CN203814300U - Supporting rack for high and large tree in landscape engineering - Google Patents
Supporting rack for high and large tree in landscape engineering Download PDFInfo
- Publication number
- CN203814300U CN203814300U CN201420217231.3U CN201420217231U CN203814300U CN 203814300 U CN203814300 U CN 203814300U CN 201420217231 U CN201420217231 U CN 201420217231U CN 203814300 U CN203814300 U CN 203814300U
- Authority
- CN
- China
- Prior art keywords
- cannelure
- annular groove
- slide block
- clip
- sliding blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a supporting rack for a high and large tree in landscape engineering. The supporting rack comprises ground anchors, connecting rods and a clamp, wherein the connecting rods are hinged to the ground anchors, and an annular groove is formed in the bottom of the clamp. The clamp is formed by the way that two semicircular clamping plates of the same size are hinged. Sliding blocks which are hinged to the connecting rods are arranged in the annular groove of the clamp, and the sliding blocks are matched with sliding rails arranged on the side wall of the annular groove, so that the sliding blocks slide in the annular groove. Compression springs are further arranged inside the sliding blocks, and the two ends of each compression spring are connected with stopping plugs which are matched with fixing holes in the groove wall of the annular groove. In the process that the connecting rods are used for driving the sliding blocks to move, the compression springs drive the stopping plugs at the ends through elastic force to enter the fixing holes in the groove wall of the annular groove, so that the sliding blocks and the annular groove are clamped, the stopping plugs in the fixing holes are pushed into the annular groove, and accordingly the sliding blocks can move continuously in the annular groove. The supporting rack for the high and large tree in landscape engineering is convenient and rapid to mount, capable of being used repeatedly and capable of lowering daily maintenance cost.
Description
Technical field
The utility model relates to high megaphanerophyte steady in a kind of afforestation project.
Background technology
In municipal engineering construction or the processes such as exploitation at real estate, the status of afforestation project is more and more heavier at present, to such an extent as to afforestation project has become " bright spot " in above-mentioned engineering construction, in order to make " bright spot " more " bright ", to give prominence to afforestation effect, increase " attraction ", in a lot of afforestation projects, there is the situation of the high megaphanerophyte of plantation in enormous quantities, even plant the high megaphanerophyte of non-local ecosystem seeds.Because the tall and big arbor bodily form of planting is tall and big, after plantation, under the impact of wind-force etc., very easily tilt, skew.Therefore, the survival rate of the high megaphanerophyte of planting has been subject to very large impact.The high megaphanerophyte survival rate of planting is not high, just there will be the situation that affects view, increases cost.In order to increase the survival rate of the high megaphanerophyte of planting, in plantation work process, the wherein the most effective a kind of way of taking is exactly that wooden or bamboo etc. taper steady is installed on the arbor trunk of field planting.
The construction technology of this steady is: 1, choose 3,4 or the certain diameter of more, waddy, batten or the bamboo pole of certain length; 2,, centered by the trunk of the high megaphanerophyte of planting, apart from trunk, reasonably apart from (distance between waddy, batten or bamboo pole is also wanted rationally), the butt end of above-mentioned material is fixed on to ground or subsurface certain depth; 3, above-mentioned material taper end is all pushed into trunk apart from a cross section of ground reasonable altitudes, has certain intersection; 4,, by centered by the taper end of above-mentioned material and cross section to intersect with trunk, together with trunk one, reinstate iron wire or other material bundles.Like this, steady plays a high megaphanerophyte of stable planting, unlikelyly makes the high megaphanerophyte of planting under the impact of wind-force etc., occurs tilting, the phenomenon that skews, to increase its survival rate.
The arbor steady that uses above-mentioned material and technique to make is used in real engineering, has following drawback: 1, take a lot of work, time-consuming, speed of application is slow; 2, material is not ageing-resistant, and under the operation of nature such as wind, rain, daylight, intensity can obviously reduce, and in addition, material itself also exists the situations such as scar joint, splitting.Therefore, can cause steady intensity low, the life-span is short, to such an extent as to the seeking time of wanting that is less than use will be damaged; 3, manufacture craft is simple and crude, fixing not firm, easily goes to pot; 4, difficulty not at ordinary times, is built in ground.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, and high megaphanerophyte steady in a kind of afforestation project is provided, and this steady is made simple, is easy to build, easy to use, has greatly improved workman's operating efficiency.
