CN203782746U - Mountain valley backfill tunnel structure - Google Patents

Mountain valley backfill tunnel structure Download PDF

Info

Publication number
CN203782746U
CN203782746U CN201420055982.XU CN201420055982U CN203782746U CN 203782746 U CN203782746 U CN 203782746U CN 201420055982 U CN201420055982 U CN 201420055982U CN 203782746 U CN203782746 U CN 203782746U
Authority
CN
China
Prior art keywords
backfill
tunnel structure
cheuch
fill
structure body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420055982.XU
Other languages
Chinese (zh)
Inventor
姚裕春
袁碧玉
李安洪
徐骏
李楚根
葛学军
庞应刚
曾永红
李井元
赵青海
唐第甲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu University of Information Technology
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
Chengdu Information Technology Co Ltd of CAS
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Information Technology Co Ltd of CAS, China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical Chengdu Information Technology Co Ltd of CAS
Priority to CN201420055982.XU priority Critical patent/CN203782746U/en
Application granted granted Critical
Publication of CN203782746U publication Critical patent/CN203782746U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a mountain valley backfill tunnel structure, which has the characteristics of convenience in construction, safety and reliability, economy and the like. The mountain valley backfill tunnel structure comprises a backfill concrete foundation, a tunnel structure body, backfill cushion filling bodies, a drainage channel, a backfill protecting layer and a reclamation filling body, wherein the backfill concrete foundation is longitudinally poured on a stable rock-soil body of a valley foundation base along the road, and the tunnel structure body is arranged at the top of the backfill concrete foundation; the backfill cushion filling bodies are filled at the two ends of the backfill concrete foundation and the tunnel structure body, and the drainage channel is arranged at the bottom of a valley and is communicated with the backfill cushion filling bodies at the two sides of the backfill concrete foundation; the backfill protecting layer is filled at the tops of the backfill cushion filling bodies and the tunnel structure body, and the reclamation filling body is filled at the tops of the backfill cushion filling bodies and the tunnel structure body.

