CN203716016U - Anchor replacing device for railway concrete sleeper turnout - Google Patents

Anchor replacing device for railway concrete sleeper turnout Download PDF

Info

Publication number
CN203716016U
CN203716016U CN201420075535.0U CN201420075535U CN203716016U CN 203716016 U CN203716016 U CN 203716016U CN 201420075535 U CN201420075535 U CN 201420075535U CN 203716016 U CN203716016 U CN 203716016U
Authority
CN
China
Prior art keywords
base
fixed
vertical
concrete
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420075535.0U
Other languages
Chinese (zh)
Inventor
汤锦州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420075535.0U priority Critical patent/CN203716016U/en
Application granted granted Critical
Publication of CN203716016U publication Critical patent/CN203716016U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model discloses an anchor replacing device for a railway concrete sleeper turnout, and belongs to the technical field of maintenance of railway turnouts. The anchor replacing device comprises a base and fasteners, wherein a hollow vertical upright column is connected onto the base; a perpendicular lifter is mounted on the upright column; a motor is fixed on the vertical lifter; a vertical hollow drill is mounted on the output shaft of the motor; the diameter of the inner wall of the hollow drill is larger than that of a nylon casing; fastening through holes are formed in two ends of the base respectively, and inclined side plates are fixed at two ends of the lower surface of the base respectively; the base and cross sections of the side plates are matched with the cross section of the concrete turnout sleeper; and the fasteners comprise L-shaped channel steel and connecting rods perpendicularly fixed at one end of the channel steel, and a thread and a clamp nut matched with the thread are arranged at the upper end of the connecting rod. The position of the device on the concrete turnout sleeper is firm, accurate exerted force of a drill during work is guaranteed; and the device is not damaged easily, light in structure, simple to operate, time-saving and labor-saving, and can replace vertical bolts quickly and improve the work efficiency.

Description

Railway concrete pillow track switch changes anchor device
Technical field
The utility model relates to the maintenance technical field of railway switch, and specifically a kind of railway concrete pillow track switch changes anchor device.
Background technology
Along with railway speed raising, for adapting to the development of national economy, for adapting to the needs of railway high speed heavy duty, require the strength and stiffness that rail track is higher, railway switch also develops into concrete crosstie by sleeper,, also there are some disadvantages in coming into operation of concrete crosstie, as concrete crosstie side direction station bolt easily fractures, and be difficult for changing, or due to concrete crosstie boatswain chair, cause nylon sleeve internal thread to lose efficacy, station bolt loses connecting forces.
Situation about now losing efficacy for nylon sleeve, the in the past way in work area: 1, with the φ 45mm water consistent with nylon sleeve diameter, bore hot melt nylon sleeve, while doing due to water driller, need water for cooling, the viscosity after nylon melts, tightly be attached to water drilling pipe inwall, frictional force increases, and motor load is excessive, often burns out motor, not at all easy hole of having bored, after drill bit is taken out, the nylon stick of thawing is on drill bit, and extremely difficulty is cleaned out.Because new sleeve pipe is too small with boring gap, no matter adopt epoxy resin or the agent of DB type spike anchoring, new sleeve pipe and the adhesion stress of concrete crosstie are all poor.2, with alloy tool steel bit, along nylon sleeve, cut, retain the helical form silking of nylon when concrete crosstie is pre-buried, be again screwed into the nylon sleeve newly changing.Owing to being screwed in concrete crosstie connecting forces, compared with station bolt and nylon sleeve, to be screwed into rear torsional moment little, loaded onto after iron chair in the past, then change rail, while needing to remove iron chair, due to " working day and night ", needs cutting.
I once applied for for the concrete crosstie track switch station bolt patent of situation that fractures, but cannot solve the situation that nylon sleeve internal thread lost efficacy, the serious corrosion of station bolt sometimes fractureing and cause Broken bolt to take out with silk fetching equipment.
Summary of the invention
For solving the problems of the technologies described above, the utility model provides a kind of railway concrete pillow track switch to change anchor device.
The utility model is achieved through the following technical solutions: a kind of railway concrete pillow track switch changes anchor device, comprises base and for base being fixed on to the securing member on concrete road switch tie; On described base, be connected with the vertical column of hollow that can rotate; The vertical lift device with rocking handle that can move up and down on column is installed on described column; On described vertical lift device, be fixed with output shaft motor straight down; Vertical core drill is installed on described motor output shaft; Described core drill inner diameter is greater than nylon sleeve diameter; Described base two ends respectively have a fastening through-hole, and base lower surface two ends are respectively fixed with inclined side plate; Described base and side plate cross section match with concrete road switch tie section; Described securing member comprises L-type channel-section steel and the connecting rod that is vertically fixed on channel-section steel one end, and connecting rod upper end has screw thread and is provided with the clamp nut coordinating with it.
It is further: described connecting rod is weldingly fixed on channel-section steel one end.
During use, the channel-section steel of two securing members is respectively snapped in to a side of concrete road switch tie, base is placed on concrete road switch tie, the connecting rod of securing member passes the fastening through-hole on base and is fixed together by clamp nut and base.Adjusting vertical lifting device, aims at Broken bolt hole by core drill and carries out perforate, takes out afterwards Broken bolt, nylon sleeve and concrete block.In perforate, put into new nylon sleeve, in the gap between perforate and nylon sleeve, with the agent of DB type spike anchoring, fill fixingly, afterwards, be again screwed into new station bolt after putting backing plate well.
The utility model has the advantage of: the design of base coordinates with concrete road switch tie, fixation, equipment position on concrete road switch tie is firm, and while guaranteeing drill bit work, firmly precisely, equipment is not fragile.Device structure is light, simple to operate, time saving and energy saving, and station bolt or nylon sleeve that energy quick-replaceable damages, increase work efficiency.
Accompanying drawing explanation
Fig. 1 the utility model duty general structure schematic diagram; ,
Fig. 2 is fastener constructions schematic diagram;
Fig. 3 is Fig. 2 top view.
In figure: 1, base; 11, fastening through-hole; 12, side plate; 2, column; 3, vertical lift device; 31, rocking handle; 4, motor; 5, core drill; 6, securing member; 61, channel-section steel; 62, connecting rod; 63, clamp nut; 7, concrete road switch tie.
The specific embodiment
Be below a specific embodiment of the present utility model, now by reference to the accompanying drawings the utility model be further described.
As shown in Figure 1, Figure 2 and Figure 3, a kind of railway concrete pillow track switch changes anchor device, comprises base 1 and for base 1 being fixed on to the securing member 6 on concrete road switch tie 7; On base 1, be connected with the vertical column 2 of the hollow that can rotate; The vertical lift device 3 with rocking handle 31 that can move up and down on column 2 is installed on column 2; On vertical lift device 3, be fixed with output shaft motor 4 straight down; Vertical core drill 5 is installed on described motor 4 output shafts, and core drill 5 is alloy steel core drills; Core drill 5 inner diameters are greater than nylon sleeve diameter; At base 1 two ends, respectively having a fastening through-hole 11, two fastening through-holes 11 is arranged symmetrically with at base 1; Base 1 soffit two ends are respectively fixed with inclined side plate 12, and biside plate 12 is arranged symmetrically with; Base 1 be placed on concrete road switch tie can, base 1 and side plate 12 cross sections match with concrete road switch tie 7 sections, vibrate littlely while guaranteeing core drill work, prevent drill-pipe-sticking-head; Securing member 6 comprises L-type channel-section steel 61 and the connecting rod 62 that is vertically welded in channel-section steel 61 one end, and connecting rod 62 upper ends have screw thread and are provided with the clamp nut 63 coordinating with it.
During use, the channel-section steel of two securing members 6 61 is respectively snapped in to a side bottom surface of concrete road switch tie 7, base 1 is placed on concrete road switch tie 7, and the connecting rod of securing member 6 62 is through 1 fastening through-hole 11 on base and be fixed together by clamp nut 63 and base 1.Adjusting vertical lifting device 3, aims at Broken bolt hole by core drill 5 and carries out perforate, takes out afterwards Broken bolt, nylon sleeve and concrete block.In perforate, put into new nylon sleeve, in the gap between perforate and nylon sleeve, with the agent of DB type spike anchoring, fill fixingly, afterwards, be again screwed into new station bolt after putting backing plate well.

