CN203782567U - Bearing cable anchor group device of large cable crane - Google Patents

Bearing cable anchor group device of large cable crane Download PDF

Info

Publication number
CN203782567U
CN203782567U CN201420147332.8U CN201420147332U CN203782567U CN 203782567 U CN203782567 U CN 203782567U CN 201420147332 U CN201420147332 U CN 201420147332U CN 203782567 U CN203782567 U CN 203782567U
Authority
CN
China
Prior art keywords
anchor
cable
steel
anchor beam
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420147332.8U
Other languages
Chinese (zh)
Inventor
阳华国
黄振燕
李鸿盛
樊兆伟
郝铁宝
路小科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201420147332.8U priority Critical patent/CN203782567U/en
Application granted granted Critical
Publication of CN203782567U publication Critical patent/CN203782567U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to a bearing cable anchor group device of a large cable crane. The device comprises a bracket structure, two bearing cable anchor group beam structures, a bearing cable anchor beam adjustment structure and an anchor beam pulling and fixing structure, wherein each bearing cable anchor group beam structure comprises an anchor beam and a semi-round saddle seat; the two bearing cable anchor group beam structures are arranged at the two end parts of a horizontal fixing beam respectively; a front reinforcement beam is arranged in the middle of the front end surface of each anchor beam; a rear reinforcement beam is arranged in the middle of the rear end surface of the anchor beam; a through threading hole is formed in the middle of each of the front and rear reinforcement beams and the anchor beam; the two semi-round saddle seats are arranged on the two sides of the rear reinforcement beam of the anchor beam at one end respectively; loops formed by rewinding and fixing the ends of bearing cables sleeve the anchor beams, the horizontal fixing beam and the semi-round saddle seats. According to the device, the two ends of each bearing cable can be effectively fixed and the length of the bearing cable can be effectively adjusted at any time. The device has the advantages of simple structure, flexibility for operation, safety and good convenience forconstruction, good use effect, high construction speed, high efficiency and good quality.