Description

Mountain area cheuch backfill tunnel construction
Technical field
The utility model relates to civil engineering, and particularly ground engineering is made in the control of mountain road Debris Flow or the backfill of mountain road cheuch section.
Background technology
In China, mountain area cheuch is extremely grown, when the highway construction of building is passed through cheuch, conventionally pass through with the form of bridge, in the time thering is Debris Flow harm, need to pass through with Longspan Bridge, if but the line elevation of cheuch two ends road is when lower, the mud-rock flow danger of cheuch section can not be eliminated, or when needing backfill cheuch to carry out mountain area, the cheuch district of crossing at existing path link makes when ground, need a kind of new mountain area cheuch path link to cross form of structure with head it off, and there is easy construction, safe and reliable, economic dispatch feature, and meet the requirement of environmental protection.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of mountain area cheuch backfill tunnel construction, has easy construction, safe and reliable, economic dispatch feature.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
Cheuch backfill tunnel construction in mountain area of the present utility model, is characterized in that it comprises: fill concrete basis, and longitudinally build in cheuch substrate and stablize on Rock And Soil along road; Tunnel structure body, is arranged at top, fill concrete basis; Backfill buffering filling body, fills in fill concrete basis and tunnel structure body two ends; Drainage channel, is arranged at ditch valley portions, is communicated with the backfill buffering filling body of both sides, fill concrete basis; Backfill topping, fills in backfill buffering filling body and tunnel structure body top; Make ground filling body, fill in backfill buffering filling body and tunnel structure body top.
The beneficial effects of the utility model are, efficiently solve mountain road cheuch section debris flow or ground problem is made in the cheuch district backfill of crossing at existing path link, and have easy construction, safe and reliable, economic dispatch feature, and meet the requirement of environmental protection.
Brief description of the drawings
This manual comprises following two width accompanying drawings:
Fig. 1 is the schematic cross-sectional view of the utility model mountain area cheuch backfill tunnel construction;
Fig. 2 is the drainage channel structural representation of the utility model mountain area cheuch backfill tunnel construction;
Member shown in figure, toponym and corresponding mark: fill concrete basis 1, tunnel structure body 2, backfill cushion filling body 3, drainage channel 4, concrete foundation 41, spilled water hole 42, backfill rubble 43, permeable geotextiles 44, backfill topping 5, make ground filling body 6.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
With reference to Fig. 1, cheuch backfill tunnel construction in mountain area of the present utility model comprises: fill concrete basis 1, and longitudinally build in cheuch substrate and stablize on Rock And Soil along road; Tunnel structure body 2, is arranged at 1 top, fill concrete basis; Backfill buffering filling body 3, fills in fill concrete basis 1 and tunnel structure body 2 two ends; Drainage channel 4, is arranged at ditch valley portions, is communicated with the backfill buffering filling body of both sides, fill concrete basis; Backfill topping 5, fills in backfill buffering filling body 3 and tunnel structure body top 2; Make ground filling body 6, fill in backfill buffering filling body 3 and tunnel structure body 2 tops.
Fill concrete basis 1 is as the carrying basis of tunnel structure body 2, and ensures the monolithic stability of tunnel structure body 2 and control its settling amount.Tunnel structure body 2, as passing road, can be avoided the harm of mud-rock flow to highway construction, or avoids cheuch backfill to make ground and affect existing road.Backfill buffering filling body 3, protection fill concrete basis 1 and tunnel structure body 2, increase its stability and the percussion of avoiding mud-rock flow.Drainage channel 4 is arranged at ditch valley portions, is communicated with the backfill buffering filling body of both sides, fill concrete basis, discharges the underground ponding of fill concrete basis 1 backer's side, ensures the long-term stability of total body.Backfill topping 5 avoids mud-rock flow directly to impact fill concrete basis 1 and tunnel structure body 2, and sapping backfill buffering filling body 3.Ground filling body 6 backfill cheuches are made in utilization, form and make ground using area.This structure efficiently solves mountain road cheuch section debris flow or ground problem is made in the cheuch district backfill of crossing at existing path link, and has easy construction, safe and reliable, economic dispatch feature, and meets the requirement of environmental protection, has wide popularizing application prospect.
With reference to Fig. 1, described fill concrete basis 1 is longitudinally built in cheuch substrate and is stablized on Rock And Soil along road, its depth of burying need meet the deformation requirements of top tunnel structure body 2 and the pressure control requirement of top filling body, and ensures from have enough safeties under Upper Structure.Between described tunnel structure body 2 and fill concrete basis 1, need to take shearing resistance measure, can not occur and fill concrete basis 1 between shear strain, its structural strength can be resisted top and be filled native load.The described ground filling body 6 of making adopts in the time that backfill tunnel construction is made ground for backfill, and its filled height is determined according to making ground absolute altitude.Described backfill buffering filling body 3 is answered closely knit filling, and coefficient of consolidation is not less than 0.8.Described backfill topping 5 adopts mortar flag stone to fill when preventing and treating mud-rock flow when backfill tunnel construction, and thickness is not less than 0.5m.
Described drainage channel 4 arranges together every 10~20m in ditch valley portions, its sectional dimension is wide high 1.0~2.0m, longitudinal gradient is not less than 4%, with reference to Fig. 2, described drainage channel 4 is made up of the backfill rubble 43 that has the concrete foundation 41 in groove type cross section and fill in the inner, on the sidewall of concrete foundation 41, spilled water hole 42 is offered at interval, lays permeable geotextiles 44 at the end face of backfill rubble 43 and concrete foundation 41.When by 1 section, fill concrete basis, concrete foundation 41 adopts reinforced concrete structure form.
Some principles of the above the utility model mountain area cheuch backfill tunnel construction that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (5)

1. mountain area cheuch backfill tunnel construction, is characterized in that it comprises: fill concrete basis (1), and longitudinally build in cheuch substrate and stablize on Rock And Soil along road; Tunnel structure body (2), is arranged at top, fill concrete basis (1); Backfill buffering filling body (3), fills in fill concrete basis (1) and tunnel structure body (2) two ends; Drainage channel (4), is arranged at ditch valley portions, is communicated with the backfill buffering filling body (3) of both sides, fill concrete basis (1); Backfill topping (5), fills in backfill buffering filling body (3) and tunnel structure body top (2); Make ground filling body (6), fill in backfill buffering filling body (3) and tunnel structure body (2) top.
2. cheuch backfill tunnel construction in mountain area as claimed in claim 1, is characterized in that: closely knit the filling of described backfill buffering filling body (3), coefficient of consolidation is not less than 0.8.
3. cheuch backfill tunnel construction in mountain area as claimed in claim 1, is characterized in that: described drainage channel (4) arranges together every 10~20m in ditch valley portions, and its sectional dimension is wide high 1.0~2.0m, and longitudinal gradient is not less than 4%.
4. cheuch backfill tunnel construction in mountain area as claimed in claim 1, is characterized in that: described backfill topping (5) adopts mortar flag stone to fill, and thickness is not less than 0.5m.
5. cheuch backfill tunnel construction in mountain area as claimed in claim 1, it is characterized in that: described drainage channel (4) is made up of the backfill rubble (43) that has the concrete foundation (41) in groove type cross section and fill in the inner, on the sidewall of concrete foundation (41), spilled water hole (42) is offered at interval, lays permeable geotextiles (44) at the end face of backfill rubble (43) and concrete foundation (41).
CN201420055982.XU 2014-01-28 2014-01-28 Mountain valley backfill tunnel structure Withdrawn - After Issue CN203782746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420055982.XU CN203782746U (en) 2014-01-28 2014-01-28 Mountain valley backfill tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420055982.XU CN203782746U (en) 2014-01-28 2014-01-28 Mountain valley backfill tunnel structure

