CN203782644U - Construction adit sealing structure - Google Patents

Construction adit sealing structure Download PDF

Info

Publication number
CN203782644U
CN203782644U CN201420011650.1U CN201420011650U CN203782644U CN 203782644 U CN203782644 U CN 203782644U CN 201420011650 U CN201420011650 U CN 201420011650U CN 203782644 U CN203782644 U CN 203782644U
Authority
CN
China
Prior art keywords
arch
construction
hole
adit
occluding body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420011650.1U
Other languages
Chinese (zh)
Inventor
梁枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG TIANLIFANG CONSTRUCTION CO.,LTD.
Wu Ruiyou
Wu Zhuolun
Original Assignee
Chengdu LVDI Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu LVDI Technology Co Ltd filed Critical Chengdu LVDI Technology Co Ltd
Priority to CN201420011650.1U priority Critical patent/CN203782644U/en
Application granted granted Critical
Publication of CN203782644U publication Critical patent/CN203782644U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a construction adit sealing structure which comprises a construction adit, wherein the top and the bottom of the construction adit are connected with adit baffles; the two adit baffles are connected by virtue of a steel bar support column which is arranged in a manner of penetrating through the two adit baffles; an overhaul passage is arranged between the two adit baffles; the middle of the overhaul passage is provided with an access door; the access door passes through the middle of the overhaul passage and is connected with an arch-shaped sealing body; the side surface of the arch-shaped sealing body is provided with an upstream face; the upper and lower ends of the arch-shaped sealing body are supported on the adit baffles on the two sides; one side of the arch-shaped sealing body is connected with a sealing section; the sealing section is provided with a longitudinal section with two smaller ends and a larger middle; the sealing section is internally provided with a diversion tunnel; a press tunnel is formed between the arch-shaped sealing body and the diversion tunnel. The construction adit sealing structure is applicable to permanently sealing middle-head and low-head hydraulic tunnel construction adits or temporarily sealing a hydraulic tunnel master cave; the sealing construction workload is less, the sealing effect is good, and the risk of damage caused by water pressure can be effectively reduced.

