CN203822226U - 套管补贴分层注水管柱 - Google Patents
套管补贴分层注水管柱 Download PDFInfo
- Publication number
- CN203822226U CN203822226U CN201420252385.6U CN201420252385U CN203822226U CN 203822226 U CN203822226 U CN 203822226U CN 201420252385 U CN201420252385 U CN 201420252385U CN 203822226 U CN203822226 U CN 203822226U
- Authority
- CN
- China
- Prior art keywords
- water injection
- layer
- tube
- injection pipe
- patching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Earth Drilling (AREA)
Abstract
一种套管补贴分层注水管柱,上注水层、下注水层与套管联通,在套管上有破损段,破损段处于上注水层、下注水层之间,在其破损段打入补贴管,密封筒先安装在补贴管内后随补贴管下入套管内,向套管内下入外层注水管,套管与外层注水管之间形成外环空通道,外层注水管的下部处于补贴管之上,插入密封管连接在内层注水管的下部后随其下入外层注水管内,外层注水管与内层注水管形成内环空通道,插入密封管插入密封筒内,插入密封管与密封筒配合密封,内层注水管、插入密封管与下注水层相通,将上注水层、下注水层隔开,实现分层注水,满足油田分层注水开发的要求,可以提高油田开发效果,具有显著的经济效益。
Description
技术领域
本实用新型是油田注水管柱,是一种套管破损处进行套管补贴后下入的一种分层注水管柱,具体是一种套管补贴分层注水管柱。
背景技术
注水井经多年的注水开发后,很多套管都出现了破损、变形等问题。出现这些问题后要采用套管补贴方法将套管破裂处补贴起来,防止套管漏失,套管补贴是将贴堵管下于套管破裂处,将泥浆灌入套管与贴堵管之间,泥浆凝固后,使套管与贴堵管固结成一体,从而将套管破裂处修补完好,使注水井能正常生产。由于套管补贴后其内径变小,普通分层注水工具不能使用。因此,套管补贴井不能进行分层注水,影响油田注水采油。
发明内容
本实用新型的目的是提供一种套管补贴分层注水管柱,使其套管补贴井能分层注水,提高油田开发效果。
本实用新型的目的是这样实现的:包括套管、外层注水管、内层注水管、插入密封管、密封筒、补贴管,上注水层、下注水层与套管联通,在套管上有破损段,破损段处于上注水层、下注水层之间,在其破损段打入补贴管,密封筒先安装在补贴管内后随补贴管下入套管内,向套管内下入外层注水管,套管与外层注水管之间形成外环空通道,外层注水管的下部处于补贴管之上,插入密封管连接在内层注水管的下部后随其下入外层注水管内,外层注水管与内层注水管形成内环空通道,插入密封管插入密封筒内,插入密封管与密封筒配合密封,内层注水管、插入密封管与下注水层相通。
外层注水管的上部入口处安装上层流量调节器,内层注水管的上部入口处安装下层流量调节器。
外层注水管、内层注水管的上部悬挂在井口装置上,外层注水管、内层注水管下部处于悬吊状态。
本实用新型的有益效果是:对套管破损处进行补贴时下入了密封筒,使其可以与后下入的插入密封管配合密封,从而将上注水层、下注水层隔开,形成了外环空通道、内环空通道,外环空通道与上注水层相通,从外层注水管注入的水可以注入上注水层里,内层注水管注入的水可以注入下注水层里,实现分层注水,并且配注量在地面控制,对各层的调配方便,能及时配注,提高注水层的层段合格率,满足油田分层注水开发的要求,可以提高油田开发效果,具有显著的经济效益。
附图说明
图1是本实用新型实施例的示意图。
具体实施方式
下面结合附图对本实用新型的实施例进行说明:
由图1可知,本实用新型的实施例包括下层流量调节器1、上层流量调节器2、套管5、外层注水管6、内层注水管7、插入密封管10、密封筒11、补贴管12,上注水层3、下注水层4与套管5联通,在套管5上有破损段,破损段处于上注水层3、下注水层4之间,在其破损段打入补贴管12,密封筒11先安装在补贴管12内后随补贴管12下入套管5内,密封筒11与补贴管12之间安装了密封装置,两者之间的间隙处不会漏失,向套管5内下入外层注水管6,套管5与外层注水管6之间形成外环空通道8,外层注水管6的下部处于补贴管12之上,插入密封管10连接在内层注水管7的下部后随其下入外层注水管6内,外层注水管6与内层注水管7形成内环空通道9,插入密封管10插入密封筒11内,插入密封管10与密封筒11配合密封,密封性能由安装在插入密封管10上的密封装置实现,内层注水管7、插入密封管10与下注水层4相通。外层注水管6的上部入口处安装上层流量调节器2,内层注水管7的上部入口处安装下层流量调节器1,可以对上注水层3、下注水层4的注入情况分别控制和计量。外层注水管6、内层注水管7的上部悬挂在井口装置上,外层注水管6、内层注水管7下部处于悬吊状态,主要是为了便于调配管柱长度,方便施工。
Claims (3)
1.一种套管补贴分层注水管柱,包括套管(5)、外层注水管(6)、内层注水管(7)、插入密封管(10)、密封筒(11)、补贴管(12),上注水层(3)、下注水层(4)与套管(5)联通,在套管(5)上有破损段,破损段处于上注水层(3)、下注水层(4)之间,在其破损段打入补贴管(12),其特征是:密封筒(11)先安装在补贴管(12)内后随补贴管(12)下入套管(5)内,向套管(5)内下入外层注水管(6),套管(5)与外层注水管(6)之间形成外环空通道(8),外层注水管(6)的下部处于补贴管(12)之上,插入密封管(10)连接在内层注水管(7)的下部后随其下入外层注水管(6)内,外层注水管(6)与内层注水管(7)形成内环空通道(9),插入密封管(10)插入密封筒(11)内,插入密封管(10)与密封筒(11)配合密封,内层注水管(7)、插入密封管(10)与下注水层(4)相通。
