CN203792694U - Gas recovery valve group - Google Patents

Gas recovery valve group Download PDF

Info

Publication number
CN203792694U
CN203792694U CN201320735054.3U CN201320735054U CN203792694U CN 203792694 U CN203792694 U CN 203792694U CN 201320735054 U CN201320735054 U CN 201320735054U CN 203792694 U CN203792694 U CN 203792694U
Authority
CN
China
Prior art keywords
pressure
valve
mouth
recovery
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320735054.3U
Other languages
Chinese (zh)
Inventor
黄栋财
蔡博文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINZHUN (FUJIAN) PRECISION MACHINERY INDUSTRY Co Ltd
Original Assignee
JINZHUN (FUJIAN) PRECISION MACHINERY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINZHUN (FUJIAN) PRECISION MACHINERY INDUSTRY Co Ltd filed Critical JINZHUN (FUJIAN) PRECISION MACHINERY INDUSTRY Co Ltd
Priority to CN201320735054.3U priority Critical patent/CN203792694U/en
Application granted granted Critical
Publication of CN203792694U publication Critical patent/CN203792694U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Multiple-Way Valves (AREA)
  • Invalid Beds And Related Equipment (AREA)

Abstract

The utility model relates to a gas recovery valve group which comprises a recovery exhaust valve, a first pressure valve and a second pressure valve, wherein the recovery exhaust valve, the first pressure valve and the second pressure valve are sequentially and adjacently connected with one another to form a three-opening two-position valve body; the recovery exhaust valve is externally connected with a gas recovery module, the first pressure valve is externally connected with a first pressure gas source, and the second pressure valve is externally connected with a second pressure gas source and a bottle blowing module. The gas recovery valve group can control the communicated sate of the bottle blowing module with the first pressure gas source, the second pressure gas source and the gas recovery module in a switchable manner. Through the design of the three-opening two-position valve body, when the gas recovery valve group carries out first-pressure blowing and second-pressure blowing on the bottle blowing module, gas dead zones can be reduced, and the invalid gas waste can be reduced.