The utility model is to address the above problem taked technical scheme to be: high megaphanerophyte steady in a kind of afforestation project, comprise earth anchor, the clip that is provided with cannelure with the hinged connecting rod of earth anchor and bottom, described clip is by two measure-alike hinged forming of semicircle clamp, in the cannelure of clip, be provided with the slide block hinged with connecting rod, slide block matches with the slide rail arranging on cannelure sidewall and realizes slide block and slide in cannelure, in described slide block, be also provided with Compress Spring, at the two ends of Compress Spring, be connected with the gear plug matching with fixing hole on cannelure cell wall, by connecting rod, drive in described slide block moving process, Compress Spring is entered in the fixing hole on cannelure cell wall by the gear of elastic force drive end, realize the clamping of slide block and cannelure, gear plug in fixing hole is pushed and in cannelure, realizes the continuation of slide block in cannelure and move.
On described clip circumference, sign has angle index, to measure the distance between connecting rod.
In described clip, be provided with air cushion, by inflating in air cushion, realize between trees and clip and clamping.
beneficial effect
The utility model is by being provided with the clip of cannelure, by being placed in cannelure with the hinged slide block of connecting rod, makes the utility model can adjust as required the distance between connecting rod, greatly facilitates people's Rapid Establishment steady when bad on ground.The utility model is provided with air cushion in clip, by inflating in air cushion, realizes between trees and clip and clamping, make the utility model can be used for the trees that thickness is different, and the utility model is easy for installation, quick, can be repeatedly used, reduced regular maintenance expense.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 be in the utility model clip look up structural representation;
Fig. 3 is structural representation during slide block and cannelure clamping in the utility model.
Mark in figure: 1, earth anchor, 2, connecting rod, 3, clip, 4, cannelure, 5, slide block, 6, slide rail.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated, as shown in the figure: high megaphanerophyte steady in a kind of afforestation project, comprise earth anchor 1, the clip 3 that is provided with cannelure 4 with the hinged connecting rod 2 of earth anchor 1 and bottom, described clip 3 is by two measure-alike hinged forming of semicircle clamp, in the cannelure 4 of clip 3, be provided with the slide block 5 hinged with connecting rod 2, slide block 5 matches and realizes slide block 5 in the interior slip of cannelure 4 with the slide rail 6 arranging on cannelure 4 sidewalls, in described slide block 5, be also provided with Compress Spring, at the two ends of Compress Spring, be connected with the gear plug matching with fixing hole on cannelure 4 cell walls, by connecting rod 2, drive in described slide block 5 moving process, Compress Spring is entered in the fixing hole on cannelure 4 cell walls by the gear of elastic force drive end, realize the clamping of slide block 5 and cannelure 4, gear plug in fixing hole is pushed and in cannelure 4, realizes the continuation of slide block 5 in cannelure 4 and move.
On described clip 3 circumference, sign has angle index, to measure the distance between connecting rod 2.
In described clip 3, be provided with air cushion, by inflating in air cushion, realize between trees and clip 3 and clamping.
Using method of the present utility model is: first clip 3 is stuck on trees, because clip 3 internal diameters are greater than tree diameters, make clip 3 rotatable and move up and down on trees, then earth anchor 1 is fixed on the ground, by promoting connecting rod 2, realize slide block 5 in the interior movement of cannelure 4, in slide block 5 moving process, Compress Spring enters in the fixing hole on cannelure 4 cell walls by the gear of elastic force drive end, realize the clamping of slide block 5 and cannelure 4, to the air cushion inflation in clip 3, realize between trees and clip 3 and clamping afterwards.