Description

A construction hole plugging structure
Technical field
The utility model relates to a kind of plugging structure, and particularly hole plugging structure is propped up in a kind of construction.
Background technology
The hole later stage is propped up in the construction of water conservancy project pressurized tunnel all needs to carry out shutoff, conventional occluding body arrangement is the whole fill concretes of a certain length hole section in a construction hole, utilize blocking concrete and diversion tunnel around friction and the bonding force opposing upper water pressure of rock, and be aided with the measures such as joint bar, consolidation grouting and backfill grouting.This shutoff mode exists certain problem, and the one, blocking concrete and the crown of diversion tunnel barrel and the adhesive effect of abutment wall are very not good, have larger potential safety hazard; The 2nd, adopt the length of this shutoff mode blocking concrete longer, engineering quantity is large, and cost of investment is high.The occluding body construction of construction hole is generally arranged in after hydraulic tunnel integral construction completes to be carried out, and need take the engineering straight line duration, and if routinely plug carry out shutoff, can strengthen later stage projects amount and difficulty of construction.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, provide in a kind of being applicable to, low water head hydraulic tunnel construction the permanent shutoff in hole or the main hole of a hydraulic tunnel temporary blocking, and plugging construction workload is little, hole plugging structure is propped up in the construction that plugging effect is good.
To achieve these goals, the technical solution adopted in the utility model is such: hole plugging structure is propped up in construction of the present utility model, comprise a construction hole, a construction top, hole and bottom are all connected with a hole baffle plate, two hole baffle plates connect by reinforcement bar support dagger, and reinforcement bar support dagger arranges through two hole baffle plates, between two hole baffle plates, be provided with access path, access path middle part offers access door, access door is connected with arch occluding body through access path middle part, arch occluding body side is upstream face, the upper and lower two end supports of arch occluding body is on a hole baffle plate of both sides, arch occluding body one side is connected with block section, vertical section, block section is block section broad in the middle small in ends, in block section, be provided with diversion tunnel, between arch occluding body and diversion tunnel, form and press tunnel, block section arranges near reinforcement bar support dagger.
Further, as a kind of concrete form of structure, arch occluding body described in the utility model is Eccentric Circular Ring one section.
Further, as a kind of concrete form of structure, the circular arc Plane Angle of arch occluding body described in the utility model is between 100 to 120 degree.
Further, as a kind of concrete form of structure, between arch occluding body upstream face described in the utility model and access door and block section, be reserved with and fill seam.
Further, as a kind of concrete form of structure, in filling seam described in the utility model, be provided with packing material.
Compared with prior art, the utility model has the advantage of: during a utility model construction hole plugging structure is applicable to, the construction of low water head hydraulic tunnel the permanent shutoff in hole or the main hole of a hydraulic tunnel temporary blocking, and plugging construction workload is little, plugging effect is good, and can effectively reduce the risk that water pressure is destroyed.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
In figure: 1. a hole baffle plate; 2. access path; 3. access door; 4. arch occluding body; 5. press tunnel; 6. block section; 7. diversion tunnel; 8. reinforcement bar support dagger; 9. hole is propped up in construction.
The specific embodiment
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, basic structure of the present utility model is only described in a schematic way, so it only show the formation relevant with the utility model.
The preferred embodiment of the utility model construction hole plugging structure as shown in Figure 1, comprise a construction hole 9, construction 9 top, hole and bottom are all connected with a hole baffle plate 1, two hole baffle plates 1 connect by reinforcement bar support dagger 8, and reinforcement bar support dagger 8 arranges through two hole baffle plates 1, between two hole baffle plates 1, be provided with access path 2, access path 2 middle parts offer access door 3, access door 3 is connected with arch occluding body 4 through access path 2 middle parts, arch occluding body 4 sides are upstream face, arch occluding body is two end supports propping up on hole baffle plate 1 in both sides Shang Xia 4, arch occluding body 4 one sides are connected with block section 6, 6 vertical sections, block section are block section broad in the middle 6 small in ends, in block section 6, be provided with diversion tunnel 7, between arch occluding body 4 and diversion tunnel 7, form and press tunnel 5, block section 6 arranges near reinforcement bar support dagger 8, described arch occluding body 4 is Eccentric Circular Ring one section, the circular arc Plane Angle of described arch occluding body 4 is between 100 to 120 degree, between described arch occluding body 4 upstream faces and access door 3 and block section 6, be reserved with and fill seam, in described filling seam, be provided with packing material.
During a utility model construction hole plugging structure is applicable to, the construction of low water head hydraulic tunnel the permanent shutoff in hole or the main hole of a hydraulic tunnel temporary blocking, and plugging construction workload is little, plugging effect is good, and can effectively reduce the risk that water pressure is destroyed.The circular arc Plane Angle of described arch occluding body 4 is that between 100 to 120 degree, plugging effect is better; Between described arch occluding body 4 upstream faces and access door 3 and block section 6, be reserved with and fill seam, make its sealing effectiveness good.
The above-mentioned foundation desirable embodiment of the present utility model of take is enlightenment, and by above-mentioned description, relevant staff can, within not departing from the scope of this utility model technological thought, carry out various change and modification completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to claim scope.

Claims (5)

1. hole plugging structure is propped up in a construction, comprise a construction hole, it is characterized in that: a construction top, hole and bottom are all connected with a hole baffle plate, two hole baffle plates connect by reinforcement bar support dagger, and reinforcement bar support dagger arranges through two hole baffle plates, between two hole baffle plates, be provided with access path, access path middle part offers access door, access door is connected with arch occluding body through access path middle part, arch occluding body side is upstream face, the upper and lower two end supports of arch occluding body is on a hole baffle plate of both sides, arch occluding body one side is connected with block section, vertical section, block section is block section broad in the middle small in ends, in block section, be provided with diversion tunnel, between arch occluding body and diversion tunnel, form and press tunnel, block section arranges near reinforcement bar support dagger.
2. hole plugging structure is propped up in construction according to claim 1, it is characterized in that: described arch occluding body is Eccentric Circular Ring one section.
3. hole plugging structure is propped up in construction according to claim 1, it is characterized in that: the circular arc Plane Angle of described arch occluding body is between 100 to 120 degree.
4. hole plugging structure is propped up in construction according to claim 1, it is characterized in that: between described arch occluding body upstream face and access door and block section, be reserved with and fill seam.
5. hole plugging structure is propped up in construction according to claim 4, it is characterized in that: in described filling seam, be provided with packing material.
CN201420011650.1U 2014-01-09 2014-01-09 Construction adit sealing structure Expired - Fee Related CN203782644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420011650.1U CN203782644U (en) 2014-01-09 2014-01-09 Construction adit sealing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420011650.1U CN203782644U (en) 2014-01-09 2014-01-09 Construction adit sealing structure

