CN203716128U - Novel offshore exploration platform - Google Patents

Novel offshore exploration platform Download PDF

Info

Publication number
CN203716128U
CN203716128U CN201420045447.6U CN201420045447U CN203716128U CN 203716128 U CN203716128 U CN 203716128U CN 201420045447 U CN201420045447 U CN 201420045447U CN 203716128 U CN203716128 U CN 203716128U
Authority
CN
China
Prior art keywords
auxiliary floating
ground investigation
platform
marine ground
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420045447.6U
Other languages
Chinese (zh)
Inventor
丁红岩
徐宝
张浦阳
黄宣旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201420045447.6U priority Critical patent/CN203716128U/en
Application granted granted Critical
Publication of CN203716128U publication Critical patent/CN203716128U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Abstract

The utility model discloses a novel offshore exploration platform. The novel offshore exploration platform comprises a hollow annular base structure, a hollow annular auxiliary floating structure and an operating platform which is provided with an exploration hole; the base structure and the auxiliary floating structure are respectively provided with a water feeding system and a water drainage system; the base structure, the auxiliary floating structure and the floating structure are connected together through brackets which are uniformly distributed annularly; the base structure is positioned on the bottoms of the brackets; the operating platform is positioned on the tops of the brackets; the auxiliary floating structure is positioned on the middle parts of the brackets. The novel offshore exploration platform disclosed by the utility model is simple in structure and stable and reliable in use; the limitation to offshore exploration caused by offshore natural conditions is reduced; the offshore exploration efficiency and the offshore exploration quality can be guaranteed; the construction window period of the offshore exploration is increased; the safety of the offshore exploration is greatly improved; the personnel and the cost of the offshore exploration are saved.

