CN203737903U - Longitudinal bar positioning tool for reinforcement cage - Google Patents

Longitudinal bar positioning tool for reinforcement cage Download PDF

Info

Publication number
CN203737903U
CN203737903U CN201420063918.6U CN201420063918U CN203737903U CN 203737903 U CN203737903 U CN 203737903U CN 201420063918 U CN201420063918 U CN 201420063918U CN 203737903 U CN203737903 U CN 203737903U
Authority
CN
China
Prior art keywords
reinforcement cage
semicircle
longitudinal bar
positioning tool
bar positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420063918.6U
Other languages
Chinese (zh)
Inventor
常红霞
黎学刚
付作英
何秀贞
王俊美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG SHOUGUANG FIRST BUILDING CO Ltd
Original Assignee
SHANDONG SHOUGUANG FIRST BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG SHOUGUANG FIRST BUILDING CO Ltd filed Critical SHANDONG SHOUGUANG FIRST BUILDING CO Ltd
Priority to CN201420063918.6U priority Critical patent/CN203737903U/en
Application granted granted Critical
Publication of CN203737903U publication Critical patent/CN203737903U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a longitudinal bar positioning tool for a reinforcement cage. The longitudinal bar positioning tool comprises two semicircular boards which are spliced into a circle, and the two semicircular boards are movably connected through hinges. The outer circumferences of the semicircular boards are evenly provided with a plurality of grooves at equal intervals, and the grooves can contain longitudinal bars. When the reinforcement cage is machined, three positioning tools are evenly placed at equal intervals, the reinforcement cage longitudinal bars are placed into the grooves, spiral stirrups penetrate through the longitudinal bars, the spiral stirrups are stretched according to designed intervals to conduct binding, and after the reinforcement cage is bound, a supporting rod is pulled out, and the positioning tools are taken out. With the longitudinal bar positioning tool, the longitudinal bars can be positioned accurately at a time, the process of repeated adjustment is omitted, and the diameter of the reinforcement cage is easily ensured.

Description

The vertical muscle orientation tool of a kind of steel reinforcement cage
Technical field
the utility model relates to a kind of reinforcing bar orientation tool, relates to specifically the vertical muscle orientation tool of a kind of steel reinforcement cage, belongs to building construction technical field.
Background technology
Traditional pile foundation steel bar cage processing method is: the tie hoop of diameter is determined in first processing, then tie hoop is stretched, again vertical steel reinforcement cage muscle is penetrated to tie hoop inside, arrange by design pitch, penetrate retainer ring muscle in vertical muscle inside, to indulge muscle and retainer ring muscle firm welding, again by design tie hoop spacing stretching tie hoop, stretch while colligation, finally other auxiliary equipment of colligation again, utilize this kind of method processing pile foundation steel bar cage, and the diameter deviation of steel reinforcement cage is large, longitudinal bar spacing adjustment difficulty is large, inefficiency.
Utility model content
Problem to be solved in the utility model is in order to overcome above-mentioned constructional deficiency, provides one can ensure longitudinal bar spacing and steel reinforcement cage diameter, improves the vertical muscle orientation tool of steel reinforcement cage of efficiency of construction.
In order to address the above problem, the utility model by the following technical solutions:
The vertical muscle orientation tool of a kind of steel reinforcement cage, comprise two semicircle planks, two semicircle planks are combined into a circle, in the middle of it, are flexibly connected with loose-leaf, keep at a certain distance away and be evenly provided with the groove that several can hold longitudinal bar on the excircle of described semicircle plank.
Below the further optimization of the utility model to such scheme:
On described two semicircle planks, a semicircular draw ring is respectively installed, two draw rings are symmetrical arranged, when use, and an interspersed support bar in two draw rings.
When screwing steel bars cage, keep at a certain distance away and evenly place three orientation tools, vertical steel reinforcement cage muscle is placed in groove, then tie hoop is passed to vertical muscle, carry out colligation by design pitch stretching tie hoop, steel reinforcement cage colligation is complete, extract support bar out, take out orientation tool, use this vertical muscle orientation tool can make vertical muscle one-time positioning accurate, avoided the process of adjustment repeatedly, the diameter of steel reinforcement cage easily ensures.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Brief description of the drawings
Accompanying drawing 1 is the structural representation of the utility model embodiment;
Accompanying drawing 2 is the use state diagram of orientation tool in the utility model embodiment.
In figure: 1-groove; The semicircle plank of 2-; 3-support bar; 4-loose-leaf; 5-draw ring; 6-longitudinal bar.
Detailed description of the invention
Embodiment, as shown in Figure 1, the vertical muscle orientation tool of a kind of steel reinforcement cage, comprise two semicircle planks 2, two semicircle planks 2 are combined into a circle, in the middle of it, be flexibly connected with loose-leaf 4, on the excircle of described semicircle plank 2, keep at a certain distance away and be evenly provided with the groove 1 that several can hold longitudinal bar.
On described two semicircle planks 2, a semicircular draw ring 5 is respectively installed, in the nut anchoring of the plank back side.
When use, the support bar 3 of making at two interior reinforcing bars that intert a Φ 25mm of draw ring 5, ensures two semicircle planks 2 at grade.
The setting of loose-leaf, can freely uphold two semicircle planks 2, and convenient vertical muscle colligation is complete, can in steel reinforcement cage, take out.
As shown in Figure 2, when screwing steel bars cage, keep at a certain distance away and evenly place three orientation tools, vertical steel reinforcement cage muscle 6 is placed in groove 1, then tie hoop is passed to vertical muscle 6, carry out colligation by design pitch stretching tie hoop, steel reinforcement cage colligation is complete, extracts support bar 3 out, take out orientation tool, use this vertical muscle orientation tool can make vertical muscle one-time positioning accurate, avoided the process of adjustment repeatedly, the diameter of steel reinforcement cage easily ensures.