Publications (1)

Publication Number Publication Date
CN203782644U true CN203782644U (en) 2014-08-20

Family

ID=51318847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420011650.1U Expired - Fee Related CN203782644U (en) 2014-01-09 2014-01-09 Construction adit sealing structure

Country Status (1)

Country Link
CN (1) CN203782644U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141286A (en) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 Construction adit blocking structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104141286A (en) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 Construction adit blocking structure

Similar Documents

Publication Publication Date Title
CN204646269U (en) A kind of steel arch frame lock foot anchor tube device for reinforcing soft stratum tunnel
CN102628352B (en) Multi-section fixed point hydraulic fracturing method
CN203430473U (en) Underground hydraulic fracturing drill hole sealing device of coal mine
CN206477871U (en) A kind of gob side entry driving coal column is reinforced with swollen locking-type two-ended cables
CN202946188U (en) Gas extraction drilling hole multiphase medium plugging device
CN202881945U (en) Grouting anchor-bolt-end type multistage stop-grouting plug
CN106988780A (en) A kind of girdle goaf paste body filling construction method
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN104141286A (en) Construction adit blocking structure
CN202131618U (en) Seepage-prevention joint device for underground diaphragm wall
CN203782644U (en) Construction adit sealing structure
CN202788739U (en) High pressure water inrush point non-pressure plugging structure
CN210977395U (en) Slip casting hole sealing device
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN202644531U (en) Pressure-preloading pile sealing device for static pressure pile of anchor rod
CN204921007U (en) Process systems is strutted in stock slip casting
CN204186410U (en) A kind of coal mine filling transversal end hydraulic support
CN206570813U (en) Diaphram wall toe of wall grouting behind shaft or drift lining constructing device
CN203081467U (en) Pressure tunnel arched plugging structure
CN105089687B (en) Bolt grouting support process system
CN208396722U (en) A kind of grouting device of rectangular top pipe mud
CN204002688U (en) Borehole sealing device
CN103195032A (en) Plugging structure for diversion tunnel
CN203823346U (en) Plugging device for high-strength steel penstock hole
CN102953742A (en) End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: WU RUIYOU

Effective date: 20141011

Owner name: WU RUIYOU

Effective date: 20141011

Owner name: GUANGDONG TIANLIFANG CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: WU ZHUOLUN

Effective date: 20141011

Owner name: WU ZHUOLUN

Free format text: FORMER OWNER: CHENGDU LVDI TECHNOLOGY CO., LTD.

Effective date: 20141011

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 529500 YANGJIANG, GUANGDONG PROVINCE TO: 529999 YANGJIANG, GUANGDONG PROVINCE

Free format text: CORRECT: ADDRESS; FROM: 610000 CHENGDU, SICHUAN PROVINCE TO: 529500 YANGJIANG, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141011

Address after: 529999, No. 70, Xinchang Road, Dongcheng Town, Yangdong County, Guangdong, Yangjiang

Patentee after: GUANGDONG TIANLIFANG CONSTRUCTION CO.,LTD.

Address before: 529500, No. six, Lane 16, East Lake First Street, Jiangcheng District, Guangdong, Yangjiang

Patentee before: Wu Zhuolun

Patentee before: Wu Ruiyou

Effective date of registration: 20141011

Address after: 529500, No. six, Lane 16, East Lake First Street, Jiangcheng District, Guangdong, Yangjiang

Patentee after: Wu Zhuolun

Patentee after: Wu Ruiyou

Address before: 610000 Jinjiang District, Chengdu, East Street, 18-32 No. 1, floor 5, layer 517,

Patentee before: CHENGDU LYUDI TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20150109

EXPY Termination of patent right or utility model