Description

Gas recovery valve group
Technical field
The present invention is relevant for the gas recovery valve group of bottle blowing machine with one, it can provide one of bottle blowing machine bottle blowing module to produce the first pressure air blowing, the second pressure air blowing, gas recovery and exhaust operation, and has the advantage that reduces gas dead band and accelerate gas recovery operation.
Background technology
Commonly use the bottle blowing module of bottle blowing machine, as shown in No. M302467th, TaiWan, China patent announcement, to be connected with one first pressure gas source, one second pressure gas source and a gas recycling module by a gas recovery valve group, to carry out the first pressure air blowing, the second pressure air blowing, gas recovery and exhaust operation.Wherein, this gas recovery valve group is to include one first pressure valve, one second pressure valve, an air bleeding valve and a recovery valve.Moreover, there is dealer to use arrange convenient and improve as the length in M302467 patent loop own causes the factors such as pressure-air waste, develop a kind of gas concentration unit as shown in No. M402188th, TaiWan, China patent announcement.
The valve body of right above-mentioned located by prior art is formed by the valve body of two mouthfuls two, only can control merely the switch of the first pressure gas source, the second pressure gas source, gas recycling module and exhaust outlet, and the length of bulk loop is fixed.While carrying out the first pressure air blowing and the air blowing of the second pressure as M402188 patent, gases at high pressure all obtain first and all valve inner passages are full of to (amounting to 4 valve bodies as an example of M402188 patent example), could carry out bottle blowing operation to bottle blowing module, unnecessary valve inner passage forms gas dead band, causes gases at high pressure waste.Though each bottle blowing may only cause the gas waste of several CC, with the output of current bottle blowing machine be about 20,000/hour~50,000 bottles/hour, the gases at high pressure that caused are wasted also considerable.
Moreover, when commonly using bottle blowing machine and carrying out the second pressure air blowing operation, for avoid pressure-air to be directly recovered by mistake, therefore recovery valve is in closed condition, when commonly using bottle blowing machine in the time that the second pressure air blowing operation switches to gas recovery operation, obtain and first really close after the second pressure valve, then open recovery valve to carry out gas recovery.But thus, need the reaction time that two valve bodies switch to switch to gas recovery operation from the second pressure air blowing operation, accumulate and also cause many processing procedure time delays.
Utility model content
The shortcoming of opening prior art on comprehensive, comprises that the length of bulk loop is fixed haply, easily produces gas dead band, causes gases at high pressure waste.And in view of solving above-mentioned shortcoming, this case proposes a kind of scheme of gas recovery valve group, this scheme has adjustable loop state, reduces gas dead band and accelerates gas and reclaim the advantage of operation.
For achieving the above object, the technical solution used in the present invention is:
The present invention is to provide a kind of gas recovery valve group, includes:
Reclaim air bleeding valve, it is to be provided with an exhaust outlet, in a recovery exhaust valve to reclaim mouth and a connected entrance, and this recovery exhaust valve is provided with a recovery exhaust pilot valve, this recovery exhaust pilot valve is optionally to control that connected entrance is communicated with exhaust outlet or connected entrance is communicated with recovery mouth; Wherein, this recovery mouth is to be connected to a gas recycling module;
The first pressure valve, it is to be provided with one first pressure breathing mouth, one first pressure series connection mouth and one first pressure communication mouth in one first pressure valve body, and this first pressure valve body is provided with one first pressure pilot valve, this first pressure pilot valve is optionally control that the first pressure communication mouth is communicated with the first pressure breathing mouth or the first pressure communication mouth connect with the first pressure mouth connection; Wherein, this first pressure breathing mouth is connected in one first pressure gas source, and this first pressure series connection mouth is connected in the connected entrance that reclaims air bleeding valve; And
The second pressure valve, it is to be provided with one second pressure breathing mouth, one second pressure series connection mouth and one second pressure communication mouth in one second pressure valve body, and this second pressure valve body is provided with one second pressure pilot valve, this second pressure pilot valve is optionally control that the second pressure communication mouth is communicated with the second pressure breathing mouth or the second pressure communication mouth connect with the second pressure mouth connection; Wherein, this second pressure breathing mouth is connected in one second pressure gas source, and the series connection mouthful of this second pressure is connected in the first pressure communication mouth, and this second pressure communication mouth is to be connected to a bottle blowing module.
Further, described recovery exhaust pilot valve is to be provided with one first controlled valve A and a second switch valve A in reclaiming exhaust valve, this recovery exhaust pilot valve is to be connected in series the first controlled valve A and second switch valve A with a valve rod A, to drive the first controlled valve A and second switch valve A synchronization action.
Further, described the first controlled valve A controls connected entrance whether to be communicated with recovery mouthful, and this second switch valve A controls connected entrance whether to be communicated with exhaust outlet.
Further, described the first pressure pilot valve is in the first pressure valve body, to be provided with one first controlled valve B and a second switch valve B, this the first pressure pilot valve is to be connected in series the first controlled valve B and second switch valve B with a valve rod B, to drive the first controlled valve B and second switch valve B synchronization action.
Further, described the first controlled valve B be control the first pressure communication mouth whether is communicated with the first pressure breathing mouth, and this second switch valve B be control the first pressure communication mouth connect with the first pressure mouth whether be communicated with.
Further, described the second pressure pilot valve is in the second pressure valve body, to be provided with one first controlled valve C and a second switch valve C, this the second pressure pilot valve is to be connected in series the first controlled valve C and second switch valve C with a valve rod C, to drive the first controlled valve C and second switch valve C synchronization action.
