CN103975824A - High arbor rest for use in landscape engineering - Google Patents
High arbor rest for use in landscape engineering Download PDFInfo
- Publication number
- CN103975824A CN103975824A CN201410179576.9A CN201410179576A CN103975824A CN 103975824 A CN103975824 A CN 103975824A CN 201410179576 A CN201410179576 A CN 201410179576A CN 103975824 A CN103975824 A CN 103975824A
- Authority
- CN
- China
- Prior art keywords
- cannelure
- annular groove
- slide block
- clip
- slide blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention relates to a high arbor rest for use in landscape engineering. The high arbor rest comprises ground anchors, connecting rods and a hoop, wherein the connecting rods are hinged to the ground anchors; an annular groove is formed in the bottom of the hoop; the hoop is formed by hinging two semicircular clamping plates of the same size; slide blocks which are hinged to the connecting rods are arranged in the annular groove of the hoop; the slide blocks are matched with a slide rail arranged on the side wall of the annular groove to realize sliding of the slide blocks in the annular groove; compression springs are further arranged in the slide blocks; the two ends of the compression springs are connected with stopping plugs which are matched with fixing holes in the groove wall of the annular groove. When the connecting rods are used for driving the slide blocks to move, the compression springs drive the stopping plugs at the end parts to enter the fixing holes in the groove wall of the annular groove through elastic force, the slide blocks are clamped with the annular groove, and the stopping plugs in the fixing holes are pushed into the annular groove to realize continuous movement of the slide blocks in the annular groove. The high arbor rest can be arranged conveniently and rapidly, and can be used repeatedly; the daily maintenance cost is lowered.
Description
Technical field
The present invention relates to high megaphanerophyte steady in a kind of afforestation project.
Background technology
In municipal engineering construction or the processes such as exploitation at real estate, the status of afforestation project is more and more heavier at present, to such an extent as to afforestation project has become " bright spot " in above-mentioned engineering construction, in order to make " bright spot " more " bright ", to give prominence to afforestation effect, increase " attraction ", in a lot of afforestation projects, there is the situation of the high megaphanerophyte of plantation in enormous quantities, even plant the high megaphanerophyte of non-local ecosystem seeds.Because the tall and big arbor bodily form of planting is tall and big, after plantation, under the impact of wind-force etc., very easily tilt, skew.Therefore, the survival rate of the high megaphanerophyte of planting has been subject to very large impact.The high megaphanerophyte survival rate of planting is not high, just there will be the situation that affects view, increases cost.In order to increase the survival rate of the high megaphanerophyte of planting, in plantation work process, the wherein the most effective a kind of way of taking is exactly that wooden or bamboo etc. taper steady is installed on the arbor trunk of field planting.
The construction technology of this steady is: 1, choose 3,4 or the certain diameter of more, waddy, batten or the bamboo pole of certain length; 2,, centered by the trunk of the high megaphanerophyte of planting, apart from trunk, reasonably apart from (distance between waddy, batten or bamboo pole is also wanted rationally), the butt end of above-mentioned material is fixed on to ground or subsurface certain depth; 3, above-mentioned material taper end is all pushed into trunk apart from a cross section of ground reasonable altitudes, has certain intersection; 4,, by centered by the taper end of above-mentioned material and cross section to intersect with trunk, together with trunk one, reinstate iron wire or other material bundles.Like this, steady plays a high megaphanerophyte of stable planting, unlikelyly makes the high megaphanerophyte of planting under the impact of wind-force etc., occurs tilting, the phenomenon that skews, to increase its survival rate.
The arbor steady that uses above-mentioned material and technique to make is used in real engineering, has following drawback: 1, take a lot of work, time-consuming, speed of application is slow; 2, material is not ageing-resistant, and under the operation of nature such as wind, rain, daylight, intensity can obviously reduce, and in addition, material itself also exists the situations such as scar joint, splitting.Therefore, can cause steady intensity low, the life-span is short, to such an extent as to the seeking time of wanting that is less than use will be damaged; 3, manufacture craft is simple and crude, fixing not firm, easily goes to pot; 4, difficulty not at ordinary times, is built in ground.
