CN103975824B - High megaphanerophyte steady in a kind of afforestation project - Google Patents

High megaphanerophyte steady in a kind of afforestation project Download PDF

Info

Publication number
CN103975824B
CN103975824B CN201410179576.9A CN201410179576A CN103975824B CN 103975824 B CN103975824 B CN 103975824B CN 201410179576 A CN201410179576 A CN 201410179576A CN 103975824 B CN103975824 B CN 103975824B
Authority
CN
China
Prior art keywords
cannelure
slide block
connecting rod
clip
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410179576.9A
Other languages
Chinese (zh)
Other versions
CN103975824A (en
Inventor
胡磊
孙成城
孙小新
郭晓军
李丹媚
谢辉
王喆
王泰山
谢冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Institute of Science and Technology
Original Assignee
Luoyang Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Institute of Science and Technology filed Critical Luoyang Institute of Science and Technology
Priority to CN201410179576.9A priority Critical patent/CN103975824B/en
Publication of CN103975824A publication Critical patent/CN103975824A/en
Application granted granted Critical
Publication of CN103975824B publication Critical patent/CN103975824B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to high megaphanerophyte steady in a kind of afforestation project.Comprise earth anchor, the connecting rod hinged with earth anchor and bottom are provided with the clip of cannelure, described clip forms by two measure-alike semicircle clamps are hinged, the slide block hinged with connecting rod is provided with in the cannelure of clip, slide block matches with the slide rail that cannelure sidewall is arranged and realizes slide block and slide in cannelure, also Compress Spring is provided with in described slide block, the gear plug matched with fixing hole on cannelure cell wall is connected with at the two ends of Compress Spring, drive in described slide block moving process by connecting rod, Compress Spring is made to enter in the fixing hole on cannelure cell wall by the gear of elastic force drive end, realize the clamping of slide block and cannelure, gear plug in fixing hole is pushed in cannelure and realizes the continuation of slide block in cannelure and move.The present invention is easy for installation, quick, can repeatedly use, and reduces regular maintenance expense.

Description

一种绿化工程中高大乔木用扶架A support frame for tall trees in greening projects

技术领域 technical field

本发明涉及一种绿化工程中高大乔木用扶架。 The invention relates to a support frame for tall trees in greening engineering.

背景技术 Background technique

目前在市政工程建设或是在房地产的开发等过程中绿化工程的地位越来越重,以至于绿化工程成了上述工程建设中的“亮点”,为了使“亮点”更“亮”,以突出绿化效果,增加“卖点”,在很多绿化工程中,出现了大批量种植高大乔木的情况,甚至种植非本地原生态树种的高大乔木。由于新植高大乔木体形高大,种植后在风力等的影响下,极易倾斜、歪倒。因此,新植高大乔木的成活率受到了很大的影响。新植高大乔木成活率不高,就会出现影响景观、增加成本的情况。为了增加新植高大乔木的成活率,在种植工过程中,采取的其中一种最有效的办法就是在定植的乔木树干上安装木制或竹制等的锥形扶架。 At present, the status of greening projects is becoming more and more important in the process of municipal engineering construction or real estate development, so that greening projects have become the "bright spots" in the above-mentioned project construction. In order to make the "bright spots" more "bright", to highlight The greening effect increases the "selling point". In many greening projects, tall trees are planted in large quantities, and even tall trees that are not native ecological tree species are planted. Since the newly planted tall trees are tall and tall, they are easily tilted and toppled under the influence of wind force after planting. Therefore, the survival rate of newly planted tall trees has been greatly affected. The survival rate of newly planted tall trees is not high, which will affect the landscape and increase the cost. In order to increase the survival rate of newly planted tall trees, in the planting process, one of the most effective ways to take is to install wooden or bamboo and other tapered support frames on the tree trunks of the planted trees.