Further, described the first controlled valve C be control the second pressure communication mouth whether is communicated with the second pressure breathing mouth, and this second switch valve C be control the second pressure communication mouth connect with the second pressure mouth whether be communicated with.
The present invention's main purpose is: the valve body of this recovery air bleeding valve, the first pressure valve and the second pressure valve is to be three mouthfuls of two-position valves, removing can be according to job requirements such as the first pressure air blowing, the second pressure air blowing, gas recovery and exhausts, control between the first pressure gas source, the second pressure gas source, gas recycling module and exhaust outlet and bottle blowing module as outside being communicated with or blocking, more can be in above-mentioned operation, block unnecessary gas return path, reduce the formation of gas dead band and prevent gases at high pressure waste.
The present invention's secondary objective is: this case utilizes the design of three mouthfuls of two-position valves, replaces and commonly uses independent air bleeding valve and recovery valve with a recovery air bleeding valve, can effectively reduce assembling difficulty and cost.
Another secondary objective of the present invention is: the recovery air bleeding valve of this case and the first pressure valve carry out when the second pressure is blown switching action in the second pressure valve, be pre-formed and reclaim loop, in the time that the second pressure valve disconnects the second pressure gas source and bottle blowing module, this second pressure valve also can make bottle blowing module be communicated with gas recycling module simultaneously, the reaction time that only needs single valve body to switch, the switching of the second pressure air blowing operation and gas recovery operation can be completed, reaction speed, the minimizing processing procedure required time of operation can be improved.
Brief description of the drawings
Fig. 1 is the present invention's three-dimensional appearance schematic diagram;
Fig. 2 is the present invention's section combination schematic diagram;
Fig. 3 is the present invention's sectional perspective generalized section;
Fig. 4 is the first pressure air blowing action schematic diagram of the present invention;
Fig. 5 is the second pressure air blowing action schematic diagram of the present invention;
Fig. 6 is that the present invention's gas reclaims action schematic diagram;
Fig. 7 is the present invention's gas discharging action schematic diagram.
Mark in figure:
1, gas recovery valve group; 10, reclaim air bleeding valve; 11, reclaim exhaust valve;
12, reclaim mouth; 13, exhaust outlet; 14, connected entrance;
15, reclaim exhaust pilot valve; 151, the first controlled valve A; 152, second switch valve A;
153, valve rod A; 20, the first pressure valve; 21, the first pressure valve body;
22, the first pressure breathing mouth; 23, the first pressure series connection mouthful; 24, the first pressure communication mouth;
25, the first pressure pilot valve; 251, the first controlled valve B; 252, second switch valve B;
253, valve rod B; 30, the second pressure valve; 31, the second pressure valve body;
32, the second pressure breathing mouth; 33, the second pressure series connection mouthful: 34, the second pressure communication mouth;
35, the second pressure pilot valve; 351, the first controlled valve C; 352, second switch valve C;
353, valve rod C; 90, gas recycling module; 91, the first pressure gas source;
92, the second pressure gas source; 93, bottle blowing module.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described.
For ease of explanation the present invention represented central idea in foregoing invention content one hurdle, hereby express with specific embodiment.In embodiment various differences to as if describe in being suitable for ratio, size, deflection or the displacement of explanation, but not drawn in the ratio of actual component, close first chat bright.And in the following description, similarly assembly is to represent with identical numbering.
Please refer to shown in Fig. 1~Fig. 3, a kind of gas recovery valve of the present invention group 1, includes:
One reclaims air bleeding valve 10, it is to be provided with a recovery mouth 12, an exhaust outlet 13 and a connected entrance 14 in a recovery exhaust valve 11, and this recovery exhaust valve 11 is provided with a recovery exhaust pilot valve 15, this recovery exhaust pilot valve 15 be optionally control that connected entrance 14 is communicated with exhaust outlet 13 or connected entrance 14 with reclaim mouthfuls 12 and be communicated with.For example: this recovery exhaust pilot valve 15 is to be provided with one first controlled valve A151 and a second switch valve A152 in reclaiming exhaust valve 11, this recovery exhaust pilot valve 15 is to be connected in series the first controlled valve A151 and second switch valve A152 with a valve rod A153, to drive the first controlled valve A151 and second switch valve A152 synchronization action.And this first controlled valve A151 controls connected entrance 14 whether to be communicated with recovery mouth 12, and this second switch valve A152 controls connected entrance 14 whether to be communicated with exhaust outlet 13.Wherein, this recovery mouth 12 is to be connected to a gas recycling module 90.
One first pressure valve 20, it is to be provided with one first pressure breathing mouth 22, one first pressure series connection mouth 23 and one first pressure communication mouth 24 in one first pressure valve body 21, and this first pressure valve body 21 is provided with one first pressure pilot valve 25, this first pressure pilot valve 25 is optionally to control that the first pressure communication mouth 24 is communicated with the first pressure breathing mouth 22 or the first pressure communication mouth 24 is connected with the first pressure mouthfuls 23 to be communicated with.For example: this first pressure pilot valve 25 is in the first pressure valve body 21, to be provided with one first controlled valve B251 and a second switch valve B252, this the first pressure pilot valve 25 is to be connected in series the first controlled valve B251 and second switch valve B252 with a valve rod B253, to drive the first controlled valve B251 and second switch valve B252 synchronization action.And this first controlled valve B251 controls the first pressure communication mouth 24 whether to be communicated with the first pressure breathing mouth 22, and this second switch valve B252 controls the first pressure communication mouth 24 mouth of connecting with the first pressure 23 whether to be communicated with.Wherein, this first pressure breathing mouth 22 is connected in one first pressure gas source 91, and this first pressure series connection mouth 23 is connected in the connected entrance 14 that