Summary of the invention
The object of the invention is to overcome deficiency of the prior art, high megaphanerophyte steady in a kind of afforestation project is provided, this steady is made simple, is easy to build, easy to use, has greatly improved workman's operating efficiency.
The present invention addresses the above problem taked technical scheme to be: high megaphanerophyte steady in a kind of afforestation project, comprise earth anchor, the clip that is provided with cannelure with the hinged connecting rod of earth anchor and bottom, described clip is by two measure-alike hinged forming of semicircle clamp, in the cannelure of clip, be provided with the slide block hinged with connecting rod, slide block matches with the slide rail arranging on cannelure sidewall and realizes slide block and slide in cannelure, in described slide block, be also provided with Compress Spring, at the two ends of Compress Spring, be connected with the gear plug matching with fixing hole on cannelure cell wall, by connecting rod, drive in described slide block moving process, Compress Spring is entered in the fixing hole on cannelure cell wall by the gear of elastic force drive end, realize the clamping of slide block and cannelure, gear plug in fixing hole is pushed and in cannelure, realizes the continuation of slide block in cannelure and move.
On described clip circumference, sign has angle index, to measure the distance between connecting rod.
In described clip, be provided with air cushion, by inflating in air cushion, realize between trees and clip and clamping.
beneficial effect
The present invention is by being provided with the clip of cannelure, by being placed in cannelure with the hinged slide block of connecting rod, makes the present invention can adjust as required the distance between connecting rod, greatly facilitates people's Rapid Establishment steady when bad on ground.The present invention is provided with air cushion in clip, by inflating in air cushion, realizes between trees and clip and clamping, and makes the present invention can be used for the trees that thickness is different, and the present invention is easy for installation, quick, can be repeatedly used, and has reduced regular maintenance expense.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 be in the present invention clip look up structural representation;
Fig. 3 is structural representation during slide block and cannelure clamping in the present invention.
Mark in figure: 1, earth anchor, 2, connecting rod, 3, clip, 4, cannelure, 5, slide block, 6, slide rail.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail, as shown in the figure: high megaphanerophyte steady in a kind of afforestation project, comprise earth anchor 1, the clip 3 that is provided with cannelure 4 with the hinged connecting rod 2 of earth anchor 1 and bottom, described clip 3 is by two measure-alike hinged forming of semicircle clamp, in the cannelure 4 of clip 3, be provided with the slide block 5 hinged with connecting rod 2, slide block 5 matches and realizes slide block 5 in the interior slip of cannelure 4 with the slide rail 6 arranging on cannelure 4 sidewalls, in described slide block 5, be also provided with Compress Spring, at the two ends of Compress Spring, be connected with the gear plug matching with fixing hole on cannelure 4 cell walls, by connecting rod 2, drive in described slide block 5 moving process, Compress Spring is entered in the fixing hole on cannelure 4 cell walls by the gear of elastic force drive end, realize the clamping of slide block 5 and cannelure 4, gear plug in fixing hole is pushed and in cannelure 4, realizes the continuation of slide block 5 in cannelure 4 and move.
On described clip 3 circumference, sign has angle index, to measure the distance between connecting rod 2.
In described clip 3, be provided with air cushion, by inflating in air cushion, realize between trees and clip 3 and clamping.
Using method of the present invention is: first clip 3 is stuck on trees, because clip 3 internal diameters are greater than tree diameters, make clip 3 rotatable and move up and down on trees, then earth anchor 1 is fixed on the ground, by promoting connecting rod 2, realize slide block 5 in the interior movement of cannelure 4, in slide block 5 moving process, Compress Spring enters in the fixing hole on cannelure 4 cell walls by the gear of elastic force drive end, realize the clamping of slide block 5 and cannelure 4, to the air cushion inflation in clip 3, realize between trees and clip 3 and clamping afterwards.
