CN203768882U - Water diversion system for long distance diversion-type hydropower station in severe cold area - Google Patents

Water diversion system for long distance diversion-type hydropower station in severe cold area Download PDF

Info

Publication number
CN203768882U
CN203768882U CN201420163964.3U CN201420163964U CN203768882U CN 203768882 U CN203768882 U CN 203768882U CN 201420163964 U CN201420163964 U CN 201420163964U CN 203768882 U CN203768882 U CN 203768882U
Authority
CN
China
Prior art keywords
water
gate
diversion
channel
water diversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420163964.3U
Other languages
Chinese (zh)
Inventor
刘万新
林元旦
马喜祥
张秀崧
白素萍
武帅
朱涛
范瑞朋
任堂
孙博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201420163964.3U priority Critical patent/CN203768882U/en
Application granted granted Critical
Publication of CN203768882U publication Critical patent/CN203768882U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model discloses a water diversion system for a long distance diversion-type hydropower station in a severe cold area. The water diversion system comprises a water diversion gate which is arranged on the frontmost portion of a water diversion channel and used for collecting water from a reservoir, a water inlet gate which is used for leading channel water into a generator set for generating electricity, a bottom hole gate which is used for draining the waste water except electricity generation water into a downstream river channel, and a flood discharge bottom hole. A plurality of damming gates which have the function of water-level control and the function of ice cover stability maintenance are arranged between the water diversion gate and the water inlet gate according to certain intervals. The space between the water diversion gate and the adjacent damming gate, the space between every two adjacent damming gates, and the space between the water inlet gate and the adjacent damming gate are all 4-6 km. When the water diversion system is used in winter, an ice cover is formed on the water diversion channel of the hydropower station, electricity generation water flow is conveyed under the ice cover, and the water flow directly flows to a hydropower station front pool and enters the generator set. According to the water diversion system, the damming gates are arranged on the water diversion channel, icing cover operation of the channel is achieved, compared with a traditional ice conveying operation mode, water used for ice discharging is saved, more diversion water can be used for generating electricity, the utilization rate of water power is improved, and the economic benefits of the hydropower station are increased.