这种扶架的施工工艺是:1、选取3根、4根或更多根的一定直径、一定长度的木棍、木条或竹竿;2、以新植高大乔木的树干为中心,距树干合理的距离(木棍、木条或竹竿之间的距离也要合理),将上述材料的粗端固定在地面或地面下一定深度;3、将上述材料细端全部推至树干距地面合理高度的一个横断面,有一定的交叉;4、将上述材料的细端与以与树干交叉的横断面为中心,连同树干一起用铁丝或是其它材料捆绑在一起。这样,扶架起一个稳定新植高大乔木,不至使新植高大乔木在风力等的影响下,出现倾斜、歪倒现象,以增加其成活率。 The construction technology of this supporting frame is: 1, select 3, 4 or more certain diameters, certain length wooden sticks, wooden strips or bamboo poles; Reasonable distance (the distance between wooden sticks, wooden strips or bamboo poles should also be reasonable), fix the thick ends of the above materials on the ground or a certain depth under the ground; 3. Push all the thin ends of the above materials to a reasonable height from the trunk to the ground 4, the thin end of the above-mentioned material is centered on the cross section crossing with the trunk, and is bound together with iron wire or other materials together with the trunk. In this way, a stable newly planted tall arbor is erected, so that the newly planted tall arbor will not be tilted or tilted under the influence of wind power, etc., so as to increase its survival rate.

运用上述材料及工艺制作的乔木扶架在现实工程中使用,存在以下弊端:1、费工、费时,施工速度慢;2、材料不耐老化,在风、雨、日光等自然作用下,强度会明显降低,另外,材料本身也存在疤节、劈裂等情况。因此,会导致扶架强度低,寿命短,以至于没到使用的要求时间就会遭损坏;3、制作工艺简陋,固定不牢,易遭破坏;4、地面不平时,搭建困难。 The arbor supports made of the above materials and techniques are used in actual projects, and have the following disadvantages: 1. It is labor-intensive, time-consuming, and the construction speed is slow; 2. The materials are not resistant to aging. It will be significantly reduced. In addition, the material itself also has scars and splits. Therefore, the strength of the supporting frame is low and the life is short, so that it will be damaged before the required time for use; 3. The manufacturing process is simple, the fixation is not firm, and it is easy to be damaged; 4. The ground is uneven and difficult to build.

发明内容 Contents of the invention

本发明的目的是克服现有技术中的不足,提供一种绿化工程中高大乔木用扶架,该扶架制作简单,易于搭建,使用方便,大大提高了工人的工作效率。 The purpose of the present invention is to overcome the deficiencies in the prior art and provide a support frame for tall trees in greening projects. The support frame is simple to manufacture, easy to build, easy to use, and greatly improves the work efficiency of workers.

本发明为解决上述问题所采取的技术方案是:一种绿化工程中高大乔木用扶架,包括地锚、与地锚铰接的连接杆和底部设有环形槽的卡箍,所述卡箍由两个尺寸相同的半圆形卡板铰接而成,卡箍的环形槽内设有与连接杆铰接的滑块,滑块与环形槽侧壁上设置的滑轨相配合实现滑块在环形槽内滑动,所述滑块内还设有压缩弹簧,在压缩弹簧的两端连接有与环形槽槽壁上固定孔相配合的挡塞,通过连接杆带动所述滑块移动过程中,使压缩弹簧通过弹力驱动端部的挡塞进入环形槽槽壁上的固定孔内,实现滑块与环形槽的卡紧,将固定孔内的挡塞推入环形槽内实现滑块在环形槽内的继续移动。 The technical scheme adopted by the present invention to solve the above problems is: a support frame for tall trees in greening projects, including ground anchors, connecting rods hinged with the ground anchors, and clamps with annular grooves at the bottom. Two semi-circular clamps of the same size are hinged. The annular groove of the clamp is provided with a slider hinged with the connecting rod. Sliding inside, the slider is also provided with a compression spring, the two ends of the compression spring are connected with a stopper that matches the fixing hole on the wall of the annular groove, and the connecting rod drives the slider to move, so that the compression The spring drives the stopper at the end into the fixing hole on the wall of the annular groove through the elastic force to realize the clamping of the slider and the annular groove, and pushes the stopper in the fixing hole into the annular groove to realize the sliding block in the annular groove. keep moving.