Description

A kind of novel marine ground investigation platform
Technical field
The utility model relates to a kind of floating structure, specifically, relates to a kind of assistance platform for marine ground investigation.
Background technology
Before Construction of Wind Power, need to be to explorations of being correlated with such as the marine environment in offshore wind farm place, geological conditionss, the accurate exploration of marine environment and geological conditions is most important for the Exact Design of marine structure.Along with China is to the carrying forward vigorously of marine resources development utilization, be especially accompanied by the fast development in offshore wind farm field, marine ground investigation activity is more and more, and exploration quality requirement is also more and more higher.
Marine ground investigation is at present generally to utilize special-purpose exploration boats and ships, and casting anchor in sea, utilizes Special-purpose soil fetching device, original position search equipment etc. to carry out marine ground investigation operation on ship.But the on-the-spot in place and location complexity of casting anchor of this conventional art, vessel expenses is expensive, and the required engineering time is long, and construction cost is high.And owing to being usually subject to the impact of the factors such as marine climate and trend, wave, current exploring equipment and the method window phase of can constructing is less, and efficiency of construction is low, of low quality.
Utility model content
To be solved in the utility model be existing marine ground investigation efficiency lower, explore second-rate technical problem, a kind of novel marine ground investigation platform is provided.
In order to solve the problems of the technologies described above, the utility model is achieved by following technical scheme:
A kind of novel marine ground investigation platform, comprise the circular foundation structure of hollow, the circular auxiliary floating caisson of hollow and be provided with the operating platform of exploratory hole, described foundation structure and described auxiliary floating caisson are respectively arranged with water inlet system and drainage system, described foundation structure, described auxiliary floating caisson and described operating platform are linked together by the uniform support of hoop, described foundation structure is positioned at the bottom of described support, described operating platform is positioned at the top of described support, and described auxiliary floating caisson is positioned at the middle part of described support.
Described operating platform end face is higher than design peak level 3~5m.
The position of described auxiliary floating caisson on described support should meet novel marine ground investigation platform sinking to sea bed, the waterline of exploration sites at the end face of described auxiliary floating caisson between structure centre line.
The circular internal diameter of described foundation structure is 8~13m, and circular external diameter is 10~15m, is highly 1~3m.
The circular internal diameter of described auxiliary floating caisson is 5~9m, and circular external diameter is 6~10m, is highly 1~3m.
The diameter of described exploratory hole is 0.3~1m.
The upright projection height of described support is 5~50m.
Described support and described foundation structure, described auxiliary floating caisson, described operating platform respectively by welding, bolt is connected or snap ring connects.
The beneficial effects of the utility model are:
Novel marine ground investigation platform structure of the present utility model is simple, uses reliable and stablely, has reduced the restriction of marine natural conditions to marine ground investigation; Can guarantee efficiency and the quality of marine ground investigation, increase the construction window phase of marine ground investigation, greatly improve the safety of marine ground investigation, save personnel and the expense of marine ground investigation.
And novel marine ground investigation platform of the present utility model can adopt body of one who has dropped dead by the roadside formula transportation by driving mode when transportation, and center of gravity is low, and safety is good; Marine installation process is simple to operation, and location sinking controllability is strong.
Accompanying drawing explanation
Fig. 1 is the structural representation of novel marine ground investigation platform provided by the utility model;
Fig. 2 is the floor map of foundation structure;
Fig. 3 is the floor map of auxiliary floating caisson;
Fig. 4 is the floor map of operating platform;
Fig. 5 is the transportation by driving view of novel marine ground investigation platform provided by the utility model.
In figure: 1, foundation structure; 2, support; 3, auxiliary floating caisson; 4, operating platform; 5, exploratory hole.
The specific embodiment
For further understanding summary of the invention of the present utility model, feature and effect, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
As shown in Figure 1, the present embodiment has disclosed a kind of novel marine ground investigation platform, mainly by foundation structure 1, auxiliary floating caisson 3, operating platform 4 and connect the above-mentioned some supports 2 that connect and form.
As shown in Figure 2, foundation structure 1 is circular hollow steel design, and its circular internal diameter is 8~13m, and circular external diameter is 10~15m, and the height of foundation structure 1 is 1~3m.In foundation structure 1, be provided with water inlet system and drainage system.
As shown in Figure 3, auxiliary floating caisson 3 is circular hollow steel design, and its circular internal diameter is 5~9m, and circular external diameter is 6~10m, and the height of auxiliary floating caisson 3 is 1~3m.On auxiliary floating caisson 3, be provided with water inlet system and drainage system.
As shown in Figure 4, operating platform 4 is steel work, and on it, being provided with diameter is the exploratory hole 5 of 0.3~1m, and operating platform 4 peripheries are also provided with the safeguard procedures such as railing.
Support 2 is steel pipe or formed steel construction, and the upright projection height of support 2 is 5~50m.The uniform support 2 of some hoops links together foundation structure 1, auxiliary floating caisson 3 and operating platform 4, and wherein foundation structure 1 is positioned at the bottom of support 2, and operating platform 4 is positioned at the top of support 2, and auxiliary floating caisson 3 is positioned at the middle part of support 2.Support 2 and foundation structure 1, auxiliary floating caisson 3, operating platform 4 respectively by welding, bolt is connected or snap ring connects.
The overall height of marine ground investigation platform is definite according to the depth of water situation in required exploration marine site, and general operation platform 4 end faces are than the high 3~5m of design peak level of exploration sites.The position of auxiliary floating caisson 3 on support 2 also will be determined according to the design maximum water level of exploration sites, generally should guarantee that novel marine ground investigation platform sinking is to sea bed, in the scope of the waterline of exploration sites between the structure centre line of the extremely auxiliary floating caisson 3 of end face of auxiliary floating caisson 3.
The construction method of above-mentioned novel marine ground investigation platform is as follows:
Land fabrication foundation structure 1, auxiliary floating caisson 3 and operating platform 4.Above-mentioned each parts of land transportation are to harbour, and bank utilizes support 2 to connect foundation structure 1, auxiliary floating caisson 3 and operating platform 4, to complete the assembling of novel marine ground investigation platform.Guarantee that water inlet system and the drainage system of the water inlet system of foundation structure 1 and drainage system, auxiliary floating caisson 3 close.
Novel marine ground investigation platform is lifted into water, adopt body of one who has dropped dead by the roadside formula means of transportation, utilize towboat that novel marine ground investigation platform is hauled to exploration sites, as shown in Figure 5.
Novel marine ground investigation platform, according to after Design Orientation, is opened the water inlet system of foundation structure 1, until foundation structure 1 is closed its water inlet system after being full of water, novel marine ground investigation platform sinking to sea bed is preset to exploration sites, and leveling.
Because auxiliary floating caisson 3 is positioned near water surface curve, therefore can in above-mentioned sinking process, provide buoyancy, to avoid novel marine ground investigation platform and integrally to topple in sinking process under water.After novel marine ground investigation platform sinks to putting in place, open the water inlet system of auxiliary floating caisson 3, until auxiliary floating caisson 3 is closed its water inlet system after being full of water, can increase the gross weight of novel marine ground investigation platform.
By on marine ground investigation equipment hoisting operating platform 4, open exploratory hole 5 and carry out marine ground investigation.
Marine ground investigation completes, and after marine ground investigation equipment is shifted, open the drainage system of foundation structure 1 and the drainage system of auxiliary floating caisson 3 carries out draining, make novel marine ground investigation platform floating and recover body of one who has dropped dead by the roadside formula and place, exploration sites is left in haul, can carry out the exploration of next exploratory point.
Although by reference to the accompanying drawings preferred embodiment of the present utility model is described above; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not departing from the scope situation that aim of the present invention and claim protect, can also make the concrete conversion of a lot of forms, within these all belong to protection domain of the present utility model.

