CN203782574U - Stand column of arch frame dragging track - Google Patents

Stand column of arch frame dragging track Download PDF

Info

Publication number
CN203782574U
CN203782574U CN201420003640.3U CN201420003640U CN203782574U CN 203782574 U CN203782574 U CN 203782574U CN 201420003640 U CN201420003640 U CN 201420003640U CN 203782574 U CN203782574 U CN 203782574U
Authority
CN
China
Prior art keywords
column
stand column
support platform
runway
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420003640.3U
Other languages
Chinese (zh)
Inventor
李正元
彭思甜
范波
隋瑞凌
贺德林
谢赛军
郑文超
张部伟
段君良
陈晓磊
蔡文胜
符望春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201420003640.3U priority Critical patent/CN203782574U/en
Application granted granted Critical
Publication of CN203782574U publication Critical patent/CN203782574U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a stand column of an arch frame dragging track. The stand column comprises a stand column body formed by universal bars and connecting plates in an assembled mode, wherein a supporting platform is arranged on the top of the stand column body, rolling wheels are installed on the top of the supporting platform, and the bases of the rolling wheels are firmly fixed to the supporting platform. According to the stand column of the arch frame dragging track, the stand column body is formed by universal bars and connecting plates in the assembled mode, installation is flexible and convenient, influences on station yard operation are small, disassembly and assembly are convenient, reuse is achieved, and environmental protection performance is good. In addition, due to the rolling wheels arranged on the top of the stand column body, and a guide beam can conveniently slide on the top of the stand column; when the guide beam is erected, only one end of the guide beam needs to be hoisted to the upper portion of the stand column, then, the guide beam is pushed to move above the station yard piecewise by moving on the stand column, the whole guide beam can be conveniently installed, the stand column makes installation of the guide beam of the dragging track more convenient, and erection of the dragging track is facilitated.

Description

The column of the dilatory runway of a kind of bow member
Technical field
The utility model relates to across dilatory runway, the particularly pillar construction of dilatory runway in the steel pipe arch bridge construction of station.
Background technology
When construct in field, long-span steel pipe arch bridge spanning existing railway junction, required and railway operation condition restriction by railway electrification safety regulation, cannot move into large-scale hoisting machinery equipment.For solution must not be used the problem of large-scale hoisting machinery, we have adopted above station and have set up dilatory runway, and bracket is placed on dilatory runway, along dilatory runway, pull mode mobile in place.Its bow member does not need to use crane while constructing above field, station, can not exert an influence to railway operation, has well solved the problems referred to above.
Build dilatory runway, need to two rows be set for supporting the column of dilatory runway in field, station.Therefore, provide that a kind of rational in infrastructure to be easy to the pillar construction that dilatory runway builds very necessary.  
Utility model content
The utility model is intended to provide a kind of column of being convenient to the dilatory runway of bow member that the dilatory runway of bow member builds.
The column of the dilatory runway of bow member described in the utility model, comprise, pile foundation and by universal rod body and the assembled column body of junction plate, column body bottom is connected with the built-in fitting that pile foundation top arranges by bolt, the support platform arranging at the top of column body, roller is installed in the top of support platform, and base and the support platform of roller fixedly secure.
The column of the dilatory runway of bow member described in the utility model, its column body is assembled by universal rod body and junction plate, flexible for installation, the convenience of column body, little to a station Influence to operation, column dismounting is simultaneously also convenient, after dismounting, universal rod body and junction plate are reusable, have reduced cost, good environmental protection.
In addition, column top braces platform top is provided with roller, and while building dilatory runway, the bottom of nose girder that only need to be above column arranges the track matching with roller, and nose girder just can slide above column easily.While laying nose girder, nose girder, above end is lifted into column, then by the mode of sliding on column, is passed to the overhead of the field of arriving at a station piecemeal, can realize easily the installation of whole nose girder.When it sets up dilatory runway and is positioned at the nose girder in an overhead, station, do not need to use crane, can not exert an influence to a station operation.The pillar construction of the described dilatory runway of bow member makes the easier for installation of dilatory runway nose girder, thereby has facilitated building of dilatory runway.
Accompanying drawing explanation
Fig. 1 is the pillar construction schematic diagram of the dilatory runway of bow member described in the utility model;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is the column schematical top view of the dilatory runway of bow member described in the utility model.
The specific embodiment
The column of the dilatory runway of a kind of bow member, as shown in Figure 1, Figure 2, comprise, pile foundation 10 and by universal rod body and the assembled column body 1 of junction plate, column body bottom is connected with the built-in fitting that pile foundation top arranges by bolt, the support platform 2 arranging at the top of column body, roller 3 is installed in the top of support platform, and base 4 and the support platform 2 of roller fixedly secure.
The roller of installing in support platform has four, as Fig. 3, lays respectively at four corners of support platform.By four rolling is set, it can coordinate with nose girder base track by four rolling simultaneously when nose girder moves, and makes nose girder by more stable support, move more steady.
The support platform of column body top can be divided into former and later two, as Fig. 2, Fig. 3, is connected respectively with the universal rod body of side before and after column bodies top, and the top of two support platforms fixedly mounts respectively two rollers.
The universal rod body of column bodies top can bend laterally, and as Fig. 2, the universal rod body of outward expands outwardly the column bodies top strong point, thereby support is more stable, and the area of support platform also can be larger.
In order to strengthen the support strength of support platform pair roller, support platform can arrange upper and lower two block plates, upper steel plate 21 is being arranged side by side plural i iron 23 with lower steel plate 22 with roller position opposite position, by the i iron pair roller being arranged side by side, support, thus the support strength of reinforcement support platform pair roller.
The bearing of trend of steel pipe arch bridge and direction the out of plumb of the extension of field wire road, station due to field, leap station, the restriction of field wire road bearing of trend and the direction of column is often arrived at a station, therefore, the bearing of trend of nose girder may upright supports platform direction become angle, in order to adapt to this needs, the axis of the hard-wired roller in support platform top becomes angle with support platform, make the roller can be consistent with the direction that bridge extends as for the glide direction of nose girder on roller, thereby adapt to better the needs of building of dilatory runway.