Claims (2)

1. the vertical muscle orientation tool of steel reinforcement cage, comprise two semicircle planks (2), it is characterized in that: two semicircle planks (2) are combined into a circle, in the middle of it, be flexibly connected with loose-leaf (4), on the excircle of described semicircle plank (2), keep at a certain distance away and be evenly provided with several grooves that can hold longitudinal bar (1).
2. the vertical muscle orientation tool of a kind of steel reinforcement cage according to claim 1, is characterized in that:
A semicircular draw ring (5) is respectively installed on described two semicircle planks (2), and two draw rings (5) are symmetrical arranged, when use, and an interspersed support bar (3) in two draw rings (5).
CN201420063918.6U 2014-02-13 2014-02-13 Longitudinal bar positioning tool for reinforcement cage Expired - Fee Related CN203737903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420063918.6U CN203737903U (en) 2014-02-13 2014-02-13 Longitudinal bar positioning tool for reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420063918.6U CN203737903U (en) 2014-02-13 2014-02-13 Longitudinal bar positioning tool for reinforcement cage

Publications (1)

Publication Number Publication Date
CN203737903U true CN203737903U (en) 2014-07-30

Family

ID=51337767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420063918.6U Expired - Fee Related CN203737903U (en) 2014-02-13 2014-02-13 Longitudinal bar positioning tool for reinforcement cage

Country Status (1)

Country Link
CN (1) CN203737903U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358251A (en) * 2014-11-21 2015-02-18 中国十七冶集团有限公司 Main reinforcement distance control device during pile foundation project reinforcement cage manufacturing and pile foundation project reinforcement cage manufacturing method
CN105569186A (en) * 2015-12-25 2016-05-11 中民筑友有限公司 Assembling method of precast column
CN110280700A (en) * 2019-06-25 2019-09-27 中建七局安装工程有限公司 It is a kind of to facilitate overlength steel reinforcement cage segmentation docking processing system and processing method
CN111005744A (en) * 2019-12-30 2020-04-14 湖南尚上公路桥梁建设有限公司 Support beam structure of municipal shield tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358251A (en) * 2014-11-21 2015-02-18 中国十七冶集团有限公司 Main reinforcement distance control device during pile foundation project reinforcement cage manufacturing and pile foundation project reinforcement cage manufacturing method
CN105569186A (en) * 2015-12-25 2016-05-11 中民筑友有限公司 Assembling method of precast column
CN110280700A (en) * 2019-06-25 2019-09-27 中建七局安装工程有限公司 It is a kind of to facilitate overlength steel reinforcement cage segmentation docking processing system and processing method
CN111005744A (en) * 2019-12-30 2020-04-14 湖南尚上公路桥梁建设有限公司 Support beam structure of municipal shield tunnel
CN111005744B (en) * 2019-12-30 2021-10-19 湖南尚上市政建设开发有限公司 Support beam structure of municipal shield tunnel

Similar Documents

Publication Publication Date Title
CN203737903U (en) Longitudinal bar positioning tool for reinforcement cage
CN202317572U (en) Large-scale cylinder body assembly device
CN206382480U (en) A kind of small rectangular steel reinforcement cage contoured support instrument
CN104481151A (en) Beam steel framework and beam column connecting part stirrup binding method
CN103586374B (en) A kind of serration type steel reinforcement cage processing moulding bed and construction method thereof
CN206487155U (en) Pier stud reinforcing bar positioning clamping fixture method Integral processing device
CN203818291U (en) Template used for reversing holes in precast concrete unit
CN204024046U (en) A kind of asymmetric cylinder and beam tubular joint formwork erection system
CN202969923U (en) Post mould plate reinforcing assembly
CN203635828U (en) Serration-type reinforcing cage processing jig frame
CN204234964U (en) Circumference duplex iron reinforced concrete pipe reinforced bar skeleton seam welder
CN201807752U (en) Outer circle tool set
CN207642213U (en) A kind of filling pile cage of reinforcement tie hoop positioning auxiliary device
CN203899633U (en) Combined bracket for laboratory
CN106141475B (en) The application method of auxiliary device for the assembling of welded H type bracket
CN203795871U (en) Hooping bundling operation frame for structural columns
CN202899619U (en) Mould plate fixing device
CN202559350U (en) Pulling-resistant anchor rod
CN201485966U (en) Anti-earthquake thickening loop in core region of frame columns
CN202511306U (en) Scaffold for maintaining interior of flue
CN204982671U (en) Automatic adjustment tool of pier shaft reinforcing bar
CN204463684U (en) Cone-shaped footing actual training device
CN205217849U (en) Steel bar bending tool
CN203867194U (en) Mold for variable-cross-section round-end reinforcement cage forming framework
CN203583473U (en) Centering support for reinforced soil nail or anchor rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20160213