Claims (3)
1. high megaphanerophyte steady in an afforestation project, it is characterized in that: comprise earth anchor (1), the clip (3) that is provided with cannelure (4) with the hinged connecting rod (2) of earth anchor (1) and bottom, described clip (3) is by two measure-alike hinged forming of semicircle clamp, in the cannelure (4) of clip (3), be provided with the slide block (5) hinged with connecting rod (2), slide block (5) matches with the slide rail (6) arranging on cannelure (4) sidewall and realizes slide block (5) and slide in cannelure (4), described slide block is also provided with Compress Spring in (5), at the two ends of Compress Spring, be connected with the gear plug matching with fixing hole on cannelure (4) cell wall, by connecting rod (2), drive in described slide block (5) moving process, Compress Spring enters in the fixing hole on cannelure (4) cell wall by the gear of elastic force drive end, realize the clamping of slide block (5) and cannelure (4), gear plug in fixing hole is pushed and in cannelure (4), realizes the continuation of slide block (5) in cannelure (4) and move.
2. high megaphanerophyte steady in a kind of afforestation project according to claim 1, is characterized in that: on described clip (3) circumference, sign has angle index, to measure the distance between connecting rod (2).
3. high megaphanerophyte steady in a kind of afforestation project according to claim 1, is characterized in that: described clip is provided with air cushion in (3), by inflating in air cushion, realizes between trees and clip (3) and clamping.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410179576.9A CN103975824B (en) | 2014-04-30 | 2014-04-30 | High megaphanerophyte steady in a kind of afforestation project |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410179576.9A CN103975824B (en) | 2014-04-30 | 2014-04-30 | High megaphanerophyte steady in a kind of afforestation project |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103975824A true CN103975824A (en) | 2014-08-13 |
CN103975824B CN103975824B (en) | 2016-01-20 |
Family
ID=51268202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410179576.9A Expired - Fee Related CN103975824B (en) | 2014-04-30 | 2014-04-30 | High megaphanerophyte steady in a kind of afforestation project |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103975824B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105230244A (en) * | 2015-10-21 | 2016-01-13 | 重庆跃发日用品有限公司 | Tightly-sleeving structure of device used for preventing litchis from breaking down |
CN108738970A (en) * | 2018-05-10 | 2018-11-06 | 凤冈县海瑞农业科技发展有限责任公司 | A kind of cultural method of blueberry |
CN108849223B (en) * | 2018-08-28 | 2021-08-27 | 江苏宜安建设有限公司 | A trees strutting arrangement for afforestation |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29912886U1 (en) * | 1999-07-23 | 1999-10-28 | Flegel Willy E | Infinitely adjustable support |
CN100998303A (en) * | 2006-12-30 | 2007-07-18 | 刘玉清 | Support for protecting tree |
CN201987014U (en) * | 2011-01-13 | 2011-09-28 | 刘弟秋 | Pressing type lock spring slide track |
CN202603303U (en) * | 2012-06-14 | 2012-12-19 | 刘精卫 | Bracket capable of effectively strengthening lighting of trees |
CN102960213A (en) * | 2012-11-22 | 2013-03-13 | 江苏永辉装饰工程有限公司 | Tree protection bracket |
CN202800735U (en) * | 2012-09-21 | 2013-03-20 | 广东泰明金属制品有限公司 | Drawer damping sliding rail |
CN202858386U (en) * | 2012-10-17 | 2013-04-10 | 广东泰明金属制品有限公司 | Double-slider drawer slide rail |
CN203015555U (en) * | 2012-12-14 | 2013-06-26 | 昆明冶金高等专科学校 | Multi-functional tree fixing device |