Description

A kind of diversion system for long distance water diversion formula power station, severe cold area
Technical field
The utility model relates to a kind of diversion system, specifically, is the diversion system in long distance water diversion formula power station, a kind of severe cold area.
Background technology
The diversion system in long distance water diversion formula power station generally include be arranged in the top water-drawing gate from reservoir water intaking of water-drawing channel, by channel water introduce the intake gate of generating set generating, by bottom gate and the flood discharge bottom outlet that water leaks into downstream river course of abandoning meeting beyond generating water.Because the distance between water-drawing gate and intake gate is very long, water just can flow to generating set through long time in channel, and water surface directly contacts with cold air for a long time, affected by temperature very large.In severe cold area, in the water-drawing channel in water channeling type power station, will freeze, ice enters the wearing and tearing that the hydraulic turbine can be accelerated the hydraulic turbine.When serious, a large amount of ice cubes can stop up water inlet, cause diversion difficulty, and unit, by forced-stopping machine, also can lead to a disaster not in time if processed.
Impact for fear of ice cube on generating, traditional method is to take to sacrifice a part of water yield ice cube is discharged to Channel of Downstream.In the winter time, originally river course come the water yield just less, add the part water yield and be used to arrange ice, this certainly will cause the water yield for generating electricity to reduce, thereby reduces the generated energy in power station, reduces its power benefit.
Utility model content
Technical problem to be solved in the utility model is, a kind of channel lid operation of freezing that realizes is provided, and can make the diversion system for severe cold area long distance water diversion formula power station of more diversion for generating electricity.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of diversion system for long distance water diversion formula power station, severe cold area, comprise be arranged in the top water-drawing gate from reservoir water intaking of water-drawing channel, by channel water introduce the intake gate of generating set generating, by bottom gate and the flood discharge bottom outlet that water leaks into downstream river course of abandoning meeting beyond generating water, on the water-drawing channel between water-drawing gate and intake gate according to a plurality of locks of choking water of controlling water level, maintaining ice sheet stabilization that play of certain pitch arrangement.
Described water-drawing gate and the adjacent spacing between lock, adjacent two of choking water are choked water spacing between lock, intake gate and the adjacent spacing of choking water between lock is 4~6km.
Described two adjacent spacing of choking water between lock are identical.
The beneficial effects of the utility model are: during cold-weather operation, can on water-drawing channel, form ice sheet, generating current are carried under ice sheet, flow directly to forebay generating, more traditional defeated ice method of operation has been saved row's ice water, can make more water for generating, improve the utilization rate of water energy, increase the economic benefit in power station.
Accompanying drawing explanation
Fig. 1 is the diversion system structural representation for long distance water diversion formula power station, severe cold area of the present utility model;
Fig. 2 is the elevation of choking water lock.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As shown in Figure 1, 2, the utility model is for the diversion system in long distance water diversion formula power station, severe cold area, and water-drawing gate 1 is arranged in power station water-drawing channel 8 foremost, adjusts the size of diversion flow by the aperture of headstock gear 16 regulating gates 15, control diversion flow, keep ice face in channel to stablize.
Intake gate 3 is arranged in power station water inlet, introduces the flow that generating set needs, and by headstock gear 26 closed shutters 25, blocks flow, for generator and hydraulic turbine maintenance.
Earial drainage bottom outlet 4 is also arranged in power station water inlet, and by headstock gear 26, regulates the aperture of bottom gate 7, and the water of abandoning meeting outside generating set water is leaked into Channel of Downstream.
A plurality of locks 2 of choking water are arranged on water-drawing channel 8 uniformly, and water-drawing gate 1 and the adjacent spacing between lock 2, adjacent two of choking water are choked water spacing between lock, intake gate 3 and the adjacent its spacing between lock 2 of choking water is 4~6km.By the aperture of headstock gear 6 regulating gates 5, make canal water depth stable.
Described water-drawing gate 1 is arranged in water-drawing channel 8 foremost, in the winter time by the aperture of headstock gear 16 regulating gates 15, controls diversion flow, keeps ice face in channel to stablize.
Described many structural configuration of choking water lock 2 are identical, and its headstock gear 6 is slow-motion hoist, and the lifting precision that makes gate 5 is Centimeter Level.
The bottom gate 7 of described earial drainage bottom outlet 4, regulates by headstock gear 26, controls its aperture, regulates letdown flow, maintains the stable of ice sheet.
Above-mentioned headstock gear is slow-motion hoist, can realize the fine setting of gatage.
When described system is used in the winter time, from back to front, the every 5cm of aperture is one grade to its many opening sequences of choking water lock 2, after the interior depth of water of water-drawing channel 8 is stable, carries out the operation of next stage again.
The building of described system and equipment will carry out combined dispatching trial run after construction, check water-drawing gate 1, choke water the headstock gear operating condition of lock 2, intake gate 3 and earial drainage bottom outlet 4, check the control accuracy of control appliance, make system call safety, stable, after acceptance(check), can come into operation.
Below use procedure of the present utility model is described:
1, owned building and equipment, after construction completes, all pass through field adjustable, after acceptance(check), can come into operation.
2,, after these system and device Installation and Debugging complete, daily mean temperature was stabilized in 0 and came into operation when following local winter.
3, in using, the opening speed of strict regulating gate, every grade of falling head is controlled at and is less than 5cm.After channel stable level, carrying out next stage operation;
4, in using, strengthen observing the variation of ice face in water-drawing channel, adjust in time the aperture of gate, make ice sheet stable.
5, temperature raises and channel freezes after thawing, chokes water the utilization of lock in can halt system.
6, after stopping using, stop up water gate and all leave the water, overhaul, safeguard, when arrive winter, again come into operation.
Certain water channeling type power station, channel length 25km, channel bottom width is 4m, and side slope is 1:1.75, and at the bottom of canal, longitudinal gradient 1/2500, on channel, arranges and chokes water 4, lock, and the distance between adjacent lock is 5km.
Winter is during system employs, channel water diversion 20m3/s, and canal water depth is stabilized in 5.20m, and canal cross section Buddhist is less than 0.1 as total, and mean velocity in section is less than 0.5m/s.
From the situation of cold-weather operation, monthly average generated energy is 2.3 times of traditional defeated ice method of operation, remarkable in economical benefits.
Above-described embodiment is only for illustrating technological thought of the present utility model and feature, its object is to make those skilled in the art can understand content of the present utility model and implement according to this, can not only with the present embodiment, limit the scope of the claims of the present utility model, be equal variation or the modification that spirit that all the utility model disclose is done, still drop in the scope of the claims of the present utility model.

Claims (3)