Claims (6)

1. the column of the dilatory runway of a bow member, comprise, pile foundation and by universal rod body and the assembled column body of junction plate, column body bottom is connected with the built-in fitting that pile foundation top arranges by bolt, it is characterized in that: the support platform arranging at the top of column body, roller is installed in the top of support platform, and base and the support platform of roller fixedly secure.
2. the column of the dilatory runway of bow member according to claim 1, is characterized in that: the roller of installing in support platform has four, lays respectively at four corners of support platform.
3. bow member according to claim 1 is drawn the column of runway, it is characterized in that: the support platform of column body top can be divided into former and later two, be connected with the universal rod body of side before and after column bodies top respectively, the top of two support platforms fixedly mounts respectively two rollers.
4. the column of the dilatory runway of bow member according to claim 1, is characterized in that: the universal rod body of column bodies top bends laterally, and the universal rod body of outward expands outwardly the column bodies top strong point.
5. according to the column of the dilatory runway of the bow member described in any one in claim 1-4, it is characterized in that: support platform comprises upper and lower two block plates, upper steel plate and lower steel plate, being arranged side by side plural i iron with roller position opposite position, support by the i iron pair roller being arranged side by side.
6. according to the column of the dilatory runway of the bow member described in any one in claim 1-4, it is characterized in that: the axis of the hard-wired roller in support platform top becomes angle with support platform, making nose girder be placed in the glide direction of nose girder on roller can be consistent with the direction of bridge extension.
CN201420003640.3U 2014-01-05 2014-01-05 Stand column of arch frame dragging track Expired - Lifetime CN203782574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420003640.3U CN203782574U (en) 2014-01-05 2014-01-05 Stand column of arch frame dragging track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420003640.3U CN203782574U (en) 2014-01-05 2014-01-05 Stand column of arch frame dragging track

Publications (1)

Publication Number Publication Date
CN203782574U true CN203782574U (en) 2014-08-20

Family

ID=51318777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420003640.3U Expired - Lifetime CN203782574U (en) 2014-01-05 2014-01-05 Stand column of arch frame dragging track

Country Status (1)

Country Link
CN (1) CN203782574U (en)

Similar Documents

Publication Publication Date Title
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN102912736B (en) Vertical assembling construction method for trussed arch bridge
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN203855895U (en) Mobile jib operation platform for constructing and overhauling bridges
CN103696372B (en) A kind of erection method of steel tube arch bridge arch center
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN201874583U (en) Initiating device for shield machine
CN203959689U (en) A kind of large-type sinterer depositing dust pipeline is installed and is adjusted with operation car
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN202881858U (en) Jig frame used for vertical assembly construction of truss arc bridge
CN202787085U (en) Steel box girder large segment connection matching device with position adjusting function
CN204662929U (en) A kind of cross-line walking fence operation device
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN203782574U (en) Stand column of arch frame dragging track
CN204552760U (en) Traveling type hydraulic formwork jumbo
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN203782573U (en) Drag runway structure for erecting steel pipe arch bridge
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN205369043U (en) Long span steel case back pushes away construction and uses interim bearing structure
CN205328499U (en) Crane outrigger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140820

CX01 Expiry of patent term