CN203814300U (en) * | 2014-04-30 | 2014-09-10 | 洛阳理工学院 | Supporting rack for high and large tree in landscape engineering |
-
2014
- 2014-04-30 CN CN201410179576.9A patent/CN103975824B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29912886U1 (en) * | 1999-07-23 | 1999-10-28 | Flegel Willy E | Infinitely adjustable support |
CN100998303A (en) * | 2006-12-30 | 2007-07-18 | 刘玉清 | Support for protecting tree |
CN201987014U (en) * | 2011-01-13 | 2011-09-28 | 刘弟秋 | Pressing type lock spring slide track |
CN202603303U (en) * | 2012-06-14 | 2012-12-19 | 刘精卫 | Bracket capable of effectively strengthening lighting of trees |
CN202800735U (en) * | 2012-09-21 | 2013-03-20 | 广东泰明金属制品有限公司 | Drawer damping sliding rail |
CN202858386U (en) * | 2012-10-17 | 2013-04-10 | 广东泰明金属制品有限公司 | Double-slider drawer slide rail |
CN102960213A (en) * | 2012-11-22 | 2013-03-13 | 江苏永辉装饰工程有限公司 | Tree protection bracket |
CN203015555U (en) * | 2012-12-14 | 2013-06-26 | 昆明冶金高等专科学校 | Multi-functional tree fixing device |
CN203814300U (en) * | 2014-04-30 | 2014-09-10 | 洛阳理工学院 | Supporting rack for high and large tree in landscape engineering |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105230244A (en) * | 2015-10-21 | 2016-01-13 | 重庆跃发日用品有限公司 | Tightly-sleeving structure of device used for preventing litchis from breaking down |
CN108738970A (en) * | 2018-05-10 | 2018-11-06 | 凤冈县海瑞农业科技发展有限责任公司 | A kind of cultural method of blueberry |
CN108849223B (en) * | 2018-08-28 | 2021-08-27 | 江苏宜安建设有限公司 | A trees strutting arrangement for afforestation |
Also Published As
Publication number | Publication date |
---|---|
CN103975824B (en) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103975824A (en) | High arbor rest for use in landscape engineering | |
CN206981809U (en) | A kind of construction servicing unit | |
CN105766543A (en) | Windproof anti-lodging fixing and supporting device for tree | |
CN203814300U (en) | Supporting rack for high and large tree in landscape engineering | |
MY185057A (en) | A tire assembly and a method of building a support structure in a marine environment using tires | |
CN205527616U (en) | Multistage automatic telescopic link | |
CN204405406U (en) | Containing the hand-stripping instrument to further groove | |
CN110242062B (en) | Floor unwrapping wire hole protection device | |
CN204108966U (en) | Boring device of top plate | |
CN203199158U (en) | Inserting-connection-type floating platform device | |
CN203538010U (en) | Invisible supporting system for trees | |
CN204982881U (en) | Adaptability earth anchor | |
CN201935825U (en) | Special soil sampler used for static triaxial compressing test of soil | |
CN204825851U (en) | Be used for prosthetic semi -automatic rammer in native ruins to mend hammer | |
CN205309012U (en) | A stock shaping device for tunneling in face | |
CN103711126A (en) | Righting structure for piling | |
CN203926599U (en) | Screw pull rod | |
CN205610092U (en) | Novel electric power based on rapid disassembly structure overhauls with dragging bottleholder | |
CN204418179U (en) | A kind of practical hydraulic pressure plays a machine | |
CN203967707U (en) | A kind of heavy cable actinobacillus device | |
CN204715857U (en) | The instrument of masthead is increased in a kind of installation | |
CN204361459U (en) | Earth electrode erecting device | |
CN203872697U (en) | Kiwi fruit cultivation frame beneficial to kiwi cultivation management | |
CN203993727U (en) | A kind of cover plate drawbench | |
CN203685074U (en) | Automatic locking device used when stand columns are placed in racking platform finger-shaped beams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 Termination date: 20160430 |