Claims (8)

1. a novel marine ground investigation platform, it is characterized in that, comprise the circular foundation structure of hollow, the circular auxiliary floating caisson of hollow and be provided with the operating platform of exploratory hole, described foundation structure and described auxiliary floating caisson are respectively arranged with water inlet system and drainage system, described foundation structure, described auxiliary floating caisson and described operating platform are linked together by the uniform support of hoop, described foundation structure is positioned at the bottom of described support, described operating platform is positioned at the top of described support, and described auxiliary floating caisson is positioned at the middle part of described support.
2. a kind of novel marine ground investigation platform according to claim 1, is characterized in that, described operating platform end face is higher than design peak level 3~5m.
3. a kind of novel marine ground investigation platform according to claim 1, it is characterized in that, the position of described auxiliary floating caisson on described support should meet novel marine ground investigation platform sinking to sea bed, the waterline of exploration sites at the end face of described auxiliary floating caisson between structure centre line.
4. a kind of novel marine ground investigation platform according to claim 1, is characterized in that, the circular internal diameter of described foundation structure is 8~13m, and circular external diameter is 10~15m, is highly 1~3m.
5. a kind of novel marine ground investigation platform according to claim 1, is characterized in that, the circular internal diameter of described auxiliary floating caisson is 5~9m, and circular external diameter is 6~10m, is highly 1~3m.
6. a kind of novel marine ground investigation platform according to claim 1, is characterized in that, the diameter of described exploratory hole is 0.3~1m.
7. a kind of novel marine ground investigation platform according to claim 1, is characterized in that, the upright projection height of described support is 5~50m.
8. a kind of novel marine ground investigation platform according to claim 1, is characterized in that, described support and described foundation structure, described auxiliary floating caisson, described operating platform respectively by welding, bolt is connected or snap ring connects.
CN201420045447.6U 2014-01-23 2014-01-23 Novel offshore exploration platform Withdrawn - After Issue CN203716128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420045447.6U CN203716128U (en) 2014-01-23 2014-01-23 Novel offshore exploration platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420045447.6U CN203716128U (en) 2014-01-23 2014-01-23 Novel offshore exploration platform

Publications (1)

Publication Number Publication Date
CN203716128U true CN203716128U (en) 2014-07-16

Family

ID=51155296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420045447.6U Withdrawn - After Issue CN203716128U (en) 2014-01-23 2014-01-23 Novel offshore exploration platform

Country Status (1)

Country Link
CN (1) CN203716128U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758096A (en) * 2014-01-23 2014-04-30 天津大学 Novel offshore exploration platform and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758096A (en) * 2014-01-23 2014-04-30 天津大学 Novel offshore exploration platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN102425167B (en) Pile sinking method for driving large-diameter steel pipe pile in intertidal zone
CN102839666B (en) Bottom-supported floating pile-driving platform
CN205653814U (en) Marine wind finding radar foundation structure of caisson type
CN103205980A (en) Large-diameter mono-pile foundation of offshore wind turbine and construction method of large-diameter mono-pile foundation
CN101837929B (en) Operation method for lifting fan for barge in shoal area
CN104727336A (en) Construction method of large single-pipe pile foundation of shallow-sea wind power plant
CN103981846A (en) Pile positioning semi-submersible offshore dredging engineering ship
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
CN203939028U (en) Portable marine piling position-limited rack
CN202298591U (en) Shallow water tremie frame platform
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
CN106697189A (en) Installation method for float-dragging method offshore type ocean booster station
CN102312438A (en) Piling construction equipment for large steel pipe piles of seaborn intertidal zone wind power station
CN106638530A (en) Process for lifting offshore booster station jacket in shallow water
CN101844606B (en) Shallow sea wind power construction system, shallow sea wind power platform and shallow sea wind power construction method
CN103758096B (en) A kind of offshore exploration platform and construction method thereof
CN103195080B (en) Towing method for gravity foundation
CN203716128U (en) Novel offshore exploration platform
CN201971133U (en) Bottom-supported blower installation platform
CN104164885A (en) Caisson towing method
CN203472445U (en) Walking type semi-submersible amphibious engineering ship
CN110758662A (en) Movable free-rising and sinking storm platform
CN203684191U (en) Fan construction system of offshore intertidal zone
CN202414121U (en) Marine wind-powered installation vessel
CN211032946U (en) Movable free-rising and sinking storm platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140716

Effective date of abandoning: 20150729

RGAV Abandon patent right to avoid regrant