所述卡箍圆周上标识有角度刻度,以测定连接杆之间的距离。 An angle scale is marked on the circumference of the clamp to measure the distance between the connecting rods.

所述卡箍内设有气垫,通过向气垫内充气,实现树木和卡箍之间夹紧。 An air cushion is arranged inside the clamp, and the tree and the clamp are clamped by inflating the air cushion.

有益效果Beneficial effect

本发明通过设置带有环形槽的卡箍,将与连接杆铰接的滑块放置在环形槽内,使得本发明可以根据需要调整连接杆之间的距离,大大方便了人们在地面不好时快速建立扶架。本发明在卡箍内设有气垫,通过向气垫内充气,实现树木和卡箍之间夹紧,使本发明可用于粗细不同的树木,且本发明安装方便、快捷,能够多次重复使用,降低了日常维护费用。 In the present invention, a clamp with an annular groove is provided, and the slider hinged with the connecting rod is placed in the annular groove, so that the present invention can adjust the distance between the connecting rods as required, which greatly facilitates people to quickly Build the scaffolding. The present invention is equipped with an air cushion in the clamp, and by inflating the air cushion, the tree and the clamp are clamped, so that the present invention can be used for trees with different thicknesses, and the present invention is easy and quick to install, and can be used repeatedly. Reduced daily maintenance costs.

附图说明 Description of drawings

图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;

图2为本发明中卡箍的仰视结构示意图; Fig. 2 is the bottom view structure schematic diagram of hoop in the present invention;

图3为本发明中滑块与环形槽卡紧时的结构示意图。 Fig. 3 is a schematic diagram of the structure when the slider and the annular groove are clamped in the present invention.

图中标记:1、地锚,2、连接杆,3、卡箍,4、环形槽,5、滑块,6、滑轨。 Marks in the figure: 1. Ground anchor, 2. Connecting rod, 3. Clamp, 4. Annular groove, 5. Slide block, 6. Slide rail.

具体实施方式 detailed description

下面结合附图和具体实施例对本发明进行详细说明,如图所示:一种绿化工程中高大乔木用扶架,包括地锚1、与地锚1铰接的连接杆2和底部设有环形槽4的卡箍3,所述卡箍3由两个尺寸相同的半圆形卡板铰接而成,卡箍3的环形槽4内设有与连接杆2铰接的滑块5,滑块5与环形槽4侧壁上设置的滑轨6相配合实现滑块5在环形槽4内滑动,所述滑块5内还设有压缩弹簧,在压缩弹簧的两端连接有与环形槽4槽壁上固定孔相配合的挡塞,通过连接杆2带动所述滑块5移动过程中,使压缩弹簧通过弹力驱动端部的挡塞进入环形槽4槽壁上的固定孔内,实现滑块5与环形槽4的卡紧,将固定孔内挡塞推入环形槽4内即实现滑块5在环形槽4内的继续移动。 The present invention is described in detail below in conjunction with accompanying drawing and specific embodiment, as shown in the figure: a kind of support frame for tall tree in greening project, comprises ground anchor 1, the connecting rod 2 that is hinged with ground anchor 1 and the bottom is provided with annular groove 4 clamp 3, the clamp 3 is hinged by two semicircular clamps of the same size, the annular groove 4 of the clamp 3 is provided with a slider 5 hinged with the connecting rod 2, the slider 5 and The slide rail 6 provided on the side wall of the annular groove 4 cooperates to realize that the slide block 5 slides in the annular groove 4, and a compression spring is also provided in the slide block 5, and the two ends of the compression spring are connected with the groove wall of the annular groove 4. The stopper matched with the upper fixing hole drives the slider 5 through the connecting rod 2 during the moving process, so that the compression spring drives the stopper at the end through the elastic force into the fixing hole on the wall of the annular groove 4 to realize the slider 5 Clamping with the annular groove 4, the stopper in the fixing hole is pushed into the annular groove 4 to realize the continuous movement of the slider 5 in the annular groove 4.