reclaims air bleeding valve 10.And one second pressure valve 30, it is to be provided with one second pressure breathing mouth 32, one second pressure series connection mouth 33 and one second pressure communication mouth 34 in one second pressure valve body 31, and this second pressure valve body 31 is provided with one second pressure pilot valve 35, this second pressure pilot valve 35 is optionally to control that the second pressure communication mouth 34 is communicated with the second pressure breathing mouth 32 or the second pressure communication mouth 34 is connected with the second pressure mouthfuls 33 to be communicated with.For example: this second pressure pilot valve 35 is in the second pressure valve body 31, to be provided with one first controlled valve C351 and a second switch valve C352, this the second pressure pilot valve 35 is to be connected in series the first controlled valve C351 and second switch valve C352 with a valve rod C353, to drive the first controlled valve C351 and second switch valve C352 synchronization action.And this first controlled valve C351 controls the second pressure communication mouth 34 whether to be communicated with the second pressure breathing mouth 32, and this second switch valve C352 controls the second pressure communication mouth 34 mouth of connecting with the second pressure 33 whether to be communicated with.Wherein, this second pressure breathing mouth 32 is connected in one second pressure gas source 92, and this second pressure series connection mouthfuls 33 is connected in the first pressure communication mouth 24, and this second pressure communication mouth 34 is to be connected to a bottle blowing module 93.Wherein, above-mentioned recovery exhaust valve 11, the first pressure valve body 21 and the second pressure valve body 31 is to can be independent, integrated or combination person mutually separately.
Understanding after above-mentioned this case detailed structure, is below to describe in detail one by one for the operating principle of this case:
As shown in Figure 4, in the time that bottle blowing machine carries out the first pressure air blowing, this gas recovery valve group 1 is the first pressure pilot valve 25 to be switched to the first controlled valve B251 opens, second switch valve B252 closes, and the second pressure pilot valve 35 switches to, the first controlled valve C351 closes, the state of second switch valve C352 unlatching, make the first pressure gas source 91 be communicated to bottle blowing module 93 by the first pressure communication mouth 24, the second pressure series connection mouth 33 and the second pressure communication mouth 34, with the gases at high pressure that utilize the first pressure gas source 91, bottle blowing module 93 is blown.Wherein, connected entrance 14 and the first pressure series connection mouthfuls 23 is because second switch valve B252 closes, and enters without gas, can reduce the formation in gas dead band.And now reclaim that air bleeding valve 10 can switch to that the first controlled valve A151 opens in advance, the second switch valve A152 state of closing makes to reclaim mouthfuls 12 in advance, keep being communicated with (as shown in Fig. 4) between connected entrance 14 and the series connection of the first pressure mouthfuls 23, but B252 closes because of second switch valve, the gases at high pressure of the first pressure gas source 91 can't flow into.
As shown in Figure 5, when bottle blowing machine carries out the second pressure while blowing, this gas recovery valve group 1 is the second pressure pilot valve 35 to be switched to the first controlled valve C351 closes, the state of second switch valve C352 unlatching.Make the second pressure gas source 92 be communicated to bottle blowing module 93 by the second pressure breathing mouth 32 and the second pressure communication mouth 34, with the gases at high pressure that utilize the second pressure gas source 92, bottle blowing module 93 is blown.Wherein, reclaim air bleeding valve 10, the first pressure valve 20 and the series connection of the second pressure mouthfuls 33 because the first controlled valve C351 closes, and enter without gas, also there is the effect that reduces the formation of gas dead band.
As shown in Figure 6, in the time that bottle blowing machine carries out gas recovery, this gas recovery valve group 1 is that recovery exhaust pilot valve 15 is remained unchanged, and the first pressure pilot valve 25, the second pressure pilot valve 35 switch to the first controlled valve (B, C) 251,351 unlatchings, second switch valve (B, C) 252,352 states of closing.Make gas recycling module 90 be communicated to bottle blowing module 93 by gas recovery valve group 1, with by the pressure-air recycling of bottle blowing module 93.
It is worth mentioning that, the first pressure valve 20 of the present invention is in the time that the second pressure valve 30 is carried out the second pressure air blowing, to switch in advance action, make in advance to reclaim mouth 12, between connected entrance 14 and the first pressure series connection mouth 23, keep being communicated with, be pre-formed and reclaim loop, in the time that bottle blowing machine carries out gas recovery, only the second pressure pilot valve 35 need be switched to the first controlled valve C351 opens, the state that second switch valve C352 closes, this second pressure valve 30 can make bottle blowing module 93 be communicated with gas recycling module 90 simultaneously, the reaction time that only needs single valve body to switch, can complete the switching of the second pressure air blowing operation and gas recovery operation, can improve the reaction speed of operation, reduce processing procedure required time.
Moreover, as shown in Figure 7, be down to predetermined pressure lower time when the pressure-air of bottle blowing module 93 because reclaiming, reclaim exhaust pilot valve 15 and switch to that the first controlled valve A151 closes, the state of second switch valve A152 unlatchings, 13 releases of remaining gas permeation exhaust outlet are discharged in atmosphere.
By describing in detail above, can make to know this skill person and understand that the present invention is really completely different with the design of commonly using, and has suitable novelty.And the present invention has effect that the design of commonly using cannot be expected, meet in fact the positive important document that patent is checked and approved, whence proposes patent application in accordance with the law.
Though the present invention explains with a preferred embodiment, be skillful in this skill person and can do various multi-form changes not departing under the present invention spirit and category.Above illustrated embodiment is only in order to the present invention to be described, non-in order to limit the present invention's scope.Such as do not disobey various modifications or the variation that spirit of the present invention is engaged in, all categories that this invention is intended to protection that belongs to.

