CN203808019U - Layout structure of high-water head multi-functional dam on deep soft foundation - Google Patents

Layout structure of high-water head multi-functional dam on deep soft foundation Download PDF

Info

Publication number
CN203808019U
CN203808019U CN201420223094.4U CN201420223094U CN203808019U CN 203808019 U CN203808019 U CN 203808019U CN 201420223094 U CN201420223094 U CN 201420223094U CN 203808019 U CN203808019 U CN 203808019U
Authority
CN
China
Prior art keywords
dam
downstream
open type
gravity
lock chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420223094.4U
Other languages
Chinese (zh)
Inventor
董昊雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420223094.4U priority Critical patent/CN203808019U/en
Application granted granted Critical
Publication of CN203808019U publication Critical patent/CN203808019U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a layout structure of a high-water head multi-functional dam on a deep soft foundation. The layout structure comprises a dam body. The dam body is of a lock chamber structure. An open type overflow dam and a gravity dam are arranged in a vertical flow on a lock chamber base plate. Downstream flow length of a lock chamber base plate on an upstream side of the open type overflow dam and the gravity dam is larger than the overall downstream flow length of the integral lock chamber base plate by 2/5-1/2. A downstream section of an open type overflow dam weir surface is connected with an energy dissipation facility through an ogee section. A draining and desilting bottom hole and a power generation aqueduct are arranged from the upstream side to the downstream side in the gravity dam. A downstream section of the draining and desilting bottom hole is connected with the energy dissipation facility. A downstream section of the power generation aqueduct is communicated with a water turbine behind the dam. The layout structure has the advantages that discharging capacity of the open type overflow dam is fully utilized; by the draining and desilting bottom hole, requirements of discharging a reservoir, desilting and generating power with clear water are met; thus safety of the dam body that is of the lock chamber structure and comprehensive development tacks are guaranteed.