Claims (3)
1. high megaphanerophyte steady in an afforestation project, it is characterized in that: comprise earth anchor (1), the clip (3) that is provided with cannelure (4) with the hinged connecting rod (2) of earth anchor (1) and bottom, described clip (3) is by two measure-alike hinged forming of semicircle clamp, in the cannelure (4) of clip (3), be provided with the slide block (5) hinged with connecting rod (2), slide block (5) matches with the slide rail (6) arranging on cannelure (4) sidewall and realizes slide block (5) and slide in cannelure (4), described slide block is also provided with Compress Spring in (5), at the two ends of Compress Spring, be connected with the gear plug matching with fixing hole on cannelure (4) cell wall, by connecting rod (2), drive in described slide block (5) moving process, Compress Spring enters in the fixing hole on cannelure (4) cell wall by the gear of elastic force drive end, realize the clamping of slide block (5) and cannelure (4), gear plug in fixing hole is pushed and in cannelure (4), realizes the continuation of slide block (5) in cannelure (4) and move.
2. high megaphanerophyte steady in a kind of afforestation project according to claim 1, is characterized in that: on described clip (3) circumference, sign has angle index, to measure the distance between connecting rod (2).
3. high megaphanerophyte steady in a kind of afforestation project according to claim 1, is characterized in that: described clip is provided with air cushion in (3), by inflating in air cushion, realizes between trees and clip (3) and clamping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420217231.3U CN203814300U (en) | 2014-04-30 | 2014-04-30 | Supporting rack for high and large tree in landscape engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420217231.3U CN203814300U (en) | 2014-04-30 | 2014-04-30 | Supporting rack for high and large tree in landscape engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203814300U true CN203814300U (en) | 2014-09-10 |
Family
ID=51469860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420217231.3U Expired - Fee Related CN203814300U (en) | 2014-04-30 | 2014-04-30 | Supporting rack for high and large tree in landscape engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203814300U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103975824A (en) * | 2014-04-30 | 2014-08-13 | 洛阳理工学院 | High arbor rest for use in landscape engineering |
CN110202652A (en) * | 2019-07-08 | 2019-09-06 | 夏长中 | A kind of lumbering cohesion device |
-
2014
- 2014-04-30 CN CN201420217231.3U patent/CN203814300U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103975824A (en) * | 2014-04-30 | 2014-08-13 | 洛阳理工学院 | High arbor rest for use in landscape engineering |
CN103975824B (en) * | 2014-04-30 | 2016-01-20 | 洛阳理工学院 | High megaphanerophyte steady in a kind of afforestation project |
CN110202652A (en) * | 2019-07-08 | 2019-09-06 | 夏长中 | A kind of lumbering cohesion device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012040307A3 (en) | Adjustable racking system for solar array and method of construction of a solar array | |
CN203814300U (en) | Supporting rack for high and large tree in landscape engineering | |
CN103975824B (en) | High megaphanerophyte steady in a kind of afforestation project | |
CN206981809U (en) | A kind of construction servicing unit | |
CN204339745U (en) | Lever top plate drilling device | |
CN205527616U (en) | Multistage automatic telescopic link | |
CN110242062B (en) | Floor unwrapping wire hole protection device | |
CN203271739U (en) | Support for electric coal drill | |
CN204108966U (en) | Boring device of top plate | |
CN204089044U (en) | Portable overhead conductor shift unit | |
CN204060569U (en) | A kind of Novel sliding clamper | |
CN205309012U (en) | A stock shaping device for tunneling in face | |
CN210738116U (en) | Floor pay-off hole protection device | |
CN211317793U (en) | Geotechnical sampling device for geotechnical engineering | |
CN204172905U (en) | Multistage lifting formula mining cable car | |
CN203067932U (en) | Bridge cable pylon | |
CN203967707U (en) | A kind of heavy cable actinobacillus device | |
CN205610092U (en) | Novel electric power based on rapid disassembly structure overhauls with dragging bottleholder | |
CN206032166U (en) | Hollow brick piling bin | |
CN203872697U (en) | Kiwi fruit cultivation frame beneficial to kiwi cultivation management | |
CN206419566U (en) | A kind of adjustable natural gas line supporting construction | |
CN204080785U (en) | Adjustable multi-head band drain board-plugging device | |
CN103132773A (en) | Drill bit used for geological tent | |
CN203891288U (en) | Supporting structure for roof of sunshine house | |
CN204715857U (en) | The instrument of masthead is increased in a kind of installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140910 Termination date: 20150430 |
|
EXPY | Termination of patent right or utility model |