Claims (7)

1. a gas recovery valve group, it is characterized in that: include and reclaim air bleeding valve (10), it is to be provided with an exhaust outlet (13), in a recovery exhaust valve (11) to reclaim mouthful (12) and a connected entrance (14), and this recovery exhaust valve (11) is provided with a recovery exhaust pilot valve (15), this recovery exhaust pilot valve (15) be optionally control that connected entrance (14) is communicated with exhaust outlet (13) or connected entrance (14) with reclaim mouthful (12) and be communicated with; Wherein, this recovery mouth (12) is to be connected to a gas recycling module (90);
The first pressure valve (20), it is to be provided with one first pressure breathing mouth (22), one first pressure series connection mouthful (23) and one first pressure communication mouth (24) in one first pressure valve body (21), and this first pressure valve body (21) is provided with one first pressure pilot valve (25), this first pressure pilot valve (25) be optionally control the first pressure communication mouth (24) with first pressure breathing mouth (22) be communicated with or the first pressure communication mouth (24) connect with the first pressure mouth (23) connection; Wherein, this first pressure breathing mouth (22) is connected in one first pressure gas source (91), and this first pressure series connection mouthful (23) is connected in the connected entrance (14) that reclaims air bleeding valve (10); And second pressure valve (30), it is to be provided with one second pressure breathing mouth (32), one second pressure series connection mouthful (33) and one second pressure communication mouth (34) in one second pressure valve body (31), and this second pressure valve body (31) is provided with one second pressure pilot valve (35), this second pressure pilot valve (35) is the mouth connection (33) of optionally controlling that the second pressure communication mouth (34) is communicated with the second pressure breathing mouth (32) or the second pressure communication mouth (34) connect with the second pressure; Wherein, this the second pressure breathing mouth (32) is connected in one second pressure gas source (92), and this second pressure series connection mouthful (33) is connected in the first pressure communication mouth (24), and this second pressure communication mouth (34) is to be connected to a bottle blowing module (93).
2. gas recovery valve group according to claim 1, it is characterized in that: described recovery exhaust pilot valve (15) is to be provided with one first controlled valve A (151) and a second switch valve A (152) in reclaiming exhaust valve (11), this recovery exhaust pilot valve (15) is with valve rod A (153) serial connection the first controlled valve A (151) and a second switch valve A (152), to drive the first controlled valve A (151) and second switch valve A (152) synchronization action.
3. gas recovery valve group according to claim 2, it is characterized in that: described the first controlled valve A (151) controls connected entrance (14) whether to be communicated with reclaiming mouthful (12), and this second switch valve A (152) controls connected entrance (14) whether to be communicated with exhaust outlet (13).
4. gas recovery valve group according to claim 1, it is characterized in that: described the first pressure pilot valve (25) is in the first pressure valve body (21), to be provided with one first controlled valve B (251) and a second switch valve B (252), this the first pressure pilot valve (25) is with valve rod B (253) serial connection the first controlled valve B (251) and a second switch valve B (252), to drive the first controlled valve B (251) and second switch valve B (252) synchronization action.
5. gas recovery valve group according to claim 4, it is characterized in that: described the first controlled valve B (251) be control the first pressure communication mouth (24) whether is communicated with the first pressure breathing mouth (22), and this second switch valve B (252) be control the first pressure communication mouth (24) connect with the first pressure mouth (23) whether be communicated with.
6. gas recovery valve group according to claim 1, it is characterized in that: described the second pressure pilot valve (35) is in the second pressure valve body (31), to be provided with one first controlled valve C (351) and a second switch valve C (352), this the second pressure pilot valve (35) is with valve rod C (353) serial connection the first controlled valve C (351) and a second switch valve C (352), to drive the first controlled valve C (351) and second switch valve C (352) synchronization action.
7. gas recovery valve group according to claim 6, it is characterized in that: described the first controlled valve C (351) be control the second pressure communication mouth (34) whether is communicated with the second pressure breathing mouth (32), and this second switch valve C (352) be control the second pressure communication mouth (34) connect with the second pressure mouth (33) whether be communicated with.
CN201320735054.3U 2013-11-11 2013-11-11 Gas recovery valve group Withdrawn - After Issue CN203792694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320735054.3U CN203792694U (en) 2013-11-11 2013-11-11 Gas recovery valve group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320735054.3U CN203792694U (en) 2013-11-11 2013-11-11 Gas recovery valve group

