CN203755319U - 破碎岩带边坡开挖准备结构 - Google Patents

破碎岩带边坡开挖准备结构 Download PDF

Info

Publication number
CN203755319U
CN203755319U CN201420114531.9U CN201420114531U CN203755319U CN 203755319 U CN203755319 U CN 203755319U CN 201420114531 U CN201420114531 U CN 201420114531U CN 203755319 U CN203755319 U CN 203755319U
Authority
CN
China
Prior art keywords
slope
excavation
pregrouting
hole
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420114531.9U
Other languages
English (en)
Inventor
唐忠敏
张公平
周钟
陈秋华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN201420114531.9U priority Critical patent/CN203755319U/zh
Application granted granted Critical
Publication of CN203755319U publication Critical patent/CN203755319U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本实用新型公开了一种边坡施工结构,尤其是一种破碎岩带边坡开挖准备结构。本实用新型提供了一种确保边坡开挖施工期稳定和安全问题的破碎岩带边坡开挖准备结构,包括待挖边坡,所述待挖边坡上设定有梯段开口线和边坡开挖线,还包括锚杆和预灌浆孔;所述预灌浆孔设置在待挖边坡的梯段开口线处,并沿边坡宽度方向设置有一排;所述锚杆插入在预灌浆孔内并通过灌浆固定。通过边坡开挖前的预灌浆,水泥浆液将会扩散到预灌浆孔周围一定范围,边坡开挖梯段内浅表层松弛破碎岩体得到固结,整体性有所加强,高陡边坡开挖体型将会有所保证。

Description

破碎岩带边坡开挖准备结构
技术领域
本实用新型涉及一种边坡施工结构,尤其是一种破碎岩带边坡开挖准备结构。
背景技术
随着我国西部大开发战略的不断深入,我国西部地区新建的基础设施也越来越多,许多建筑物(如水电站地面厂房、大坝等)都修建在地形陡峻、地质条件复杂的区域,因建筑物场地布置的需要,需要进行大规模的高陡边坡开挖,而这些开挖边坡常常又位于地质条件复杂、岩体风化、卸荷强烈的破碎岩带上,边坡开挖难度较大。
目前岩质边坡常采用预裂爆破、光面爆破的开挖技术,在破碎岩带边坡开挖爆破过程中及开挖完成后,由于设计开挖边坡体型高陡、边坡岩体松弛破碎,位于开挖梯段中上部的部分松散岩块(尤其是马道开口附近的岩块)可能局部失稳滑塌,影响边坡设计开挖体型整体美观,并且容易发生施工期安全问题。
实用新型内容
本实用新型所要解决的技术问题是提供一种确保边坡开挖施工期稳定和安全问题的破碎岩带边坡开挖准备结构。
本实用新型解决其技术问题所采用的破碎岩带边坡开挖准备结构,包括待挖边坡,所述待挖边坡上设定有梯段开口线和边坡开挖线,还包括锚杆和预灌浆孔;所述预灌浆孔设置在待挖边坡的梯段开口线处,并沿边坡宽度方向设置有一排;所述锚杆插入在预灌浆孔内并通过灌浆固定。
进一步的是,所述预灌浆孔朝向待挖边坡内的倾斜角度a为0~10°。
进一步的是,相邻两个预灌浆孔的间距为2.0~3.0m。
进一步的是,若预灌浆孔位于待挖边坡的马道高程,预灌浆孔距离马道外边缘0.5m;否则,预灌浆孔位于边坡开挖线外侧并距离边坡开挖线0.5m。
进一步的是,所述灌浆为低压灌浆,以此在预灌浆孔周围形成预固结灌浆带。
本实用新型的有益效果是:(1)通过边坡开挖前的预灌浆,水泥浆液将会扩散到预灌浆孔周围一定范围,边坡开挖梯段内浅表层松弛破碎岩体得到固结,整体性有所加强,高陡边坡开挖体型将会有所保证;(2)在预灌浆固结作用和马道内侧锚杆或锚杆束的锚固作用下,边坡开挖梯段中上部(尤其是马道开口附近)的松散岩块的稳定性将会有所提高,边坡开挖施工期的临时稳定和安全问题也能得到保证。
附图说明
图1是本实用新型的结构示意图;
图中零部件、部位及编号:原始地形线1、边坡开挖线2、马道3、梯段开口线4、预灌浆孔5、预固结灌浆带6、待开挖梯段7。
具体实施方式
下面结合附图对本实用新型作进一步说明。
如图1所示,本实用新型包括待挖边坡,所述待挖边坡上设定有梯段开口线4和边坡开挖线2,还包括锚杆和预灌浆孔5;所述预灌浆孔5设置在待挖边坡的梯段开口线4处,并沿边坡宽度方向设置有一排;所述锚杆插入在预灌浆孔5内并通过灌浆固定。边坡开挖是通过多个梯段依次进行开挖,如图1所示的待开挖梯段7,在待开挖梯段7开挖前,沿梯段开口线4钻设预灌浆孔5,预灌浆孔5朝向待挖边坡内的倾斜角度a推荐为0~10°,预灌浆孔5沿边坡宽度方向设置有一排以覆盖整个边坡,推荐相邻两个预灌浆孔5的间距为2.0~3.0m;然后在预灌浆孔5内插入锚杆或锚杆束;最后利用上述预灌浆孔,采用灌浆的方法,对设计开挖线附近边坡表层松散岩体进行预先固结灌浆。灌浆最好采用低压灌浆,水泥浆液将会扩散到一定范围形成预固结灌浆带6,待开挖梯段7内浅表层松弛破碎岩体得到一定的固结。
在边坡的马道3和非马道地段采用以下设置,若预灌浆孔5位于待挖边坡的马道3高程,预灌浆孔5距离马道3外边缘0.5m;否则,预灌浆孔5位于边坡开挖线2外侧并距离边坡开挖线0.5m。
预固结灌浆完成后,再进行边坡开挖施工。此时边坡开挖线2附近浅表层预固结灌浆带6的松散岩体已经得到固结,整体性有所加强,高陡边坡开挖体型将会有所保证。在预灌浆固结作用和马道3内侧锚杆或锚杆束锚固作用下,梯段内边坡开挖线2中上部的松散岩块的稳定性将会有所提高,边坡开挖施工期的临时稳定性和安全问题也能得到保证。

Claims (5)

1.破碎岩带边坡开挖准备结构,包括待挖边坡,所述待挖边坡上设定有梯段开口线(4)和边坡开挖线(2),其特征在于:还包括锚杆和预灌浆孔(5);所述预灌浆孔(5)设置在待挖边坡的梯段开口线(4)处,并沿边坡宽度方向设置有一排;所述锚杆插入在预灌浆孔(5)内并通过灌浆固定。
2.如权利要求1所述的破碎岩带边坡开挖准备结构,其特征在于:所述预灌浆孔(5)朝向待挖边坡内的倾斜角度a为0~10°。
3.如权利要求1所述的破碎岩带边坡开挖准备结构,其特征在于:相邻两个预灌浆孔(5)的间距为2.0~3.0m。
4.如权利要求1、2或3所述的破碎岩带边坡开挖准备结构,其特征在于:若预灌浆孔(5)位于待挖边坡的马道(3)高程,预灌浆孔(5)距离马道(3)外边缘0.5m;否则,预灌浆孔(5)位于边坡开挖线(2)外侧并距离边坡开挖线(2)0.5m。
5.如权利要求1所述的破碎岩带边坡开挖准备结构,其特征在于:所述灌浆为低压灌浆,以此在预灌浆孔(5)周围形成预固结灌浆带(6)。
CN201420114531.9U 2014-03-13 2014-03-13 破碎岩带边坡开挖准备结构 Expired - Lifetime CN203755319U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420114531.9U CN203755319U (zh) 2014-03-13 2014-03-13 破碎岩带边坡开挖准备结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420114531.9U CN203755319U (zh) 2014-03-13 2014-03-13 破碎岩带边坡开挖准备结构

Publications (1)

Publication Number Publication Date
CN203755319U true CN203755319U (zh) 2014-08-06

Family

ID=51250614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420114531.9U Expired - Lifetime CN203755319U (zh) 2014-03-13 2014-03-13 破碎岩带边坡开挖准备结构

Country Status (1)

Country Link
CN (1) CN203755319U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149631A (zh) * 2016-07-31 2016-11-23 中水东北勘测设计研究有限责任公司 高山窄谷拱坝崩塌型边坡处理方法
CN108035359A (zh) * 2017-12-27 2018-05-15 中国电建集团中南勘测设计研究院有限公司 一种边坡开挖方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149631A (zh) * 2016-07-31 2016-11-23 中水东北勘测设计研究有限责任公司 高山窄谷拱坝崩塌型边坡处理方法
CN106149631B (zh) * 2016-07-31 2018-06-12 中水东北勘测设计研究有限责任公司 高山窄谷拱坝崩塌型边坡处理方法
CN108035359A (zh) * 2017-12-27 2018-05-15 中国电建集团中南勘测设计研究院有限公司 一种边坡开挖方法

Similar Documents

Publication Publication Date Title
CN204418187U (zh) 地铁保护区域土钉墙结合双排桩深基坑复合支护结构
CN107975383B (zh) 地下洞室丁字型交叉口开挖支护施工方法
CN108005660A (zh) 一种高速公路隧道施工方法
CN203939034U (zh) 一种抗滑桩与锚索、锚固洞结合的边坡治理结构
CN204780764U (zh) 环境友好型生态带肋壁板式挡墙护岸
CN106351215A (zh) 一种风积沙隧道洞口拱型门框式旋喷桩支护的方法
CN201695407U (zh) 有盾构隧道下穿的地铁车站基坑围护结构
CN107575237A (zh) 一种暗挖法与盾构法相结合建造地铁车站的施工方法
CN104863588A (zh) 超前预设墩柱沿空留巷方法
CN203755319U (zh) 破碎岩带边坡开挖准备结构
CN106120822B (zh) 一种防止泥岩滑坡的支护方法及装置
CN106930768B (zh) 隧洞施工方法及应用
CN103243721B (zh) 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法
CN204492831U (zh) 地铁暗挖隧道横通道施工构件
CN203878532U (zh) 一种用于深层陡倾断层裂隙处理结构
CN104047607B (zh) 盾构机围护结构条件下吊出工法
CN204252119U (zh) X异型支护桩结构
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN102493436A (zh) 矩形抗滑桩人工掘进新工法
CN202830938U (zh) 一种控制基坑稳定性的支护结构
CN104405412B (zh) 地铁暗挖隧道横通道施工构件
CN104895008B (zh) 环境友好型生态带肋壁板式挡墙护岸的施工方法
CN204532367U (zh) 一种地下牛腿桩
CN204343297U (zh) 一种大体积混凝土中后浇筑梁预留孔洞处理的结构
CN204676570U (zh) 强卸荷发育边坡快速锁腰支护结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + R

Free format text: FORMER NAME: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

CP01 Change in the name or title of a patent holder

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee after: POWERCHINA Chengdu Engineering Co.,Ltd.

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Patentee before: HYDROCHINA CHENGDU ENGINEERING Corp.

GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140806