Publications (1)

Publication Number Publication Date
CN203782746U true CN203782746U (en) 2014-08-20

Family

ID=51318948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420055982.XU Withdrawn - After Issue CN203782746U (en) 2014-01-28 2014-01-28 Mountain valley backfill tunnel structure

Country Status (1)

Country Link
CN (1) CN203782746U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821164A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 Mountainous area valley backfill tunnel structure
CN105736019A (en) * 2014-12-26 2016-07-06 华北冶建工程建设有限公司 Measure chamber treatment technology for drainage tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821164A (en) * 2014-01-28 2014-05-28 中铁二院工程集团有限责任公司 Mountainous area valley backfill tunnel structure
CN103821164B (en) * 2014-01-28 2016-08-17 中铁二院工程集团有限责任公司 Mountain area cheuch backfill tunnel construction
CN105736019A (en) * 2014-12-26 2016-07-06 华北冶建工程建设有限公司 Measure chamber treatment technology for drainage tunnel

Similar Documents

Publication Publication Date Title
CN110144908B (en) Construction method of deep grouting reinforcement landslide structure
CN201722704U (en) Pre-stressed cantilever counter rib holding retaining wall
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN203866663U (en) Porous pavement structure
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN103806347A (en) Lateral pile-plank structure suitable for rocky abrupt-slope embankment
CN107965327A (en) Arcuately tunnel bottom liner structure and its drainage system
CN202809501U (en) Reinforced load reducing structure of motorway high filling culvert in mountainous area
CN204139199U (en) For the gear protection structure of levelling of the land
CN204343305U (en) The potential Sliding Slopes of shallow/deep groove type and landslide reinforcement controlling device
CN103821164A (en) Mountainous area valley backfill tunnel structure
CN203782746U (en) Mountain valley backfill tunnel structure
CN102518136A (en) Flexible reinforced combined protection structure for preventing and treating humidifying damage of soft rock strongly weathered zone
CN204753261U (en) Light -duty road bed of a doublestage shelves structure
CN203284795U (en) Buttressed retaining wall with anchor board
CN203034383U (en) Load reduction high filling arch culvert
CN204662246U (en) steep slope bridge pier structure
CN204356606U (en) The light-duty road structure in abrupt slope
CN100564699C (en) The improvement method in location, expansive soil slope landslide
CN204325837U (en) Basement rock covers the high roadbed reclamation lateral restraint reinforcing construction of soft foundation
CN207672604U (en) A kind of pellet type retaining wall structure
CN103270903B (en) Ecological planting device
CN103233447B (en) High concrete face rockfill dam seismic strengthening structure and construction method thereof
CN205088528U (en) Cause of a quarrel height piece of smooth land concrete roadbed structure that fills is abandoned to soft ground
CN203782509U (en) Unfavorable geologic body deep cutting frame reinforcing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 620031 Sichuan Province, Chengdu City Kam Tong Road No. 3

Patentee after: China Railway Eryuan Engineering Group Co., Ltd.

Patentee after: Chengdu information engineering university

Address before: 620031 Sichuan Province, Chengdu City Kam Tong Road No. 3

Patentee before: China Railway Eryuan Engineering Group Co., Ltd.

Patentee before: Chengdu Information Technology Institute

AV01 Patent right actively abandoned

Granted publication date: 20140820

Effective date of abandoning: 20160817

C25 Abandonment of patent right or utility model to avoid double patenting