Description

A kind of Large scale cable crane track cable group anchor device
Technical field
The utility model belongs to a kind of Large scale cable crane track cable group anchor device.
Background technology
In bridge construction, oneself extensively adopts suspension bridge, cable stayed bridge at present.During construction, first in suspension bridge, cable stayed bridge two sides, establish two main push-towing ropes, then on main push-towing rope, be the fixedly upper end of hoist cable of spacing distance, the lower end of hoist cable is connected with the anchorage box that forms the stiff girder two ends of bridge floor by hoist cable cup ring and hoist cable anchor ring.And main push-towing rope is comprised of several Large scale cable crane track cables (or being called for short weight cable), the two ends of each weight cable lay respectively in the anchoring base on cement bank base.For example: Liujia Gorge suspension bridge main span is 536 meters across footpath, span centre is established 65 pairs of hoist cables, rope length from 48 meters to 2.2 meters not etc., single Suo Li 500KN, 32 stiff girders hang on main push-towing rope by hoist cable.The firm bridge deck of orthotropic as bridge floor are installed from centre to bridge tower bilateral symmetry with cable crane stiff girder and its.
It is to adopt unrolled in the two ends of each weight cable and use dead this termination of cable lock padlock in the place of unrolling that the two ends of each traditional weight cable are installed in the anchoring base on cement bank base, make the two ends of weight cable form winding, again winding is penetrated in doughnut beam column, by anchor beam post and on each weight cable be installed in the lump in anchoring base.This traditional anchor device, can not effectively adjust the length of each weight cable, installation and removal inconvenience, and speed of application is slow, and long construction period does not reach standard after Suo Ligu, and efficiency is low, of poor quality, affects programming.
Utility model content
The purpose of this utility model is a kind of Large scale cable crane track cable group anchor device of design, not only can provide effectively fixing to the two ends of weight cable, and can effectively to the length of each weight cable, adjust at any time, have simple in structure, flexible operation, job safety is convenient, and result of use is good, speed of application is fast, efficiency height and the measured advantage of matter.
For this reason, the utility model is moved and is drawn fixed structure to be formed by supporting structure, weight cable group anchor beam structure, weight cable anchor beam adjustment structure and anchor beam.Wherein:
Supporting structure, for supporting and fixedly weight cable group anchor beam structure, weight cable anchor beam are adjusted structure and anchor beam and moved and draw fixed structure, by perpendicular, fix beam and horizontal solid beam is formed, supporting structure is positioned at the front portion of cement bank base, side by side and be the sides of affixed horizontal Gu Liang between two of the spacing distance setting perpendicular upper ends that fix beam, the opposite side of horizontal Gu Liang is also fixed in other two perpendicular fixing between the upper end of beam, and each perpendicular lower end that fixes beam is installed in cement bank base;
Weight cable group anchor beam structure, for fixing the termination of each weight cable, by anchor beam, semi-circular saddle, formed, two weight cable group anchor beam structures lay respectively at the both ends of horizontal Gu Liang, the front end face middle part of anchor beam is provided with front stiffening girder, the rear end face middle part of anchor beam is provided with rear stiffening girder, the middle part of forward and backward stiffening girder and anchor beam is provided with perforation through wires hole, the both sides of stiffening girder after two semi-circular saddles lay respectively on the anchor beam of one end, the termination of each weight cable fixing winding forming that unrolls is set on anchor beam and horizontal Gu Liang and semi-circular saddle;
Weight cable anchor beam is adjusted structure, for carrying out length adjustment to being set in structural each weight cable of weight cable group anchor beam, by enter to carve groove and the steel that are positioned at semi-circular saddle outside, carve plate and formed, one end that steel is carved plate is tip end, the height of plate carved by steel and the aspect ratio of semi-circular saddle is 0.7: 1, the length that steel is carved plate is greater than the length of semi-circular saddle, when steel is carved plate and is inserted between semi-circular saddle outside and corresponding anchor beam face;
Anchor beam moves and draws fixed structure, for moving, draws fixing rack structure and weight cable group anchor beam structure, by front anchor slab, rear anchor slab, steel strand, put spool and steel tapered anchor bolt is formed.Forward and backward anchor slab is provided with the cable-through hole passing for steel strand termination, front anchor slab is positioned at the front end of the perforation through wires hole on front stiffening girder, put the cement bank base that spool is positioned at the perforation through wires hole position on corresponding rear stiffening girder, the spool outside of putting of the cement bank base of rear side is provided with rear anchor slab, one termination of several steel strand through putting spool, connect through wires hole and be connected with steel tapered anchor bolt with after each cable-through hole on front anchor slab, another termination of several steel strand is connected with hydraulic adjustment device through each cable-through hole on rear anchor slab that adjustment is rear to be fixed by steel crab-bolt.
Described hydraulic adjustment device is comprised of body and two hydraulic cylinders, and body is a pressure-bearing steel plate, and two hydraulic cylinders are fixed on body two ends, and body middle part is provided with puts line hole, and the piston rod of two hydraulic cylinders ejects to a side.The termination of described steel strand is threaded portion.Described forward and backward reinforcement depth of beam is identical with anchor depth of beam.It is several that described steel is carved plate.Described steel strand are several.Described perpendicularly fix beam and horizontal Gu Liang is i iron.
Said structure design has reached the purpose of this utility model.
The utility model not only can provide effectively fixing to the two ends of weight cable, and can effectively to the length of each weight cable, adjust at any time, has simple in structure, flexible operation, job safety is convenient, and result of use is good, speed of application is fast, efficiency height and the measured advantage of matter.
The utility model is applicable to the adjustment of the bridge sling of single Suo Li between 20~100 tons.Construction practices shows: the utility model millions of units of reducing expenses, can effectively to the length of each weight cable, adjust at any time, reduce constructor more than 8 times, and major quality controlling index all meet related request, device assembles is easy, simple to operate strong with working security.
Accompanying drawing explanation
Fig. 1 is enforcement status architecture schematic diagram of the present utility model.
Fig. 2 is anchor beam structural representation of the present utility model.
Fig. 3 is the structural representation of looking up of Fig. 2.
Fig. 4 is the A-A cross-sectional view of Fig. 3.。
Fig. 5 is enforcement state partial structurtes principle schematic of the present utility model.
Fig. 6 is that weight cable anchor beam of the present utility model is adjusted structural principle schematic diagram.
Fig. 7 is the structural principle schematic diagram of hydraulic adjustment device of the present utility model.
Specific embodiments
As shown in Figures 1 to 7, a kind of Large scale cable crane track cable group anchor device, is moved and is drawn fixed structure to be formed by supporting structure, weight cable group anchor beam structure, weight cable anchor beam adjustment structure and anchor beam.Wherein:
As shown in Figures 1 to 6, supporting structure, for supporting and fixedly weight cable group anchor beam structure, weight cable anchor beam are adjusted structure and anchor beam and moved and draw fixed structure.By perpendicular, fix beam 12 and horizontal solid beam 13 is formed.Supporting structure is positioned at the front portion of cement bank base 15.Side by side and be the sides of affixed horizontal Gu Liang between two of the spacing distance setting perpendicular upper ends that fix beam, the opposite side of horizontal Gu Liang is also fixed in other two perpendicular fixing between the upper end of beam, and each perpendicular lower end that fixes beam is installed in cement bank base.Because weight cable group anchor beam structure, weight cable anchor beam adjustment structure and anchor beam move, draw fixed structure to be 2 identical structures, lay respectively at the both ends of horizontal Gu Liang, therefore only the said structure of a side is described, opposite side is corresponding to be arranged, therefore be not repeated.
As shown in Figures 1 to 5, weight cable group anchor beam structure 14, for fixing the termination of each weight cable, is consisted of anchor beam 4, semi-circular saddle 6.Two weight cable group anchor beam structures lay respectively at the both ends of horizontal Gu Liang.The front end face middle part of anchor beam is provided with front stiffening girder 3, and the rear end face middle part of anchor beam is provided with rear stiffening girder 9.Forward and backward stiffening girder is for strengthening the bulk strength of anchor beam.The middle part of forward and backward stiffening girder and anchor beam is provided with and connects through wires hole 16.The both sides of stiffening girder after two semi-circular saddles lay respectively on the anchor beam of one end.The termination of each weight cable 2 fixing winding forming that unrolls is set on anchor beam and horizontal Gu Liang and semi-circular saddle, that is: unrolled in the two ends of each weight cable and use locked this termination of cable snap close 1 in the place of unrolling, make the two ends of weight cable form winding, winding is set on anchor beam and horizontal Gu Liang and semi-circular saddle.
As shown in Figure 6, weight cable anchor beam is adjusted structure, for carrying out length adjustment to being set in structural each weight cable of weight cable group anchor beam.By enter to carve groove 5 and the steel that are positioned at semi-circular saddle outside, carve plate 19 and formed.One end that steel is carved plate is tip end, and the height of plate carved by steel and the aspect ratio of semi-circular saddle is 0.7: 1, and the length that steel is carved plate is greater than the length of semi-circular saddle.When steel is carved plate and is inserted between semi-circular saddle outside and corresponding anchor beam face.It is several that described steel is carved plate.When needing the length of each weight cable of inching, several steel are carved to plate (stack, need each to be inserted into respectively) tip end aim at into carving groove and be inserted into respectively the gap between horizontal Gu Liang and semi-circular saddle, both are widened distance, after making to be set in each weight cable winding on anchor beam and horizontal Gu Liang and semi-circular saddle, move, thereby complete the length of adjusting each weight cable.
As shown in Fig. 5 and Fig. 7, anchor beam moves and draws fixed structure, for moving, draws fixing rack structure and weight cable group anchor beam structure.By front anchor slab 11, rear anchor slab 17, steel strand 8, put spool 7 and steel tapered anchor bolt 10 is formed.Forward and backward anchor slab is provided with the cable-through hole passing for steel strand termination, and a steel strand termination is through a cable-through hole.Front anchor slab is positioned at the front end of the perforation through wires hole on front stiffening girder, and the inner peripheral portion card of front anchor slab withstands on the front stiffening girder in cable-through hole outside.Put the cement bank base that spool is positioned at the perforation through wires hole position on corresponding rear stiffening girder.The spool outside of putting of the cement bank base of rear side is provided with rear anchor slab, and the inner peripheral portion card of rear anchor slab withstands on the cement bank base of putting spool outside.One termination of several steel strand through putting spool, connect through wires hole and be connected with steel tapered anchor bolt with after each cable-through hole on front anchor slab, another termination of several steel strand is connected the rear steel crab-bolt 18 of using of adjustment through each cable-through hole on rear anchor slab and fixes with hydraulic adjustment device.
Described hydraulic adjustment device is comprised of body 25 and two hydraulic cylinders 26.Body is one certain thickness and withstand voltage pressure-bearing steel plate, and two hydraulic cylinders are fixed on body two ends, and body middle part is provided with the piston rod 20 of putting line hole 22, two hydraulic cylinders and ejects to a side.Oil-in 24 on two hydraulic cylinders communicates with the force feed outlet of oil pump by pump inlet pipe, and the oil return opening 27 of two hydraulic cylinders is answered back and communicated with the force feed of oil pump by oil pump oil return pipe.
The termination of described steel strand is threaded portion 81.Described forward and backward reinforcement depth of beam is identical with anchor depth of beam.It is several that described steel is carved plate.Described steel strand are several.Described perpendicularly fix beam and horizontal Gu Liang is i iron.
During construction, one termination of several steel strand is through putting spool, connecting after each cable-through hole on through wires hole and front anchor slab, with steel tapered anchor bolt, connect respectively, another termination of several steel strand is connected adjustment through each cable-through hole on rear anchor slab with hydraulic adjustment device rear fixing by steel crab-bolt 18.Above-mentioned anchor beam moves to draw fixed structure to form fixing rack structure, weight cable group anchor beam structure and weight cable anchor beam are adjusted to moving of structure and draws fixing.The termination of each weight cable fixing winding forming that unrolls is set on anchor beam and horizontal Gu Liang and semi-circular saddle, forms fixing to each weight cable.
While if desired adjusting the length of each weight cable, available hydraulic adjusting device carries out.Hydraulic adjustment device can be several, and the line hole of putting of each hydraulic adjustment device is passed behind the termination of steel strand, puts successively pad card 23 and screws on and adjust holding nut 21.The top of two-piston bar holds on rear anchor slab, then opens hydraulic oil pump, and the piston rod of two hydraulic cylinders ejects, drive body moves up, each moving range length 10~18cm, and simultaneously drive anchor beam to move backward, completes by the length adjustment of each weight cable.After each weight cable is adjusted to the right place, tighten steel crab-bolt and fix it on rear anchor slab.
Obviously, after first making the piston rod of two hydraulic cylinders eject, manually as required steel crab-bolt is loosened after certain length, make again hydraulic piston rod fall after rise, carry out also can the lengthen length of each weight cable of reverse operating, complete after length adjustment, tighten steel crab-bolt and fix it on rear anchor slab.Therefore be not repeated.
If desired during the length of each weight cable of inching, the tip end that several steel are carved to plate is aimed at into carving groove and is inserted into respectively the gap between horizontal Gu Liang and semi-circular saddle, both are widened distance, make to be set on anchor beam and horizontal Gu Liang and semi-circular saddle and move after winding, thereby complete the length of each weight cable of inching (scope length 5~8cm).
In a word, the utility model not only can provide effectively fixing to the two ends of weight cable, and can effectively to the length of each weight cable, adjust at any time, have simple in structure, flexible operation, job safety is convenient, result of use is good, speed of application is fast, and efficiency height and the measured advantage of matter, can promote the use of.

