CN203822324U - Underground shield assembling prefabricated concrete square box - Google Patents

Underground shield assembling prefabricated concrete square box Download PDF

Info

Publication number
CN203822324U
CN203822324U CN201420238722.6U CN201420238722U CN203822324U CN 203822324 U CN203822324 U CN 203822324U CN 201420238722 U CN201420238722 U CN 201420238722U CN 203822324 U CN203822324 U CN 203822324U
Authority
CN
China
Prior art keywords
culvert
contained
components
groove
contain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420238722.6U
Other languages
Chinese (zh)
Inventor
马海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN ZHONGNAN EXTENSION RESOURCES AND ENVIRONMENTAL TECHNOLOGY RESEARCH Co Ltd
Original Assignee
DALIAN ZHONGNAN EXTENSION RESOURCES AND ENVIRONMENTAL TECHNOLOGY RESEARCH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN ZHONGNAN EXTENSION RESOURCES AND ENVIRONMENTAL TECHNOLOGY RESEARCH Co Ltd filed Critical DALIAN ZHONGNAN EXTENSION RESOURCES AND ENVIRONMENTAL TECHNOLOGY RESEARCH Co Ltd
Priority to CN201420238722.6U priority Critical patent/CN203822324U/en
Application granted granted Critical
Publication of CN203822324U publication Critical patent/CN203822324U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to an underground shield assembling prefabricated concrete square box. The underground shield assembling prefabricated concrete square box is characterized in that one end of a first-section square box (1) is provided with a straight port, the other end of the first-section square box (1) is provided with an inclined port, upper half square components (2) and lower half square components (5) are both manufactured into parallelogram U-shaped grooves, and the included angle between each long side and the corresponding short side is alpha, wherein the upper half square components (2) and the lower half square components (5) are connected with the inclined port; the portions between the upper half square components (2) and the lower half square components (5), between every two adjacent upper half square components (2) and between every two adjacent lower half square components (5) are respectively provided with a connecting groove (11); components are fixed together in the connecting grooves (11) through connecting boards (8), studs (10), gaskets (7) and nuts (9); connecting board fixing steel bars (6) are welded to the two ends of each connecting board (8); the connecting board fixing steel bars (6) are fixed to concrete components. According to the underground shield assembling prefabricated concrete square box, the ground does not need to be ditched and grooved, pipe gallery construction cost is saved, and speed is high.

