CN203755670U - Overhanging fire control corridor supporting structure - Google Patents
Overhanging fire control corridor supporting structure Download PDFInfo
- Publication number
- CN203755670U CN203755670U CN201420087135.1U CN201420087135U CN203755670U CN 203755670 U CN203755670 U CN 203755670U CN 201420087135 U CN201420087135 U CN 201420087135U CN 203755670 U CN203755670 U CN 203755670U
- Authority
- CN
- China
- Prior art keywords
- iron
- encorbelmenting
- overhanging
- beams
- fire control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 118
- 229910052742 iron Inorganic materials 0.000 claims description 56
- 238000009415 formwork Methods 0.000 abstract 3
- 238000009435 building construction Methods 0.000 abstract 1
- 238000009416 shuttering Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model belongs to building construction supporting structures, and particularly relates to an overhanging fire control corridor supporting structure. The problem that when a fire control corridor is not attached to a building, a conventional overhanging I-beam can not be used for supporting a formwork is solved. The overhanging fire control corridor supporting structure comprises a plurality of overhanging I-beams, and the ends of the I-beams are fixed by a round steel pressing ring embedded in a body. The overhanging I-beams comprise long overhanging I-beams and short overhanging I-beams, simple I-beams which are perpendicular to the overhanging I-beams are welded and fixed on the upper sides of the long overhanging I-beams, and the two ends of the simple I-beams are welded and fixed. The overhanging fire control corridor supporting structure is simple in structure and capable of meeting the demand of a fire control corridor formwork supporting system with a large overhanging distance, and achieves the purpose that the formwork supporting system meets the bearing force requirement of a fire control corridor.
Description
Technical field
The utility model belongs to building operations braced structures, specifically the one fire-fighting vestibule braced structures of encorbelmenting.
Background technology
Fire-fighting vestibule generally can be set in high level and super highrise building to meet fire protection requirement, fire-fighting vestibule can be close to building form bracing system conventionally, and cantilever span is less.Some engineering fire-fighting vestibule is not close to building, and the maximum distance of encorbelmenting is larger, can not simply rely on the routine i iron of encorbelmenting to carry out shuttering supporting.
Summary of the invention
When the utility model is not close to building in order to solve fire-fighting vestibule, the routine i iron of encorbelmenting cannot carry out the problem of shuttering supporting, and the one fire-fighting vestibule braced structures of encorbelmenting is provided.
The utility model is taked following technical scheme: the one fire-fighting vestibule braced structures of encorbelmenting, comprise the some i iron of encorbelmenting, the some i iron ends of encorbelmenting are fixed by the round steel pressure ring being embedded in main body, the i iron of encorbelmenting comprises long encorbelment i iron and the short i iron of encorbelmenting, wherein the long i iron upside of encorbelmenting is welded with the simple and easy i iron vertical with the i iron of encorbelmenting, and simple and easy i iron two ends are welded and fixed.
Described simple and easy i iron has 2, and 2 simple and easy i iron stack and weld together.
On the every described i iron of encorbelmenting, there are 3 for fixing round steel pressure ring.
Described round steel pressure ring is U-shaped, and round steel pressure ring downside is embedded in concrete, and the U-shaped pin place of round steel pressure ring upside is fixed on compressing tablet by nut, and the i iron of encorbelmenting is arranged in round steel pressure ring and compressing tablet.
Compared with prior art, the utility model is simple in structure, meets the fire-fighting vestibule form bracing system of the distance of encorbelmenting more greatly, has reached form bracing system and has met the completely object of fire-fighting vestibule requirement for bearing capacity.
Brief description of the drawings
Fig. 1 is the utility model structure chart;
Fig. 2 is that the utility model fire-fighting corridor construction completes plan view;
Fig. 3 is the utility model i iron end fixed structure schematic diagram of encorbelmenting;
The long i iron of encorbelmenting of 1-in figure, the simple and easy i iron of 2-, the short i iron of encorbelmenting of 3-, 4-round steel pressure ring, 5-compressing tablet.
Detailed description of the invention
As shown in Figure 1, 2, the one fire-fighting vestibule braced structures of encorbelmenting, comprise the some i iron of encorbelmenting, the some i iron ends of encorbelmenting are fixed by the round steel pressure ring 4 being embedded in main body, the i iron of encorbelmenting comprises long encorbelment i iron 1 and the short i iron 3 of encorbelmenting, wherein long i iron 1 upside of encorbelmenting is welded with the simple and easy i iron 2 vertical with the i iron of encorbelmenting, and simple and easy i iron 2 two ends are welded and fixed.
Described simple and easy i iron 2 has 2, and 2 simple and easy i iron 2 stack and weld together.
On the every described i iron of encorbelmenting, there are 3 for fixing round steel pressure ring 4.
Described round steel pressure ring 4 is U-shaped, and round steel pressure ring 4 downsides are embedded in concrete, and the U-shaped pin place of round steel pressure ring 4 upsides is fixed on compressing tablet 5 by nut, and the i iron of encorbelmenting is arranged in round steel pressure ring 4 and compressing tablet 5.
The utility model concrete operating procedure in engineering is as follows:
In completed substructure, set up freely-supported i iron, select 2 20# freely-supported i iron to stack setting, and i iron is carried out to welding procedure, guarantee that two i iron connect into entirety, utilize tower crane that i iron is winched to and sets up floor and be positioned over staircase with indoor absolute altitude place, two end bearing places and structure reinforcing bars are welded into entirety to ensure its stability.
The long i iron and freely-supported i iron is welded and fixed and both sides steel bar end is welded and fixed of encorbelmenting, the short i iron of encorbelmenting is directly encorbelmented.The i iron end dependence of encorbelmenting has been embedded in main body San road round steel pressure ring and has fixed.Reduce the cantilever span of the i iron of encorbelmenting, met support system load requirement.
Welded reinforcement short column on the i iron of encorbelmenting of installing, guarantee that every frame pipe is all inserted in this reinforcing bar short column to ensure the stability of scaffold system, thereby make whole i-beam structure form a stable shuttering supporting basis, on this, carry out the supporting template system construction of fire-fighting vestibule.
Claims (4)
1. the fire-fighting vestibule braced structures of encorbelmenting, comprise the some i iron of encorbelmenting, it is characterized in that: the some i iron ends of encorbelmenting are fixed by the round steel pressure ring (4) being embedded in main body, the i iron of encorbelmenting comprises long encorbelment i iron (1) and the short i iron of encorbelmenting (3), wherein long i iron (1) upside of encorbelmenting is welded with the simple and easy i iron (2) vertical with the i iron of encorbelmenting, and simple and easy i iron (2) two ends are welded and fixed.
2. the fire-fighting vestibule braced structures of encorbelmenting according to claim 1, is characterized in that: described simple and easy i iron (2) has 2, and 2 simple and easy i iron (2) stack and weld together.
3. the fire-fighting vestibule braced structures of encorbelmenting according to claim 1, is characterized in that: on the every described i iron of encorbelmenting, have 3 for fixing round steel pressure ring (4).
4. the fire-fighting vestibule braced structures of encorbelmenting according to claim 1, it is characterized in that: described round steel pressure ring (4) is for U-shaped, round steel pressure ring (4) downside is embedded in concrete, it is upper that the U-shaped pin place of round steel pressure ring (4) upside is fixed on compressing tablet (5) by nut, and the i iron of encorbelmenting is arranged in round steel pressure ring (4) and compressing tablet (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420087135.1U CN203755670U (en) | 2014-02-28 | 2014-02-28 | Overhanging fire control corridor supporting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420087135.1U CN203755670U (en) | 2014-02-28 | 2014-02-28 | Overhanging fire control corridor supporting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203755670U true CN203755670U (en) | 2014-08-06 |
Family
ID=51250960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420087135.1U Expired - Lifetime CN203755670U (en) | 2014-02-28 | 2014-02-28 | Overhanging fire control corridor supporting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203755670U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088313A (en) * | 2016-06-23 | 2016-11-09 | 青岛海川建设集团有限公司 | Simply supported beam method is encorbelmented vestibule form bracing system construction technology |
CN111677259A (en) * | 2020-06-11 | 2020-09-18 | 北京城建十六建筑工程有限责任公司 | High-rise Bailey truss cantilever construction method |
-
2014
- 2014-02-28 CN CN201420087135.1U patent/CN203755670U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088313A (en) * | 2016-06-23 | 2016-11-09 | 青岛海川建设集团有限公司 | Simply supported beam method is encorbelmented vestibule form bracing system construction technology |
CN111677259A (en) * | 2020-06-11 | 2020-09-18 | 北京城建十六建筑工程有限责任公司 | High-rise Bailey truss cantilever construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203867216U (en) | Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate | |
CN102733606B (en) | The construction method of High Large Cantilever structure | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN202787926U (en) | Overhanging scaffold simple and convenient to disassemble and assemble | |
CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
CN203961281U (en) | Steel bar girder beam form frame and H section steel beam-cast-in-place concrete floor formwork system | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN203755670U (en) | Overhanging fire control corridor supporting structure | |
CN103206075A (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN201915631U (en) | High-altitude long-span reinforced concrete corridor construction supporting structure | |
CN213953189U (en) | Supporting device for ensuring smooth surface of lower cone shell of prefabricated water tank | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
CN203977840U (en) | A kind of high-altitude long-span strengthening concrete vestibule braced structures | |
CN103758342A (en) | Tool-type top form for buildings | |
CN104074275A (en) | Prefabricated concrete column connecting joint structure | |
CN204212385U (en) | Scaffold strengthened by truss | |
CN203334643U (en) | Tower crane standard knot and structural steel combination high-altitude large-span operation frame device | |
CN203891442U (en) | High-rise elevator shaft template supporting platform | |
CN203891218U (en) | Beam, plate and column intersection node in main excavation-for-cover station structure | |
CN203755451U (en) | Connecting device for dual-layer full-steel structure floor embedded with channel steel beam and column | |
CN205777531U (en) | Floor slab construction beam string shuttering supporting equipment | |
CN201915630U (en) | Combined platform of fire control joint gallery form supporting steel beam | |
CN103276889B (en) | Full hall fastener type steel pipe scaffold anti-side shifting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140806 |