CN203834974U - High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures - Google Patents

High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures Download PDF

Info

Publication number
CN203834974U
CN203834974U CN201420177483.8U CN201420177483U CN203834974U CN 203834974 U CN203834974 U CN 203834974U CN 201420177483 U CN201420177483 U CN 201420177483U CN 203834974 U CN203834974 U CN 203834974U
Authority
CN
China
Prior art keywords
ring beam
towering
beams
inner ring
supporting platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420177483.8U
Other languages
Chinese (zh)
Inventor
丁江峰
杨斌
袁文博
赖犇
熊国涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China No 15 Metallurgical Construction Group Co Ltd
Original Assignee
China No 15 Metallurgical Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China No 15 Metallurgical Construction Group Co Ltd filed Critical China No 15 Metallurgical Construction Group Co Ltd
Priority to CN201420177483.8U priority Critical patent/CN203834974U/en
Application granted granted Critical
Publication of CN203834974U publication Critical patent/CN203834974U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a high-altitude supporting platform used for concrete pouring of top plates of large towering tube structures. The high-altitude supporting platform is characterized in that the high-altitude supporting platform comprises ring supporting beams which are a bracket ring beam, a drum ring and an inner ring beam respectively and distributed at equal intervals, and 48 radial beams are evenly distributed around the three ring supporting beams; a lower ring beam with the diameter equal to that of the inner ring beam is suspended under the inner ring beam through 24 pieces of I-steel, at least three layers of #-shaped support beams are arranged between the inner ring beam and the lower ring beam, and 48 diagonal beams are arranged between the lower ring beam and the bracket ring beam in a tensioning mode; the inner ring beam and the drum ring are respectively provided with 32 evenly distributed diagonal steel ropes. When the high-altitude supporting platform is used for construction of the concrete top plates of the towering tube structures, safety is greatly improved, the construction period can be shortened, the construction cost is reduced, and the high-altitude supporting platform is mainly applied to concrete pouring construction of the top plates of large towering tubes.

Description

一种用于大型高耸筒体结构混凝土顶板浇注的高空支撑钢平台A high-altitude supporting steel platform for pouring the concrete roof of a large towering cylindrical structure

技术领域 technical field

本实用新型涉及建筑施工技术领域,尤其是一种用于大型高耸筒体结构混凝土顶板浇注的高空支撑钢平台。 The utility model relates to the technical field of building construction, in particular to a high-altitude supporting steel platform for pouring concrete top plates of large towering cylinder structures.

背景技术 Background technique

目前,工业建筑施工中,对于高度40米以上,直径20米以上的大型高耸筒体结构混凝土顶板施工难度极大,传统方法是采用钢管脚手架支撑,存在的问题是:超高脚手架搭设危险系数大,施工周期长,施工成本高。 At present, in the construction of industrial buildings, it is extremely difficult to construct the concrete roof of a large towering cylindrical structure with a height of more than 40 meters and a diameter of more than 20 meters. The traditional method is to use steel pipe scaffolding for support. The existing problem is: the risk factor of super high scaffolding is large , The construction period is long and the construction cost is high.

实用新型内容 Utility model content

本实用新型的目的就是要解决传统方法采用钢管脚手架支撑施工大型高耸筒体混凝土顶板结构,危险系数大,施工周期长,施工成本高的问题,提供一种用于大型高耸筒体结构混凝土顶板浇注的高空支撑钢平台。 The purpose of this utility model is to solve the traditional method of using steel pipe scaffolding to support the construction of a large-scale towering cylinder concrete roof structure, which has a large risk factor, a long construction period, and high construction costs. It provides a concrete roof pouring method for a large towering cylinder structure. high-altitude supporting steel platform.

本实用新型的具体方案是:用于大型高耸筒体结构混凝土顶板浇注的高空支撑钢平台,其特征是:包括有牛腿环梁、鼓圈、内环梁三个等距离分布的环形支撑梁,环绕三个环形支撑梁均布有48根放射梁,且在内环梁正下方通过24根工字钢吊装有一个等直径的下环梁,在内环梁及下环梁之间至少设有三层井字形支架梁,在下环梁与牛腿环梁之间拉设48根斜拉梁;并在内环梁和鼓圈上各设有32根均布的斜拉钢绳。 The specific scheme of the utility model is: a high-altitude supporting steel platform for pouring the concrete roof of a large towering cylinder structure, which is characterized in that it includes three equidistant annular support beams: a corbel ring beam, a drum ring, and an inner ring beam. , there are 48 radial beams evenly distributed around the three circular support beams, and a lower ring beam of equal diameter is hoisted by 24 I-beams just below the inner ring beam, and at least There are three layers of well-shaped support beams, 48 cable-stayed beams are stretched between the lower ring beam and the corbel ring beam; and 32 evenly distributed cable-stayed steel cables are installed on the inner ring beam and the drum ring.