Description

The assembled concrete prefabricated square culvert of Tunnel Boring
Technical field
The utility model belongs to underground prefabricating square culvert, and particularly a kind of Urban Underground takes shield machine shield structure tunnel out to make the assembled concrete prefabricated square culvert of land used Tunnel Boring.
Background technology
At present, that the Urban Underground construction of many developed countries of the world has all adopted is advanced, economize on resources, be conducive to create harmonious ecology environment and environmental protection, and the phenomenon of solved repeatedly ditching pipe laying, burying cable occurs; So occurred at embedded underground prefabricating square culvert, formed Urban Underground piping lane.The construction of underground pipe gallery in the past exists that fluting area is large, engineering (earthwork) amount greatly, the deficiencies such as long construction period.So adopt now shield machine, the tunnel that once shield structure goes out to install Fang Han on ground.But existing concrete square is contained, and cannot be transported in tunnel and install, bring technical barrier to advanced technology.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, provides one can in Fang Han, transport prefabricating square culvert member, the assembled concrete prefabricated square culvert of Tunnel Boring quick for installation in shield structure tunnel.
The technical scheme that the utility model technical solution problem adopts is: the assembled concrete prefabricated square culvert of a kind of Tunnel Boring, it is characterized in that first segment Fang Han makes one end for straight mouthful, the other end is angle, the upper en culvert member being connected with angle and lower en culvert member are all made the U-shaped groove of parallelogram, the angle of long limit and minor face is α, and the width that upper en is contained member and lower en culvert fresh kidney beans is L; Above the left side of upper en culvert member, be provided with en and contain boss; Be provided with en below and contain groove, above right side, be provided with en and contain groove, be provided with lower en below and contain groove; The lower left that lower en is contained member is provided with lower en culvert boss, is provided with lower en above and contains groove, is provided with lower en and contains boss above right side, is provided with lower en below and contains groove; Upper en contains that member is contained between member with lower en, adjacent two upper ens are contained between members and between adjacent two lower ens culvert members and are equipped with connecting groove; The joint of each concrete component is equipped with the stairstepping socket of boss and groove; In connecting groove, with junction plate, stud, pad and nut, its each member is fixed together; Junction plate two ends are welded with the fixing reinforcing bar of junction plate; The fixing reinforcing bar of junction plate is fixed in concrete component.Upper en contains member and lower en is contained the long limit of member and the angle α=30--80 ° of minor face.Upper en is contained the width L=500--5000mm of member and lower en culvert member.
The beneficial effects of the utility model are: this invention has solved the technical barrier that adopts shield machine shield formation underground passage of shield machine that square piping lane is installed, and not be used in ground ditching fluting, saves the cost that piping lane is built, and speed is fast.
Brief description of the drawings
Below in conjunction with accompanying drawing, illustrate with embodiment.
Fig. 1 is the assembled concrete prefabricated square culvert front view of Tunnel Boring;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the left side view of Fig. 1;
Fig. 4 is the top view that the upper en in Fig. 1 is contained member;
Fig. 5 is the top view that the lower en in Fig. 1 is contained member;
Fig. 6 is the I place partial enlarged drawing in Fig. 1.
In figure: 1-side is contained; The upper en of 2-is contained member; The upper en of 3-is contained boss; Under 4-, en is contained boss; Under 5-, en is contained member; 6-junction plate is fixed reinforcing bar; 7-pad; 8-junction plate; 9-nut; 10-stud; 11-connecting groove; The upper en of 12-is contained groove; Under 13-, en is contained groove; 14-connecting through hole.
Detailed description of the invention
Embodiment, with reference to accompanying drawing, the assembled concrete prefabricated square culvert of a kind of Tunnel Boring, it is characterized in that it is straight mouthful that one end is made in first segment side's culvert 1, the other end is angle, the upper en culvert member 2 being connected with angle and lower en culvert member 5 are all made the U-shaped groove of parallelogram, and the angle of long limit and minor face is α, and the width that upper en is contained member 2 and lower en culvert member 5 is L; Above the left side of upper en culvert member 2, be provided with en and contain boss 3; Be provided with en below and contain groove 12, above right side, be provided with en and contain groove 12, be provided with lower en below and contain groove 13; The lower left that lower en is contained member 5 is provided with lower en culvert boss 4, is provided with lower en above and contains groove 13, is provided with lower en and contains boss 4 above right side, is provided with lower en below and contains groove 3; Upper en contains member 2 and lower en is contained between member 5, adjacent two upper ens contain between member 2 and adjacent two lower ens are contained between member 5, all there is no connecting groove 11; The joint of each concrete component is equipped with the stairstepping socket of boss and groove; In connecting groove 11, with junction plate 8, stud 10, pad 7 and nut 9, its each member is fixed together; Junction plate 8 two ends are welded with the fixing reinforcing bar 6 of junction plate; The fixing reinforcing bar 6 of junction plate is fixed in concrete component.Upper en contains member 2 and lower en is contained the long limit of member 5 and angle α=50 ° of minor face.Upper en is contained the width L=2000mm of member 2 and lower en culvert member 5.Upper en contains member and 2 times ens culvert member 5 turnings all do not have connecting through hole 14, in connecting through hole 14, puts on steel strand, and stretch-draw is contained together in general side.Four sockets of side's culvert 1 right-hand member angle, upper en culvert member 2 and lower en culvert member 5 are all made the stairstepping socket of boss and groove.
The assembling process of Fang Han is: first first side will be contained to 1(one end for straight mouthful, the other end is angle) install in the underground tunnel of digging, straight mouthful of end will be provided with the well head (vertical or tilt) of the earth rock that lower member excavates out with shield machine, when on transporting, en is contained member 2 or lower en culvert member 5, to first transport lower en and contain member 5, while transporting, plane is downward, upwards, groove is downward for left end boss; Contain 1 angle to connecting with side; On transporting, en is contained when member 2, and by plane upwards, left end boss is downward, and groove upwards, to after getting well, then is fixed connection with stud 10 mutual ladder interface.