所述卡箍3圆周上标识有角度刻度,以测定连接杆2之间的距离。 Angle scales are marked on the circumference of the clamp 3 to measure the distance between the connecting rods 2 .

所述卡箍3内设有气垫,通过向气垫内充气,实现树木和卡箍3之间夹紧。 The clamp 3 is provided with an air cushion, and the tree and the clamp 3 are clamped by inflating the air cushion.

本发明的使用方法是:首先将卡箍3卡在树木上,由于卡箍3内径大于树木直径,使得卡箍3在树木上可旋转和上下移动,然后将地锚1固定在地面上,通过推动连接杆2,实现滑块5在环形槽4内移动,在滑块5移动过程中,压缩弹簧通过弹力驱动端部的挡塞进入环形槽4槽壁上的固定孔内,实现滑块5与环形槽4的卡紧,之后向卡箍3内的气垫充气,实现树木和卡箍3之间夹紧即可。 The using method of the present invention is: first clamp the hoop 3 on the tree, because the inner diameter of the hoop 3 is greater than the diameter of the tree, the hoop 3 can rotate and move up and down on the tree, and then the ground anchor 1 is fixed on the ground, through Push the connecting rod 2 to realize the movement of the slider 5 in the annular groove 4. During the movement of the slider 5, the compression spring drives the stopper at the end through the elastic force to enter the fixing hole on the wall of the annular groove 4 to realize the movement of the slider 5. Clamping with the annular groove 4, and then inflating the air cushion in the clamp 3 to realize the clamping between the tree and the clamp 3.

Claims (1)

1. high megaphanerophyte steady in an afforestation project, it is characterized in that: comprise the clip (3) that earth anchor (1), the connecting rod (2) hinged with earth anchor (1) and bottom are provided with cannelure (4), described clip (3) forms by two measure-alike semicircle clamps are hinged, it has circumferentially identified angle index, to measure the distance between connecting rod (2), the slide block (5) hinged with connecting rod (2) is provided with in the cannelure (4) of clip (3), slide block (5) matches with the slide rail (6) that cannelure (4) sidewall is arranged and realizes slide block (5) and slide in cannelure (4), described slide block is also provided with Compress Spring in (5), the gear plug matched with fixing hole on cannelure (4) cell wall is connected with at the two ends of Compress Spring, drive in described slide block (5) moving process by connecting rod (2), Compress Spring enters in the fixing hole on cannelure (4) cell wall by the gear of elastic force drive end, realize the clamping of slide block (5) and cannelure (4), gear plug in fixing hole is pushed in cannelure (4) and realize the continuation of slide block (5) in cannelure (4) and move, described clip is provided with air cushion in (3), by inflating in air cushion, realizes clamping between trees and clip (3).
CN201410179576.9A 2014-04-30 2014-04-30 High megaphanerophyte steady in a kind of afforestation project Expired - Fee Related CN103975824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410179576.9A CN103975824B (en) 2014-04-30 2014-04-30 High megaphanerophyte steady in a kind of afforestation project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410179576.9A CN103975824B (en) 2014-04-30 2014-04-30 High megaphanerophyte steady in a kind of afforestation project

Publications (2)

Publication Number Publication Date
CN103975824A CN103975824A (en) 2014-08-13
CN103975824B true CN103975824B (en) 2016-01-20

Family

ID=51268202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410179576.9A Expired - Fee Related CN103975824B (en) 2014-04-30 2014-04-30 High megaphanerophyte steady in a kind of afforestation project

Country Status (1)

Country Link
CN (1) CN103975824B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105230244A (en) * 2015-10-21 2016-01-13 重庆跃发日用品有限公司 Tightly-sleeving structure of device used for preventing litchis from breaking down
CN108738970A (en) * 2018-05-10 2018-11-06 凤冈县海瑞农业科技发展有限责任公司 A kind of cultural method of blueberry
CN108849223B (en) * 2018-08-28 2021-08-27 江苏宜安建设有限公司 A trees strutting arrangement for afforestation