Publications (1)

Publication Number Publication Date
CN203792694U true CN203792694U (en) 2014-08-27

Family

ID=51374958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320735054.3U Withdrawn - After Issue CN203792694U (en) 2013-11-11 2013-11-11 Gas recovery valve group

Country Status (1)

Country Link
CN (1) CN203792694U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103587108B (en) * 2013-11-11 2016-01-13 金准(福建)精密机械工业有限公司 Gas recovery valve group
CN113459474A (en) * 2021-06-04 2021-10-01 江苏新美星包装机械股份有限公司 Method and device for realizing six-step bottle blowing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103587108B (en) * 2013-11-11 2016-01-13 金准(福建)精密机械工业有限公司 Gas recovery valve group
CN113459474A (en) * 2021-06-04 2021-10-01 江苏新美星包装机械股份有限公司 Method and device for realizing six-step bottle blowing

Similar Documents

Publication Publication Date Title
CN203792694U (en) Gas recovery valve group
CN206111921U (en) Extension ladder cylinder
CN103587108B (en) Gas recovery valve group
CN203582032U (en) Ash silo discharging system
CN105711260B (en) A kind of quick ink-joiner and refilling method
CN107364720A (en) A kind of twin flue transmitting-receiving work station, pneumatic sample Transmission system and control method
CN209278504U (en) Double flap valves control elephant trunk blanking sealing device
CN103318658B (en) The automatic feeding system of application vacuum feeder
CN203235415U (en) Dry desulfurizing tower
CN205559942U (en) Vacuum pressure dip coating equipment and quick opening device of pneumatic valve thereof
CN204434275U (en) Preposition supercharging monofilm list pump oxygen supply equipment
CN203265151U (en) Pneumatic air blowing device
CN207034259U (en) A kind of blown without electricity removes the valve gear and wine dispenser of residual wine
CN2474838Y (en) Dual diaphragm impulse valve
CN202403441U (en) Helium circulating cooling system
CN101425473B (en) Vacuum keeping device and wafer cutting machine having the device
CN207090513U (en) A kind of twin flue transmitting-receiving work station and pneumatic sample Transmission system
CN206310912U (en) Roller kilns replace the air ventilation device of room
CN201729512U (en) Material conveying system
CN205771997U (en) The error prevention device of the feed pipe in switching feed system
CN202790827U (en) Push-pull interconnected control delay pulse combined reversing valve
CN106740941B (en) A kind of positive pressure sub-pressure conversion device and method
CN109896310B (en) High-temperature material conveying, discharging and dust removing method based on double dust removing units
CN202657522U (en) Intelligent waste gas recovery device of tank truck
TWI529054B (en) Gas recycling valve assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140827

Effective date of abandoning: 20160113

C25 Abandonment of patent right or utility model to avoid double patenting