1. the diversion system for long distance water diversion formula power station, severe cold area, comprise be arranged in the top water-drawing gate (1) from reservoir water intaking of water-drawing channel, by channel water introduce the intake gate (3) of generating set generating, by bottom gate (7) and the flood discharge bottom outlet (4) that water leaks into downstream river course of abandoning meeting beyond generating water, it is characterized in that, water-drawing channel (8) between water-drawing gate (1) and intake gate (3) upper according to certain pitch arrangement a plurality of play control water level, maintain ice sheet stabilization choke water lock (2).
2. the diversion system for long distance water diversion formula power station, severe cold area according to claim 1, it is characterized in that, described water-drawing gate (1) and the adjacent spacing between lock (2), adjacent two of choking water are choked water spacing between lock (2), intake gate (3) and the adjacent spacing of choking water between lock (2) is 4~6km.
3. the diversion system for long distance water diversion formula power station, severe cold area according to claim 1, is characterized in that, described two adjacent spacing of choking water between lock (2) are identical.
CN201420163964.3U 2014-04-04 2014-04-04 Water diversion system for long distance diversion-type hydropower station in severe cold area Expired - Lifetime CN203768882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420163964.3U CN203768882U (en) 2014-04-04 2014-04-04 Water diversion system for long distance diversion-type hydropower station in severe cold area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420163964.3U CN203768882U (en) 2014-04-04 2014-04-04 Water diversion system for long distance diversion-type hydropower station in severe cold area

Publications (1)

Publication Number Publication Date
CN203768882U true CN203768882U (en) 2014-08-13

Family

ID=51286089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420163964.3U Expired - Lifetime CN203768882U (en) 2014-04-04 2014-04-04 Water diversion system for long distance diversion-type hydropower station in severe cold area

Country Status (1)

Country Link
CN (1) CN203768882U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898883A (en) * 2014-04-04 2014-07-02 中水北方勘测设计研究有限责任公司 Water diversion system for long-distance water diversion type hydropower station in severe cold region
CN109629521A (en) * 2019-01-22 2019-04-16 天津大学 A kind of artificial flexible heat-insulating ice sheet device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898883A (en) * 2014-04-04 2014-07-02 中水北方勘测设计研究有限责任公司 Water diversion system for long-distance water diversion type hydropower station in severe cold region
CN109629521A (en) * 2019-01-22 2019-04-16 天津大学 A kind of artificial flexible heat-insulating ice sheet device

Similar Documents

Publication Publication Date Title
CN108797526A (en) Multifunctional ecological for extra-high rock-fill dams is for water hole arrangement
CN106368185A (en) Hydropower station water inlet gallery desilting system and method
CN110904919B (en) Administer device of small-size river course absolutely kouxia creek
WO2012177182A9 (en) Diversion hydropower plant cascade
CN203768882U (en) Water diversion system for long distance diversion-type hydropower station in severe cold area
CN105386426B (en) The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape
CN103898883A (en) Water diversion system for long-distance water diversion type hydropower station in severe cold region
CN106284240A (en) A kind of power station is in construction time downstream interim water-supply structure and method
CN103938592B (en) Sediment trapping bank is offered tap hole and carries out the method shunted of damming
CN102400452B (en) Dirt preventing facility and construction method thereof
CN105568939A (en) Stopping device for water getting in hydropower station
CN105257454A (en) Diversion type vortex flow power generation system
CN202090383U (en) Double-vertical shaft gate-controlled type surface-layer water getting facility
CN204753696U (en) Water intaking structure for mountain channel
CN109853492B (en) Gate valve pipeline type fish passing method
EP1497502A1 (en) A system for generating power
CN117513260A (en) Drainage structure combining diversion tunnel, drainage tunnel and vertical shaft type flood drainage tunnel
CN202440787U (en) Riverway diversion device
CN206143743U (en) Husky corridor system is arranged to power station water inlet
CN109853493B (en) Pump valve pipeline type fish passing method
CN111801468A (en) Power generation ecological flood control system
CN105317027A (en) Combined type flood discharge and water taking method and structure thereof
CN209443447U (en) A kind of cold district water channeling type power station forebay ice discharging system
CN104612117A (en) Automatic ice breaking device using solar energy
CN203755253U (en) Sand blocking and water taking gate for water conservancy project

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xi Yanlin

Inventor after: Ren Tang

Inventor after: Sun Bo

Inventor after: Lin Yuandan

Inventor after: Liu Wanxin

Inventor after: Ma Xixiang

Inventor after: Zhang Xiusong

Inventor after: Bai Suping

Inventor after: Wu Shuai

Inventor after: Zhu Tao

Inventor after: Fan Ruipeng

Inventor before: Liu Wanxin

Inventor before: Sun Bo

Inventor before: Lin Yuandan

Inventor before: Ma Xixiang

Inventor before: Zhang Xiusong

Inventor before: Bai Suping

Inventor before: Wu Shuai

Inventor before: Zhu Tao

Inventor before: Fan Ruipeng

Inventor before: Ren Tang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU WANXIN LIN YUANDAN MA XIXIANG ZHANG XIUSONG BAI SUPING WU SHUAI ZHU TAO FAN RUIPENG REN TANG SUN BO TO: XI YANLIN LIN YUANDAN LIU WANXIN MA XIXIANG ZHANG XIUSONG BAI SUPING WU SHUAI ZHU TAO FAN RUIPENG REN TANG SUN BO

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140813