Description

The arrangement on the multi-functional dam of deep soft foundation high water head
Technical field
The utility model relates to the multi-functional dam of deep soft foundation high water head, especially relates to the arrangement on the multi-functional dam of deep soft foundation high water head.
Background technology
On deep soft foundation, build high water head hydraulic structure, the subject matter of existence is that Lack of support and sedimentation and deformation are excessive, thereby affects engineering safety.Therefore, on deep soft foundation, build a dam while highly exceeding 30m and conventionally to adopt earth and rockfill dam dam type, and at bank correct position, flood spillway is set separately and ensures enough flood carrying capacities.In the case of at present suitable landform of building flood spillway and geological conditions reduce day by day, in the urgent need to meeting under deep soft foundation high water head condition, the comprehensive dam type body that the several functions such as dash, sluicing, generating, flood control can be integrated in one.
Summary of the invention
The utility model object is to provide the arrangement on the multi-functional dam of a kind of deep soft foundation high water head.
For achieving the above object, the utility model is taked following technical proposals:
The arrangement on the multi-functional dam of deep soft foundation high water head described in the utility model, comprises the dam body being arranged on riverbed, described dam body both sides respectively by quaywall be arranged in described riverbed two earth and rockfill dam on the bank and be connected; Described dam body is lock chamber structure, and described lock floor basis is drill-pouring pilework, on lock floor, is furnished with open type overfall dam and gravity dam along Transverse to the flow direction; The lock floor that is positioned at described open type overfall dam, gravity dam upstream side flows the 2/5-1/2 that length is greater than lock floor and flows downstream entire length downstream; On the lock floor of described open type overfall dam, both sides, gravity dam upstream, be furnished with respectively abutment pier along Parallel to the flow direction; Described open type weir crest face downstream is connected with energy-dissipating installation by anti-segmental arc; In described gravity dam body, be provided with sluicing bottom hole for sand flushing and generating aqueduct from upstream side to downstream; Described sluicing bottom hole for sand flushing downstream is connected with energy-dissipating installation, and described generating aqueduct downstream is communicated with the hydraulic turbine behind dam.
Be positioned at described dam body upstream and be furnished with respectively aileron and bedding.
The utility model advantage is mainly reflected in following several respects:
1, the dam body both sides of described lock chamber structure are connected with the earth and rockfill dam that is arranged in two sides, riverbed by quaywall respectively, while not only ensureing flood discharge, current are smooth and easy, open excavation amount is few, and take full advantage of the super ability of letting out of open type overfall dam, described sluicing bottom hole for sand flushing can meet reservoir emptying, sand discharge and clear water generating requirement simultaneously, thereby has ensured the safety of lock chamber structure dam body and the realization of comprehensive development task.
2, described dam body adopts sluice structure build, by being arranged in the gravity dam dash on described lock floor, make full use of the water that is positioned at open type overfall dam, gravity dam upstream side lock floor top and heavily meet integral dam stability requirement, reach and significantly save concrete work amount object.
3, by adjusting described gravity dam fundamental triangle position of centre of gravity, reach and meet dam body runtime bearing capacity of foundation soil and differential settlement requirement; Meanwhile, the abutment pier being arranged on open type overfall dam, both sides, gravity dam upstream lock floor along Parallel to the flow direction can be introduced lock chamber by water flow stationary, and sluicing and sand discharge are interference-free, have guaranteed sand discharge effect.
4, described lock floor arranges ater-casting in the construction period, bears construction period dam body vertical load by being arranged in the bored pile on described lock floor basis, reaches and meets dam construction phase bearing capacity of foundation soil and differential settlement requirement; Significantly save Grouting Pile Engineering of Drilling Hole amount simultaneously.
Brief description of the drawings
Fig. 1 is plane arrangement structure schematic diagram of the present utility model.
Fig. 2 is upstream of the present utility model facade structures schematic diagram.
Fig. 3 is that the A-A of Fig. 1 is to cross-sectional view.
Fig. 4 is that the B-B of Fig. 1 is to cross-sectional view.
Fig. 5 is that the C-C of Fig. 1 is to cross-sectional view.
Detailed description of the invention
As Figure 1-5, the arrangement on the multi-functional dam of deep soft foundation high water head described in the utility model, comprises the dam body being arranged on riverbed, described dam body both sides respectively by quaywall 1 be arranged in described riverbed two earth and rockfill dam 2 on the bank and be connected; Described dam body upstream is furnished with respectively aileron 3 and bedding 4; Described dam body is lock chamber structure, and described lock floor 5 bases are bored pile 6 structures, on lock floor 5, are furnished with open type overfall dam 7 and gravity dam 8 along Transverse to the flow direction; The lock floor 5 that is positioned at described open type overfall dam 7, gravity dam 8 upstream sides flows 30 meters of the 2/5(head height that length is greater than lock floor 5 and flows downstream entire length downstream) 40 meters of-1/2(head height); On the lock floor 5 of described open type overfall dam 7, gravity dam 8 both sides, upstream, be furnished with respectively abutment pier 9 along Parallel to the flow direction; Described open type overfall dam 7 weir face 10 downstreams are connected with energy-dissipating installation 12 by anti-segmental arc 11; In the dam body of described gravity dam 8, be provided with sluicing bottom hole for sand flushing 13 and generating aqueduct 14 from upstream side to downstream; Described sluicing bottom hole for sand flushing 13 downstreams are connected with energy-dissipating installation 12, and described generating aqueduct 14 downstreams are communicated with the hydraulic turbine behind dam.

Claims (2)