本实用新型中所述牛腿环梁及内环梁均采用两根10#槽钢背扣] [组成,鼓圈为2根16#槽钢对扣[]组成。 The corbel ring beam and the inner ring beam described in the utility model all adopt two 10# channel steel buckles][ to form, and the drum ring is composed of 2 16# channel steel buckles[].

本实用新型中所述放射梁均为16#槽钢。 Radiation beams described in the utility model are all 16# channel steel.

本实用新型中所述井字形支架梁是采用L100×10角钢制成。 The well-shaped support beam described in the utility model is made of L100×10 angle steel.

本实用新型中所述斜拉钢绳为Φ20㎜的钢丝绳。 The cable-stayed steel rope described in the utility model is a steel wire rope of Φ20mm.

本实用新型制作取材方便,所有连接处可采用高强螺栓连接,平台材料安拆方便,可重复利用。采用本实用新型方法施工高空作业风险大大降低,施工安全进度快,同时能降低施工成本,给企业带来巨大的经济效益。 The utility model is convenient to manufacture and obtain materials, and all joints can be connected by high-strength bolts, and the platform materials are convenient to install and disassemble, and can be reused. Adopting the method of the utility model greatly reduces the risk of construction high-altitude operations, and the progress of construction safety is fast. At the same time, the construction cost can be reduced, and huge economic benefits are brought to the enterprise.

附图说明 Description of drawings

图1是本实用新型搭建结构主视示意图; Fig. 1 is a schematic diagram of the front view of the construction structure of the utility model;

图2是本实用新型结构俯视示意图。 Fig. 2 is a schematic top view of the structure of the utility model.

图中:1—筒体,2—顶板,3—牛腿环梁,4—鼓圈,5—放射梁,6—内环梁,7—吊环,8—斜拉钢绳,9—斜拉梁,10—工字钢,11—下环梁,12—钢制牛腿,13—井字形支架梁。 In the figure: 1—cylinder, 2—roof, 3—corbel ring beam, 4—drum ring, 5—radiating beam, 6—inner ring beam, 7—hanging ring, 8—cable-stayed steel rope, 9—cable-stayed Beam, 10—I-beam, 11—lower ring beam, 12—steel corbel, 13—well-shaped support beam.

具体实施方式 Detailed ways

参见图1、2,用于施工一个高45米,筒体内圈直径为22米的大型高耸筒体1混凝土顶板2的高空支撑钢平台,它包括有牛腿环梁3、鼓圈4、内环梁6三个等距离分布的环形支撑梁(直径分别为22米、14米、6米),环绕三个环形支撑梁均布有48根放射梁5,且在内环梁6正下方通过24根工字钢10吊装有一个等直径的下环梁11,在内环梁6及下环梁11之间至少设有三层井字形支架梁13,在下环梁11与牛腿环梁3之间拉设48根斜拉梁9;并在内环梁6和鼓圈4上各设有32根均布的斜拉钢绳8。 Referring to Figures 1 and 2, it is used to construct a high-altitude supporting steel platform of a large towering cylinder 1 with a concrete roof 2 with a diameter of 22 meters and a height of 45 meters. It includes a corbel ring beam 3, a drum ring 4, an inner The ring beam 6 has three equidistant annular support beams (diameters of 22 meters, 14 meters, and 6 meters respectively), and 48 radial beams 5 are evenly distributed around the three annular support beams, and pass directly under the inner ring beam 6. 24 I-beams 10 are hoisted with a lower ring beam 11 of equal diameter. There are at least three layers of well-shaped support beams 13 between the inner ring beam 6 and the lower ring beam 11. 48 cable-stayed beams 9 are set between them; and 32 evenly distributed cable-stayed steel ropes 8 are respectively arranged on the inner ring beam 6 and the drum ring 4 .

本实施例中所述牛腿环梁3及内环梁6均采用两根10#槽钢背扣] [组成,鼓圈4为2根16#槽钢对扣[]组成。 Corbel ring beam 3 and inner ring beam 6 described in the present embodiment are all made up of two 10# channel steel buckles][, and the drum ring 4 is composed of two 16# channel steel buckles[].

本实施例中所述放射梁5均为16#槽钢。 The radiation beams 5 described in this embodiment are all 16# channel steel.

本实施例中所述井字形支架梁13是采用L100×10角钢制成。 The well-shaped support beam 13 in this embodiment is made of L100×10 angle steel.

本实施例中所述斜拉钢绳为Φ20㎜的钢丝绳。 The cable-stayed steel rope described in this embodiment is a Φ20mm steel wire rope.

本实用新型应用时,将牛腿环梁放置在预设的钢制牛腿12上,并将内环梁和鼓圈上的64根斜拉钢绳8与筒体上的预埋件吊环7拉接,参见图1。 When the utility model is applied, the corbel ring beam is placed on the preset steel corbel 12, and the 64 cable-stayed steel ropes 8 on the inner ring beam and the drum ring are connected with the embedded part suspension ring 7 on the cylinder body. Pull connection, see Figure 1.

Claims (5)

1. the high-altitude steel supporting platform of pouring into a mould for large-scale towering tubular construction concrete roof, it is characterized in that: include the annular brace beam that bracket ring beam, drum circle, three of inner ring beams equidistantly distribute, around three annular brace beams, be evenly equipped with 48 radial beams, and by 24 i iron, be lifted with an isodiametric lower ring under inner ring beam, between inner ring beam and lower ring, be at least provided with three layers of groined type rack beams, between lower ring and bracket ring beam, draw and establish 48 oblique pull beams; And in inner ring beam and drum circle, be respectively provided with 32 uniform oblique pull steel cables.
2. a kind of high-altitude steel supporting platform for large-scale towering tubular construction concrete roof cast according to claim 1, it is characterized in that: described bracket ring beam and inner ring beam all adopt two 10# channel-section steel back of the body buttons] [form, drum circle is that 2 16# channel-section steel make-ups [] form.
3. a kind of high-altitude steel supporting platform for large-scale towering tubular construction concrete roof cast according to claim 1, is characterized in that: described radial beam is 16# channel-section steel.
4. a kind of high-altitude steel supporting platform for large-scale towering tubular construction concrete roof cast according to claim 1, is characterized in that: described groined type rack beams is to adopt L100 * 10 angle steel to make.
5. a kind of high-altitude steel supporting platform for large-scale towering tubular construction concrete roof cast according to claim 1, is characterized in that: described oblique pull steel cable is the wire rope of Φ 20 ㎜.
CN201420177483.8U 2014-04-14 2014-04-14 High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures Expired - Fee Related CN203834974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420177483.8U CN203834974U (en) 2014-04-14 2014-04-14 High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420177483.8U CN203834974U (en) 2014-04-14 2014-04-14 High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures

Publications (1)

Publication Number Publication Date
CN203834974U true CN203834974U (en) 2014-09-17

Family

ID=51512834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420177483.8U Expired - Fee Related CN203834974U (en) 2014-04-14 2014-04-14 High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures

Country Status (1)

Country Link
CN (1) CN203834974U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120481842A (en) * 2025-07-11 2025-08-15 聚变新能(安徽)有限公司 Transfer device and transfer method for transferring polar field coils of nuclear fusion device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120481842A (en) * 2025-07-11 2025-08-15 聚变新能(安徽)有限公司 Transfer device and transfer method for transferring polar field coils of nuclear fusion device

Similar Documents

Publication Publication Date Title
CN202055241U (en) Steel reinforcement cage suspension ring device
CN204899180U (en) Steel construction jar body aerial working platform simply sets up device
CN103993745B (en) An integral hoisting device for a transfer beam and its hoisting method
CN104195948B (en) Bridge suspension pipe pushing installation construction method
CN103147582A (en) Overhead cantilever formwork construction method
CN206720558U (en) A kind of adjustable steel-reinforcement cage hanger
CN206319597U (en) A kind of cantilever steel girder erecting device
CN102434001B (en) Construction method of steel beam-steel pipe concrete column and reinforced concrete beam through connection node structure
CN203834974U (en) High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures
CN204280974U (en) A kind of template hoisting device
CN203603436U (en) Chimney cylinder wall concrete pouring combined platform
CN201567793U (en) Simple distributing device for concrete pouring construction of high-rise buildings
CN104005564B (en) The mounting process of the oblique column of a kind of large-scale steel pipe
CN204369491U (en) A kind of pipe hanger
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN103362315B (en) A kind of hanger used for overall hoisting of pipelines and its construction method
CN205206278U (en) Construction is with combination gallows operation platform
CN205116854U (en) Coal scuttle is portable platform for aggregate erection
CN203230166U (en) Special high-altitude emplacement platform
CN101832020B (en) Truss type operating platform
CN204530479U (en) The interim counter-force bracing or strutting arrangement of a kind of bridge jacking
CN104328743A (en) Bridge jacking temporary counter-force support device and counter-force support method
CN103912125A (en) Large-sized towering tubular-structure concrete roof pouring method
CN209923970U (en) Bailey beam fixing device for suspension pipeline
CN203452072U (en) Control device of anchor cable protection layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20200414