Claims (3)

1. the assembled concrete prefabricated square culvert of Tunnel Boring, it is characterized in that first segment Fang Han (1) makes one end for straight mouthful, the other end is angle, the upper en culvert member (2) being connected with angle and lower en culvert member (5) are all made the U-shaped groove of parallelogram, the angle of long limit and minor face is α, and the width that upper en is contained member (2) and lower en culvert member (5) is L; Above the left side of upper en culvert member (2), be provided with en and contain boss (3); Be provided with en below and contain groove (12), above right side, be provided with en and contain groove (13), the lower left that lower en is contained member (5) is provided with lower en culvert boss (4), be provided with lower en above and contain groove (13), above right side, be provided with lower en and contain boss (4), be provided with lower en below and contain groove (13); Upper en contains member (2) and second is contained between member (5), and adjacent two upper ens are contained between member (2), and adjacent two lower ens are contained between member (5) does not all have connecting groove (11); The joint of each concrete component is equipped with the stairstepping socket of boss and groove; In connecting groove (11), with junction plate (8), stud (10), pad (7) and nut (9), its each member is fixed together; Junction plate (8) two ends are welded with the fixing reinforcing bar (6) of junction plate; Junction plate is fixed reinforcing bar (6) and is fixed in concrete component.
2. the assembled concrete prefabricated square culvert of Tunnel Boring according to claim 1, is characterized in that en is contained member (2) and lower en is contained the long limit of member (5) and the angle α=30--80 ° of minor face.
3. the assembled concrete prefabricated square culvert of Tunnel Boring according to claim 1, is characterized in that en contains the width L=500-5000mm of member (2) and lower en culvert member (5).
CN201420238722.6U 2014-05-12 2014-05-12 Underground shield assembling prefabricated concrete square box Withdrawn - After Issue CN203822324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420238722.6U CN203822324U (en) 2014-05-12 2014-05-12 Underground shield assembling prefabricated concrete square box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420238722.6U CN203822324U (en) 2014-05-12 2014-05-12 Underground shield assembling prefabricated concrete square box

Publications (1)

Publication Number Publication Date
CN203822324U true CN203822324U (en) 2014-09-10

Family

ID=51477837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420238722.6U Withdrawn - After Issue CN203822324U (en) 2014-05-12 2014-05-12 Underground shield assembling prefabricated concrete square box

Country Status (1)

Country Link
CN (1) CN203822324U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953359A (en) * 2014-05-12 2014-07-30 大连中南维拓资源与环境技术研究有限公司 Underground shield-assembling concrete precast square culvert

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953359A (en) * 2014-05-12 2014-07-30 大连中南维拓资源与环境技术研究有限公司 Underground shield-assembling concrete precast square culvert

Similar Documents

Publication Publication Date Title
CN202280462U (en) Pipe segment for building subway station through large-diameter shield tunneling expanded excavation
CN205778883U (en) Jacking construction and the connection transfer device of shield-tunneling construction in a kind of tunnel
CN205171549U (en) Piping lane prefab and prefabricated formula utility tunnel
CN103953359A (en) Underground shield-assembling concrete precast square culvert
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN103470268B (en) The asymmetric double-hole tunnel structure of zero spacing and construction method thereof
CN203822324U (en) Underground shield assembling prefabricated concrete square box
CN215519142U (en) Lap joint assembly type energy-saving building
CN206668287U (en) A kind of combined steel pipe concrete bow member for supporting
CN106558862A (en) Assembled cable duct bank mounting structure
CN202228785U (en) Jack type pipe-jacking head for long transmission pipeline
CN206971233U (en) A kind of supporting construction for deep basal pit
CN201671638U (en) Karst tunnel equipped with water stop strip
CN212177148U (en) Symmetrical horseshoe-shaped assembled concrete tunnel
CN208870081U (en) A kind of structure of subway station in conjunction with municipal bridge
CN109056639B (en) Spliced movable flood control wall
CN207405657U (en) A kind of cable-stayed type immersed tube tunnel structure
CN205776356U (en) Plug-in Pipe rack
CN203905024U (en) Internal corner connecting piece of foundation pit supporting system
CN111733882A (en) Assembled underground utility tunnel cross connected node
CN101892844A (en) Method for excavating tunnels undergoing advanced bolting by using CRD
CN204875853U (en) Assembled underground piping lane
CN215410527U (en) Utility tunnel pipeline safety fixed bolster
CN205205885U (en) Steel stand verticality deviation processing unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140910

Effective date of abandoning: 20150820

C20 Patent right or utility model deemed to be abandoned or is abandoned