1. the arrangement on the multi-functional dam of deep soft foundation high water head, comprises the dam body being arranged on riverbed, described dam body both sides respectively by quaywall be arranged in described riverbed two earth and rockfill dam on the bank and be connected; It is characterized in that: described dam body is lock chamber structure, described lock floor basis is drill-pouring pilework, on lock floor, is furnished with open type overfall dam and gravity dam along Transverse to the flow direction; The lock floor that is positioned at described open type overfall dam, gravity dam upstream side flows the 2/5-1/2 that length is greater than lock floor and flows downstream entire length downstream; On the lock floor of described open type overfall dam, both sides, gravity dam upstream, be furnished with respectively abutment pier along Parallel to the flow direction; Described open type weir crest face downstream is connected with energy-dissipating installation by anti-segmental arc; In described gravity dam body, be provided with sluicing bottom hole for sand flushing and generating aqueduct from upstream side to downstream; Described sluicing bottom hole for sand flushing downstream is connected with energy-dissipating installation, and described generating aqueduct downstream is communicated with the hydraulic turbine behind dam.
2. the arrangement on the multi-functional dam of deep soft foundation high water head according to claim 1, is characterized in that: be positioned at described dam body upstream and be furnished with respectively aileron and bedding.
CN201420223094.4U 2014-05-05 2014-05-05 Layout structure of high-water head multi-functional dam on deep soft foundation Withdrawn - After Issue CN203808019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420223094.4U CN203808019U (en) 2014-05-05 2014-05-05 Layout structure of high-water head multi-functional dam on deep soft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420223094.4U CN203808019U (en) 2014-05-05 2014-05-05 Layout structure of high-water head multi-functional dam on deep soft foundation

Publications (1)

Publication Number Publication Date
CN203808019U true CN203808019U (en) 2014-09-03

Family

ID=51446799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420223094.4U Withdrawn - After Issue CN203808019U (en) 2014-05-05 2014-05-05 Layout structure of high-water head multi-functional dam on deep soft foundation

Country Status (1)

Country Link
CN (1) CN203808019U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953009A (en) * 2014-05-05 2014-07-30 黄河勘测规划设计有限公司 Arrangement structure of multi-functional dam with deep soft foundation and high water head
CN104831689A (en) * 2015-05-28 2015-08-12 杨建能 Siltation-preventing water intake facility achieving automatic flood prevention and pollution discharge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953009A (en) * 2014-05-05 2014-07-30 黄河勘测规划设计有限公司 Arrangement structure of multi-functional dam with deep soft foundation and high water head
CN103953009B (en) * 2014-05-05 2016-03-09 黄河勘测规划设计有限公司 The arrangement on the multi-functional dam of deep soft foundation high water head
CN104831689A (en) * 2015-05-28 2015-08-12 杨建能 Siltation-preventing water intake facility achieving automatic flood prevention and pollution discharge

Similar Documents

Publication Publication Date Title
CN103510493B (en) Low overflow dam cave depot type hydropower station
CN201485823U (en) Anti-seepage structure of hydraulic asphalt concrete panel
CN202323895U (en) Tail water channel structure for stepped hydro-junction
CN104695380A (en) Revetment structure composed of plastic steel plate piles and concrete
CN203429606U (en) Sediment retaining bank reconstructed from temporary cofferdam
CN104452666A (en) Lifting submerged dam
CN203808019U (en) Layout structure of high-water head multi-functional dam on deep soft foundation
CN102912762B (en) Dam with pile groups and permeable frame and construction method of dam
CN104452682A (en) Automatic control type steel faceplate dam
CN203530926U (en) Slope protection structure for water conservancy project
CN103526732A (en) Dam drainage structure
CN103953009B (en) The arrangement on the multi-functional dam of deep soft foundation high water head
CN203795388U (en) Mixed earth dam and gravity dam arrangement structure
CN105421305B (en) A kind of peg board plane is interlocked its supplementary devices for combining with facade
CN110130270B (en) Multifunctional breakwater and dredging balance self-adjusting method suitable for high-sand-content sea area
CN202214710U (en) Overflowing-drainage integrated brake weir
KR101171014B1 (en) Debris barrier having small hydropower generating apparatus
CN101705668B (en) Damming water conservancy project construction structure constructed in flowing water and construction method thereof
CN204125935U (en) A kind of micropore castinplace pile being applicable to solar photovoltaic bracket basis
CN203270531U (en) Steel trash blocking device of hydropower station reservoir area
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN203559405U (en) Dam sluicing structure
CN205444124U (en) Waterproof dam of cement piece formula
CN101538841B (en) Differential trajectory jet energy dissipater in absorption basin
CN204000796U (en) Power station in river channel's structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140903

Effective date of abandoning: 20160309

C25 Abandonment of patent right or utility model to avoid double patenting