2.根据权利要求1所述的套管补贴分层注水管柱,其特征是:外层注水管(6)的上部入口处安装上层流量调节器(2),内层注水管(7)的上部入口处安装下层流量调节器(1)。
3.根据权利要求1或2所述的套管补贴分层注水管柱,其特征是:外层注水管(6)、内层注水管(7)的上部悬挂在井口装置上,外层注水管(6)、内层注水管(7)下部处于悬吊状态。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420252385.6U CN203822226U (zh) | 2014-05-18 | 2014-05-18 | 套管补贴分层注水管柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420252385.6U CN203822226U (zh) | 2014-05-18 | 2014-05-18 | 套管补贴分层注水管柱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203822226U true CN203822226U (zh) | 2014-09-10 |
Family
ID=51477739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420252385.6U Withdrawn - After Issue CN203822226U (zh) | 2014-05-18 | 2014-05-18 | 套管补贴分层注水管柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203822226U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953304A (zh) * | 2014-05-18 | 2014-07-30 | 中国石油化工股份有限公司 | 套管补贴分层注水管柱 |
-
2014
- 2014-05-18 CN CN201420252385.6U patent/CN203822226U/zh not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953304A (zh) * | 2014-05-18 | 2014-07-30 | 中国石油化工股份有限公司 | 套管补贴分层注水管柱 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061684B (zh) | 裸眼水平井分段多簇均匀酸化管柱及其酸化方法 | |
CN103075179B (zh) | 本煤层瓦斯抽采钻孔双管抽采方法 | |
CN203655249U (zh) | 一种地浸采铀工艺井 | |
CN105358792A (zh) | 使用单个井眼和多通道管道从诱导裂缝生产油的方法 | |
CN203808945U (zh) | 裸眼筛管完井水平井根部堵水控水工艺管柱 | |
CN205225215U (zh) | 一种用于两套油层分层开采的开采装置 | |
CN103874827A (zh) | 用于井眼的流体过滤装置和完成井眼的方法 | |
CN103806879B (zh) | 一种海上油田同井采注安全生产管柱 | |
CN105443098A (zh) | 一种煤矿井下钻孔分段定点水力压裂固孔装置及方法 | |
CN102953716A (zh) | 平行双管分层注水管柱 | |
CN203685139U (zh) | 一种海上定向井射孔、压裂、采油一体化管柱 | |
CN203362145U (zh) | 一种压裂防砂一体化完井管柱 | |
CN202707018U (zh) | 一种桥式偏心过流配水器及其堵塞器 | |
WO2021022909A1 (zh) | 堆积封隔颗粒实现自堵水的方法、自堵水管柱和完井结构 | |
RU2578095C1 (ru) | Способ изоляции притока вод в необсаженном горизонтальном участке ствола добывающей скважины | |
CN203822226U (zh) | 套管补贴分层注水管柱 | |
CN204212753U (zh) | 上层分层注聚下层笼统注水工艺管柱 | |
CN203822278U (zh) | 一种套管补贴井分层注水装置 | |
CN206158709U (zh) | 支撑式注水管柱 | |
CN103321626B (zh) | 一种压裂防砂一体化完井管柱及其应用方法 | |
CN103953304B (zh) | 套管补贴分层注水管柱 | |
CN204126618U (zh) | 上层笼统注聚下层笼统注水工艺管柱 | |
CN204703878U (zh) | 一种高配注量水平井两段分段注水管柱 | |
CN204532300U (zh) | 一种水平注水井两层分注装置 | |
CN205858195U (zh) | 一种水平井油层套管的试压管柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140910 Effective date of abandoning: 20160706 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |