CN203741866U - Fixing frame structure for pre-buried screws in concrete foundation - Google Patents
Fixing frame structure for pre-buried screws in concrete foundation Download PDFInfo
- Publication number
- CN203741866U CN203741866U CN201320795764.5U CN201320795764U CN203741866U CN 203741866 U CN203741866 U CN 203741866U CN 201320795764 U CN201320795764 U CN 201320795764U CN 203741866 U CN203741866 U CN 203741866U
- Authority
- CN
- China
- Prior art keywords
- embedded
- steel plate
- embedded screw
- shaped steel
- screws
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种混凝土基础内预埋螺杆的固定架结构,涉及混凝土基础内预埋螺杆的固定技术领域。凝土基础内预埋螺杆时,由于精度控制工程中存在很大主观因素,地脚预埋螺杆定位的精度不高及技术水平不稳定。一种混凝土基础内预埋螺杆的固定架结构,其特征在于:包括箱体框架、吊装于箱体框架顶面的预埋螺杆定位装置,所述的预埋螺杆定位装置包括吊装于箱体框架的定型钢板、多根预埋螺杆、至少一块限位钢板,所述的定型钢板、限位钢板均开设与预埋螺杆数量相同的预埋螺杆孔,预埋螺杆穿过限位钢板后与定型钢板连接。本技术方案控制预埋螺杆的垂直度、间距、预埋螺杆之间的标高一致度、轴线尺寸和标高,保证预埋螺杆精度满足设计规范和标准工艺要求。
The invention relates to a fixing frame structure for pre-embedded screw rods in concrete foundations, and relates to the technical field of fixing pre-embedded screw rods in concrete foundations. When the screw is embedded in the concrete foundation, due to the subjective factors in the precision control project, the positioning accuracy of the embedded screw at the foot of the foundation is not high and the technical level is unstable. A fixed frame structure for pre-embedded screws in a concrete foundation, characterized in that it includes a box frame and a pre-embedded screw positioning device hoisted on the top surface of the box frame, and the pre-embedded screw positioning device includes a box frame hoisted on the box frame Shaped steel plates, multiple pre-embedded screws, and at least one limit steel plate. The shaped steel plates and limit steel plates are all provided with the same number of pre-embedded screw holes as the pre-embedded screws. After the pre-embedded screws pass through the limit steel plates and Steel connection. This technical scheme controls the verticality, spacing, elevation consistency between embedded screws, axis size and elevation of the embedded screws to ensure that the accuracy of the embedded screws meets the design specifications and standard process requirements.
Description
技术领域 technical field
本实用新型涉及混凝土基础内预埋螺杆的固定技术领域。 The utility model relates to the technical field of fixation of pre-embedded screw rods in concrete foundations. the
背景技术 Background technique
在变电站土建施工时,越来越多的采用预埋螺杆式基础用于安装固定钢管构架及设备支架。钢管底部法兰传入预埋螺杆后用螺母紧固,且A字杆构架的2个基础之间根开尺寸要求非常严格。因此施工过程中预埋螺杆的固定精度要求非常高。目前,一般施工企业采用的方法,由于精度控制工程中存在很大主观因素,地脚预埋螺杆定位的精度不高及技术水平不稳定。 In the civil construction of substations, more and more embedded screw foundations are used to install and fix steel pipe frames and equipment supports. The flange at the bottom of the steel pipe is introduced into the embedded screw and fastened with nuts, and the requirements for the root opening size between the two foundations of the A-shaped bar frame are very strict. Therefore, during the construction process, the fixing accuracy requirements of the embedded screw are very high. At present, the method adopted by general construction enterprises, due to the subjective factors in the precision control project, the positioning accuracy of the pre-embedded screw of the foundation is not high and the technical level is unstable. the
实用新型内容 Utility model content
本实用新型要解决的技术问题和提出的技术任务是对现有技术方案进行完善与改进,提供一种混凝土基础内预埋螺杆的固定架结构,以达到预埋螺杆精度不高和不稳定的目的。为此,本实用新型采取以下技术方案。 The technical problem to be solved and the technical task proposed by the utility model are to perfect and improve the existing technical scheme, and to provide a fixing frame structure for pre-embedded screw rods in the concrete foundation, so as to achieve low precision and unstable pre-embedded screw rods. Purpose. For this reason, the utility model takes the following technical solutions. the
一种混凝土基础内预埋螺杆的固定架结构,其特征在于:包括箱体框架、吊装于箱体框架顶面的预埋螺杆定位装置,所述的预埋螺杆定位装置包括吊装于箱体框架的定型钢板、多根预埋螺杆、至少一块限位钢板,所述的定型钢板、限位钢板均开设与预埋螺杆数量相同的预埋螺杆孔,预埋螺杆穿过限位钢板后与定型钢板连接。 A fixed frame structure for pre-embedded screws in a concrete foundation, characterized in that it includes a box frame and a pre-embedded screw positioning device hoisted on the top surface of the box frame, and the pre-embedded screw positioning device includes a box frame hoisted on the box frame Shaped steel plates, multiple pre-embedded screws, and at least one limit steel plate, the shaped steel plates and limit steel plates are all provided with the same number of pre-embedded screw holes as the pre-embedded screws, and the pre-embedded screws pass through the limit steel plates and are connected to the shape Steel connection. the
作为对上述技术方案的进一步完善和补充,本实用新型还包括以下附加技术特征。 As a further improvement and supplement to the above technical solution, the utility model also includes the following additional technical features. the
所述的箱体框架的顶面设有两间距可调的横杆,两横杆的两端通过紧固件与箱体框架连接,定型钢板架设在两横杆上,横杆两侧的定型钢板设有多对吊装孔,U形抱箍从横杆下方向上穿过吊装孔并通过螺母连接在定型钢板上,实现定型钢板固定在横杆上的定位连接。 The top surface of the box frame is provided with two horizontal bars with adjustable spacing. The steel plate is provided with multiple pairs of hoisting holes, and the U-shaped hoop passes through the hoisting holes from the bottom of the cross bar and is connected to the shaped steel plate through nuts to realize the positioning connection of the shaped steel plate fixed on the cross bar. the
预埋螺杆上设有两块上下平行设置的限位钢板,所述的限位钢板呈环状,其上设有多个周向均布的预埋螺杆孔。 The pre-embedded screw is provided with two limiting steel plates arranged in parallel up and down. The limiting steel plates are ring-shaped and provided with a plurality of pre-embedded screw holes evenly distributed in the circumferential direction. the
所述的定型钢板呈方形,其上设有四对前后对称的吊装孔。 The shaped steel plate is square, and four pairs of front and back symmetrical hoisting holes are arranged on it. the
箱体框架包括四下杆、四立杆、四上杆,四下杆方形排布形成底架,四上杆方形排布形成顶架,底架、顶架通过立杆支撑形成箱体框架,相邻立杆之间设有斜向设置的斜杆,杆与杆之间通过扣件连接。 The box frame includes four lower rods, four vertical rods, and four upper rods. The four lower rods are arranged in a square shape to form the bottom frame, and the four upper rods are arranged in a square shape to form the top frame. The bottom frame and the top frame are supported by the vertical rods to form the box frame. Slanting rods arranged obliquely are arranged between adjacent vertical rods, and the rods are connected by fasteners. the
横杆与上杆之间通过扣件连接。 The cross bar and the upper bar are connected by fasteners. the
预埋螺杆的下端向外弯折,预埋螺杆的上端设螺纹,预埋螺杆的螺纹上设有上下两螺母,其中下螺母设于定型钢板下方,上螺母设于定型钢板上方,上下两螺母限制预埋螺杆的上下移动以将预埋螺杆固定在定型钢板上。 The lower end of the pre-embedded screw is bent outward, and the upper end of the pre-embedded screw is provided with threads. The thread of the pre-embedded screw is provided with two upper and lower nuts, wherein the lower nut is arranged under the shaped steel plate, and the upper nut is arranged above the shaped steel plate. Limit the up and down movement of the embedded screw to fix the embedded screw on the shaped steel plate. the
预埋螺杆穿过限位钢板的预埋螺杆孔后在相交处通过焊接固定。 After the pre-embedded screw passes through the pre-embedded screw hole of the limiting steel plate, it is fixed at the intersection by welding. the
有益效果:固定架结构控制预埋螺杆的垂直度、间距、预埋螺杆之间的标高一致度、轴线尺寸和标高,保证预埋螺杆精度满足设计规范和标准工艺要求。 Beneficial effects: the fixed frame structure controls the verticality, spacing, elevation consistency between embedded screws, axis size and elevation of the embedded screws, and ensures that the accuracy of the embedded screws meets the design specifications and standard process requirements. the
附图说明 Description of drawings
图1是本实用新型整体结构的侧视图。 Fig. 1 is a side view of the overall structure of the utility model. the
图2是本实用新型整体结构的俯视图。 Fig. 2 is a top view of the overall structure of the utility model. the
图3是本实用新型定型钢板图。 Fig. 3 is a figure of the shaped steel plate of the utility model. the
图4是本实用新型限位钢板图。 Fig. 4 is the limit steel plate figure of the utility model. the
图中:1-箱体框架、2-预埋螺杆、3-定型钢板、4-双螺母、5-抱箍、6-限位钢板、7-预埋件、8-素混凝土地面、9-扣件、10-横杆。 In the figure: 1- box frame, 2- embedded screw, 3- shaped steel plate, 4- double nut, 5- hoop, 6- limit steel plate, 7- embedded parts, 8- plain concrete floor, 9- Fasteners, 10-crossbar. the
具体实施方式 Detailed ways
以下结合说明书附图对本实用新型的技术方案做进一步的详细说明。 The technical solution of the utility model is described in further detail below in conjunction with the accompanying drawings of the description. the
如图1、2、3、4所示,本实用新型包括箱体框架(1)、吊装于箱体框架(1)顶面的预埋螺杆(2)定位装置,预埋螺杆(2)定位装置包括吊装于箱体框架(1)的定型钢板(3)、多根预埋螺杆(2)、两块上下平行设置的限位钢板(6),定型钢板(3)、限位钢板(6)均开设与预埋螺杆(2)数量相同的预埋螺杆孔,预埋螺杆(2)穿过限位钢板(6)后与定型钢板(3)连接。箱体框架(1)的顶面设有两间距可调的横杆(10),两横杆(10)的两端通过紧固件与箱体框架(1)连接,定型钢板(3)架设在两横杆(10)上,横杆(10)两侧的定型钢板(3)设有多对吊装孔,U形抱箍(5)从横杆(10)下方向上穿过吊装孔并通过螺母(4)连接在定型钢板(3)上,实现定型钢板(3)固定在横杆(10)上的定位连接。限位钢板(6)呈环状,其上设有多个周向均布的预埋螺杆孔。定型钢板(3)呈方形,其上设有四对前后对称的吊装孔。箱体框架(1)包括四下杆、四立杆、四上杆,四下杆方形排布形成底架,四上杆方形排布形成顶架,底架、顶架通过立杆支撑形成箱体框架(1),相邻立杆之间设有斜向设置的斜杆,杆与杆之间通过扣件(9)连接。预埋螺杆(2)的下端向外弯折,预埋螺杆(2)的上端设螺纹,预埋螺杆(2)的螺纹上设有上下两螺母(4),其中下螺母(4)设于定型钢板(3)下方,上螺母(4)设于定型钢板(3)上方,上下两螺母(4)限制预埋螺杆(2)的上下移动以将预埋螺杆(2)固定在定型钢板(3)上。预埋螺杆(2)穿过限位钢板(6)的预埋螺杆孔后在相交处通过焊接固定。 As shown in Figures 1, 2, 3, and 4, the utility model includes a box frame (1), a pre-embedded screw (2) positioning device hoisted on the top surface of the box frame (1), and a pre-embedded screw (2) positioning device The device includes a shaped steel plate (3) hoisted on the box frame (1), multiple pre-embedded screws (2), two limit steel plates (6) arranged in parallel up and down, shaped steel plates (3), limit steel plates (6 ) are provided with the same number of pre-embedded screw holes as the pre-embedded screw (2), and the pre-embedded screw (2) passes through the limiting steel plate (6) and is connected with the shaped steel plate (3). The top surface of the box frame (1) is provided with two horizontal bars (10) with adjustable spacing. On the two cross bars (10), the shaped steel plates (3) on both sides of the cross bar (10) are provided with multiple pairs of hoisting holes, and the U-shaped hoop (5) passes through the hoisting holes from the bottom of the cross bar (10) upwards and through The nut (4) is connected to the shaped steel plate (3) to realize the positioning connection of the shaped steel plate (3) fixed on the cross bar (10). The limiting steel plate (6) is annular and is provided with a plurality of pre-embedded screw holes evenly distributed in the circumferential direction. The shaped steel plate (3) is square and is provided with four pairs of front and back symmetrical hoisting holes. The box frame (1) includes four lower rods, four vertical rods, and four upper rods. The four lower rods are arranged in a square shape to form the bottom frame, and the four upper rods are arranged in a square shape to form the top frame. The bottom frame and the top frame are supported by the vertical rods to form a box. Body frame (1), obliquely arranged oblique rods are arranged between adjacent vertical rods, and the rods are connected by fasteners (9). The lower end of the pre-embedded screw (2) is bent outward, the upper end of the pre-embedded screw (2) is threaded, and the thread of the pre-embedded screw (2) is provided with upper and lower nuts (4), wherein the lower nut (4) is located on Below the shaped steel plate (3), the upper nut (4) is set above the shaped steel plate (3), and the upper and lower two nuts (4) restrict the up and down movement of the embedded screw (2) to fix the embedded screw (2) on the shaped steel plate ( 3) on. The pre-embedded screw (2) passes through the pre-embedded screw hole of the limiting steel plate (6) and is fixed at the intersection by welding. the
装配过程: Assembly process:
箱体框架1的立杆与设于素混凝土地面8的预埋件7焊接,箱体框架1的上杆中间安装两根可调横杆10,用扣件9与箱体框架1连接,可调横杆10通过U型抱箍5连接定型钢板3,把预埋螺杆2穿过定型钢板3上的定置留孔,用双螺母4固定在定型钢板3上,但是在此之前得在预埋螺杆上放置两道所述环形限位钢板6。先调节箱体框架1上杆和立杆连接的扣件9使定型钢板3水平,再通过调节双螺母4至水平且标高符合设计要求,紧固双螺母4后,把环形限位钢板6与预埋螺杆2焊接,至此,预埋螺杆2安装工作完成,再通过调整可调横杆10和U型抱箍5确定预埋螺杆2的轴线尺寸,最后复测各项精度指标。本实用新型用两道环形限位钢板6保证预埋螺杆的垂直度,用定型钢板3控制预埋螺杆间距,用双螺母4控制预埋螺杆2端部标高,用可调横杆和U型抱箍5控制轴线尺寸,大大提高了预埋螺杆2安装定位的精度和稳定性。 The vertical bar of the box frame 1 is welded with the embedded part 7 located on the plain concrete floor 8, and two adjustable cross bars 10 are installed in the middle of the upper bar of the box frame 1, and are connected with the box frame 1 with fasteners 9, which can The cross bar 10 is connected to the shaped steel plate 3 through the U-shaped hoop 5, and the embedded screw 2 passes through the fixed hole on the shaped steel plate 3, and is fixed on the shaped steel plate 3 with double nuts 4, but before that, it must be pre-embedded. Place two said annular limit steel plates 6 on the screw rod. First adjust the fastener 9 connecting the upper pole of the box frame 1 and the vertical pole to make the shaped steel plate 3 level, and then adjust the double nut 4 to the level and the elevation meets the design requirements. After tightening the double nut 4, connect the annular limit steel plate 6 to the The pre-embedded screw 2 is welded. At this point, the installation of the pre-embedded screw 2 is completed, and then the axis size of the pre-embedded screw 2 is determined by adjusting the adjustable cross bar 10 and the U-shaped hoop 5, and finally retests various accuracy indicators. The utility model uses two ring-shaped limit steel plates 6 to ensure the verticality of the pre-embedded screw rods, uses shaped steel plates 3 to control the distance between the pre-embedded screw rods, uses double nuts 4 to control the elevation of the ends of the pre-embedded screw rods 2, and uses adjustable cross bars and U-shaped The hoop 5 controls the size of the axis, which greatly improves the installation and positioning accuracy and stability of the pre-embedded screw 2 .
以上图1-4所示的一种混凝土基础内预埋螺杆的固定架结构是本实用新型的具体实施例,已经体现出本实用新型实质性特点和进步,可根据实际的使用需要,在本实用新型的启示下,对其进行形状、结构等方面的等同修改,均在本方案的保护范围之列。 The fixed frame structure of the embedded screw rod in the concrete foundation shown in the above Figures 1-4 is a specific embodiment of the present invention, which has reflected the substantive characteristics and progress of the present invention, and can be used in this application according to actual needs. Under the enlightenment of the utility model, equivalent modification of its shape, structure and other aspects are all within the scope of protection of this scheme. the
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320795764.5U CN203741866U (en) | 2013-12-06 | 2013-12-06 | Fixing frame structure for pre-buried screws in concrete foundation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320795764.5U CN203741866U (en) | 2013-12-06 | 2013-12-06 | Fixing frame structure for pre-buried screws in concrete foundation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203741866U true CN203741866U (en) | 2014-07-30 |
Family
ID=51341687
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320795764.5U Expired - Lifetime CN203741866U (en) | 2013-12-06 | 2013-12-06 | Fixing frame structure for pre-buried screws in concrete foundation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203741866U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104452800A (en) * | 2014-11-17 | 2015-03-25 | 中国五冶集团有限公司 | Cement grinding mill foundation suspension type reserved hole embedding method |
| CN107165288A (en) * | 2017-06-05 | 2017-09-15 | 浙江省送变电工程公司 | The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap |
| CN109487989A (en) * | 2018-11-13 | 2019-03-19 | 上海建工五建集团有限公司 | The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete |
| CN109853610A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method |
| CN111379272A (en) * | 2020-04-21 | 2020-07-07 | 上海电力设计院有限公司 | Embedded part elevation and levelness control device and control method |
-
2013
- 2013-12-06 CN CN201320795764.5U patent/CN203741866U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104452800A (en) * | 2014-11-17 | 2015-03-25 | 中国五冶集团有限公司 | Cement grinding mill foundation suspension type reserved hole embedding method |
| CN107165288A (en) * | 2017-06-05 | 2017-09-15 | 浙江省送变电工程公司 | The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap |
| CN109487989A (en) * | 2018-11-13 | 2019-03-19 | 上海建工五建集团有限公司 | The fixation bracket and its installation method of pre-buried abnormity air hose in super thick concrete |
| CN109853610A (en) * | 2019-01-30 | 2019-06-07 | 山西三建集团有限公司 | Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method |
| CN111379272A (en) * | 2020-04-21 | 2020-07-07 | 上海电力设计院有限公司 | Embedded part elevation and levelness control device and control method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206204995U (en) | The tall and big side wall one side formwork erection of open trench tunnel agent structure | |
| CN203960895U (en) | Anchor slab bolt assembly and tower foundation assembly | |
| CN207176726U (en) | A kind of concrete foundation built-in fitting quick level adjusting device | |
| CN203160267U (en) | Split adjustable positioning device of embedded bolts of tower crane foundation | |
| CN101951191A (en) | Adjustable-height bracket base for photovoltaic array bracket | |
| CN203223002U (en) | Large pre-burying board installing and leveling device | |
| CN103343551A (en) | Goaf transmission tower foundation adjusting device | |
| CN114215350A (en) | A kind of inner support device of concrete wall buried power distribution box and using method thereof | |
| CN202745274U (en) | A height-adjustable steel column assembly | |
| CN205975376U (en) | Oblique web built -up plate of case roof beam | |
| CN204920263U (en) | But height-adjusting's guardrail | |
| CN203475809U (en) | Scaffold supporting structure convenient to mount and dismount | |
| CN202007090U (en) | Tower Crane Attached to the Wall Device | |
| CN207044375U (en) | Grouting sleeve slurry anchor connection test piece fixing device | |
| CN206000028U (en) | A kind of combination built-in fitting of steel building | |
| CN204003377U (en) | The device that when a kind of compressor centering, motor substantially horizontal position is adjusted | |
| CN201915632U (en) | Adjustable supporting structure of beam template | |
| CN219327342U (en) | Auxiliary device for installing embedded screw | |
| CN208594483U (en) | A kind of large-scale bracket device of transom pier Coping Construction | |
| CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
| CN203346922U (en) | Foundation adjusting device of transmission tower of goaf | |
| CN204297878U (en) | Without the sedan-chair frame of underbeam | |
| CN204266600U (en) | A kind of concrete planeness and height controller | |
| CN204946645U (en) | A kind of two-stub transformer stand | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140730 |