Claims (7)

1. a Large scale cable crane track cable group anchor device, is moved and is drawn fixed structure to be formed by supporting structure, weight cable group anchor beam structure, weight cable anchor beam adjustment structure and anchor beam, it is characterized in that, wherein:
Supporting structure, for supporting and fixedly weight cable group anchor beam structure, weight cable anchor beam are adjusted structure and anchor beam and moved and draw fixed structure, by perpendicular, fix beam and horizontal solid beam is formed, supporting structure is positioned at the front portion of cement bank base, side by side and be the sides of affixed horizontal Gu Liang between two of the spacing distance setting perpendicular upper ends that fix beam, the opposite side of horizontal Gu Liang is also fixed in other two perpendicular fixing between the upper end of beam, and each perpendicular lower end that fixes beam is installed in cement bank base;
Weight cable group anchor beam structure, for fixing the termination of each weight cable, by anchor beam, semi-circular saddle, formed, two weight cable group anchor beam structures lay respectively at the both ends of horizontal Gu Liang, the front end face middle part of anchor beam is provided with front stiffening girder, the rear end face middle part of anchor beam is provided with rear stiffening girder, the middle part of forward and backward stiffening girder and anchor beam is provided with perforation through wires hole, the both sides of stiffening girder after two semi-circular saddles lay respectively on the anchor beam of one end, the termination of each weight cable fixing winding forming that unrolls is set on anchor beam and horizontal Gu Liang and semi-circular saddle;
Weight cable anchor beam is adjusted structure, for carrying out length adjustment to being set in structural each weight cable of weight cable group anchor beam, by enter to carve groove and the steel that are positioned at semi-circular saddle outside, carve plate and formed, one end that steel is carved plate is tip end, the height of plate carved by steel and the aspect ratio of semi-circular saddle is 0.7: 1, the length that steel is carved plate is greater than the length of semi-circular saddle, when steel is carved plate and is inserted between semi-circular saddle outside and corresponding anchor beam face;
Anchor beam moves and draws fixed structure, be used for moving and draw fixing rack structure and weight cable group anchor beam structure, by front anchor slab, rear anchor slab, steel strand, put spool and steel tapered anchor bolt forms, before, rear anchor slab is provided with the cable-through hole passing for steel strand termination, front anchor slab is positioned at the front end of the perforation through wires hole on front stiffening girder, put the cement bank base that spool is positioned at the perforation through wires hole position on corresponding rear stiffening girder, the spool outside of putting of the cement bank base of rear side is provided with rear anchor slab, one termination of several steel strand is through putting spool, connecting through wires hole is connected with steel tapered anchor bolt with after each cable-through hole on front anchor slab, another termination of several steel strand is fixed by steel crab-bolt after being connected adjustment with hydraulic adjustment device through each cable-through hole on rear anchor slab.
2. by a kind of Large scale cable crane track cable group anchor device claimed in claim 1, it is characterized in that: described hydraulic adjustment device is comprised of body and two hydraulic cylinders, body is a pressure-bearing steel plate, two hydraulic cylinders are fixed on body two ends, body middle part is provided with puts line hole, and the piston rod of two hydraulic cylinders ejects to a side.
3. by a kind of Large scale cable crane track cable group anchor device claimed in claim 1, it is characterized in that: the termination of described steel strand is threaded portion.
4. by a kind of Large scale cable crane track cable group anchor device claimed in claim 1, it is characterized in that: described forward and backward reinforcement depth of beam is identical with anchor depth of beam.
5. by a kind of Large scale cable crane track cable group anchor device claimed in claim 1, it is characterized in that: it is several that described steel is carved plate.
6. by a kind of Large scale cable crane track cable group anchor device claimed in claim 1, it is characterized in that: described steel strand are several.
7. by a kind of Large scale cable crane track cable group anchor device claimed in claim 1, it is characterized in that: described perpendicularly fix beam and horizontal Gu Liang is i iron.
CN201420147332.8U 2014-03-27 2014-03-27 Bearing cable anchor group device of large cable crane Withdrawn - After Issue CN203782567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420147332.8U CN203782567U (en) 2014-03-27 2014-03-27 Bearing cable anchor group device of large cable crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420147332.8U CN203782567U (en) 2014-03-27 2014-03-27 Bearing cable anchor group device of large cable crane