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29912886U1 (en) * 1999-07-23 1999-10-28 Flegel, Willy E., 64846 Groß-Zimmern Infinitely adjustable support
CN100998303A (en) * 2006-12-30 2007-07-18 刘玉清 Support for protecting tree
CN201987014U (en) * 2011-01-13 2011-09-28 刘弟秋 Push-to-lock slide rail
CN202603303U (en) * 2012-06-14 2012-12-19 刘精卫 Bracket capable of effectively strengthening lighting of trees
CN102960213A (en) * 2012-11-22 2013-03-13 江苏永辉装饰工程有限公司 Tree protection bracket
CN202800735U (en) * 2012-09-21 2013-03-20 广东泰明金属制品有限公司 Drawer damping sliding rail
CN202858386U (en) * 2012-10-17 2013-04-10 广东泰明金属制品有限公司 Double-slider drawer slide rail
CN203015555U (en) * 2012-12-14 2013-06-26 昆明冶金高等专科学校 Multi-functional tree fixing device
CN203814300U (en) * 2014-04-30 2014-09-10 洛阳理工学院 Supporting rack for high and large tree in landscape engineering

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29912886U1 (en) * 1999-07-23 1999-10-28 Flegel, Willy E., 64846 Groß-Zimmern Infinitely adjustable support
CN100998303A (en) * 2006-12-30 2007-07-18 刘玉清 Support for protecting tree
CN201987014U (en) * 2011-01-13 2011-09-28 刘弟秋 Push-to-lock slide rail
CN202603303U (en) * 2012-06-14 2012-12-19 刘精卫 Bracket capable of effectively strengthening lighting of trees
CN202800735U (en) * 2012-09-21 2013-03-20 广东泰明金属制品有限公司 Drawer damping sliding rail
CN202858386U (en) * 2012-10-17 2013-04-10 广东泰明金属制品有限公司 Double-slider drawer slide rail
CN102960213A (en) * 2012-11-22 2013-03-13 江苏永辉装饰工程有限公司 Tree protection bracket
CN203015555U (en) * 2012-12-14 2013-06-26 昆明冶金高等专科学校 Multi-functional tree fixing device
CN203814300U (en) * 2014-04-30 2014-09-10 洛阳理工学院 Supporting rack for high and large tree in landscape engineering

Also Published As

Publication number Publication date
CN103975824A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN206491083U (en) A kind of ornamental trees and shrubs protection device
CN203608641U (en) A tree righting and fixing device
CN103975824B (en) High megaphanerophyte steady in a kind of afforestation project
CN203814300U (en) Supporting rack for high and large tree in landscape engineering
CN103423515A (en) Circular tube clamping sleeve
CN105608990A (en) Tree signage, fixing methods to trees, tools for fixing, tools for drilling
CN110235636A (en) A tree-climbing robot for branching
CN204948915U (en) Plant protection support frame
CN205105856U (en) Tree bracket
CN205309012U (en) A stock shaping device for tunneling in face
CN205940542U (en) Tunnel vault settlement measurement station cabling device exempts from to drill
CN205567300U (en) Integrated fixed support frame capable of improving wind resistance of tree associations
CN204272842U (en) Sapling apparatus for correcting
CN210987404U (en) Anti-lodging support for seedlings for landscaping
CN208836678U (en) A kind of transplanting trees wind resistance lodging-prevention device
CN205408899U (en) Wind -proof construction is cultivated with plant in gardens
CN209845838U (en) Strutting arrangement is transplanted to plant for garden construction
CN205052372U (en) It props to protect tree
CN204495209U (en) One pinches stemming dispenser
CN211241098U (en) Straight frame is held up in seedless litchi planting
CN219577959U (en) Greening construction nursery stock strutting arrangement
CN103100581A (en) Wire unloading method of wire coiling plate of drawing machine
CN203937423U (en) Balloon arched door frame
CN204384379U (en) A kind of pusher of timber
CN104060742A (en) Adjustable roof knee-supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20160430