203835397U true CN203835397U (en) 2014-09-17

Family

ID=51513253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420224499.XU Expired - Fee Related CN203835397U (en) 2014-05-04 2014-05-04 Receiving structure used when shield tunneling machine reaches tunneling terminal

Country Status (1)

Country Link
CN (1) CN203835397U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018842A (en) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN110374620A (en) * 2019-08-25 2019-10-25 贵州大学 The exploitation of mining heading equipment is crushed header structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018842A (en) * 2014-05-04 2014-09-03 广东水电二局股份有限公司 Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN104018842B (en) * 2014-05-04 2016-11-02 广东水电二局股份有限公司 A kind of shield machine arrives reception structure and the method for reseptance thereof of driving terminal
CN110374620A (en) * 2019-08-25 2019-10-25 贵州大学 The exploitation of mining heading equipment is crushed header structure

Similar Documents

Publication Publication Date Title
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN106285693B (en) A kind of closed reception construction method of shield steel bushing
CN103015402B (en) Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN107035401A (en) A kind of abandoned mine fire damp administers new technology
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN102444118A (en) Construction method for grouting reinforcement of sleeve valve pipe
CN103883796B (en) Silt particle mud district hand pick formula jacking construction device and method
CN108797621A (en) A kind of water sealing structure and its construction method in rich water depth ovum gravel erratic boulder stratum front pre-grouting
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN104018842A (en) Receiving structure and receiving method used when shield tunneling machine reaches tunneling end point
CN203835397U (en) Receiving structure used when shield tunneling machine reaches tunneling terminal
CN203702070U (en) Coal mine low pumping lane borehole slag-returning sealing apparatus
CN203335086U (en) Shield end strengthening structure
CN103742098A (en) Device and method for sealing hole by using returned slag of layer-through drill hole of low drainage roadway of coal mine
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN106801427A (en) Foundation ditch horizontal precipitation device and its application method
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN104060613B (en) The directed slip casting structure of interlocking pile and interlocking pile directed grouting and reinforcing soil body method
CN207498973U (en) A kind of power station grout curtain cuts dirty drainage tube
CN202247855U (en) Device for rapidly solidifying soft foundation
CN205894074U (en) Take full -rotating drill steel casing pipe of drain hole
CN107975027A (en) The construction method that shield launching is reinforced with reaching end soil body
CN210564650U (en) Assembled slurry storage device for filling underwater deep closed space
CN212223832U (en) Deep silt foundation treatment structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20200504

CF01 Termination of patent right due to non-payment of annual fee