Publications (1)

Publication Number Publication Date
CN203782567U true CN203782567U (en) 2014-08-20

Family

ID=51318770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420147332.8U Withdrawn - After Issue CN203782567U (en) 2014-03-27 2014-03-27 Bearing cable anchor group device of large cable crane

Country Status (1)

Country Link
CN (1) CN203782567U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866691A (en) * 2014-03-27 2014-06-18 中交一公局第一工程有限公司 Anchor group device of large-sized cable hoisting system track cables
CN106939556A (en) * 2017-05-05 2017-07-11 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866691A (en) * 2014-03-27 2014-06-18 中交一公局第一工程有限公司 Anchor group device of large-sized cable hoisting system track cables
CN103866691B (en) * 2014-03-27 2015-09-09 中交一公局第一工程有限公司 A kind of Large scale cable crane track cable group anchor device
CN106939556A (en) * 2017-05-05 2017-07-11 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment
CN106939556B (en) * 2017-05-05 2019-01-18 贵州大学 A kind of arch bridge cable-hoisting construction stayed knotting method knotted rope tensioning equipment

Similar Documents

Publication Publication Date Title
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN201826525U (en) Climbing shuttering system device for buildings
CN102094389A (en) Separable large-section truss girder hydraulic lifting device
CN204080652U (en) Pre-stressed bridge deflection adjusting device and pre-stressed bridge thereof
CN201546436U (en) Platform for construction of high-altitude suspension structures
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN202787668U (en) Rear bolt anchoring system for cantilever steel I-beam
CN203782567U (en) Bearing cable anchor group device of large cable crane
CN103866691B (en) A kind of Large scale cable crane track cable group anchor device
CN209760863U (en) External prestress steel strand connector and matched tensioning device
CN203653080U (en) Mooring rope hanging mechanism capable of meeting motion of portal crane
CN101314937B (en) Construction method and apparatus of vertically rotating arch case downside
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN203924656U (en) A kind of high-altitude overlength cable-stayed type shaped steel job platform structure
CN202610713U (en) Pull cable force converting device of bidirectional locking type static steel strand
CN204079226U (en) A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts
CN205314566U (en) Cone makes up wall screw
CN203782575U (en) Stay cable hanging and tension construction device
CN104110100A (en) Steel bar clip pre-stress tensioning anchor block
CN203684109U (en) Device for adjusting sling force and elevation of sling of suspension bridge
CN203846407U (en) Fast-splicing type large-span bridge detecting and reinforcing operation platform
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN203559334U (en) Reinforcing structure for suspended carrying part of aluminum alloy overhead bridge escalator
CN202338106U (en) Wall-body hoisting ring of cantilever discharging platform
CN207582319U (en) A kind of pre-stressed bridge deflection adjusting device based on municipal bridge field

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140820

Effective date of abandoning: 20150909

RGAV Abandon patent right to avoid regrant