Claims (2)

1. railway concrete pillow track switch changes an anchor device, comprises base (1) and for base (1) being fixed on to the securing member (6) on concrete road switch tie (7); On described base (1), be connected with the vertical column of hollow (2) that can rotate; The vertical lift device (3) with rocking handle (31) that can move up and down on column (2) is installed on described column (2); It is characterized in that: on described vertical lift device (3), be fixed with output shaft motor (4) straight down; On described motor (4) output shaft, vertical core drill (5) is installed; Described core drill (5) inner diameter is greater than nylon sleeve diameter; Described base (1) two ends respectively have a fastening through-hole (11), and base (1) soffit two ends are respectively fixed with inclined side plate (12); Described base (1) and side plate (12) cross section match with concrete road switch tie (7) section; Described securing member (6) comprises L-type channel-section steel (61) and is vertically fixed on the connecting rod (62) of channel-section steel (61) one end, and connecting rod (62) upper end has screw thread and is provided with the clamp nut (63) coordinating with it.
2. railway concrete pillow track switch according to claim 1 changes anchor device, it is characterized in that: described connecting rod (62) is weldingly fixed on channel-section steel (61) one end.
CN201420075535.0U 2014-02-21 2014-02-21 Anchor replacing device for railway concrete sleeper turnout Expired - Fee Related CN203716016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420075535.0U CN203716016U (en) 2014-02-21 2014-02-21 Anchor replacing device for railway concrete sleeper turnout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420075535.0U CN203716016U (en) 2014-02-21 2014-02-21 Anchor replacing device for railway concrete sleeper turnout

Publications (1)

Publication Number Publication Date
CN203716016U true CN203716016U (en) 2014-07-16

Family

ID=51155184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420075535.0U Expired - Fee Related CN203716016U (en) 2014-02-21 2014-02-21 Anchor replacing device for railway concrete sleeper turnout

Country Status (1)

Country Link
CN (1) CN203716016U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017203258A (en) * 2016-05-09 2017-11-16 株式会社関ヶ原製作所 Mobile drilling machine for sleeper
CN110219213A (en) * 2019-06-19 2019-09-10 中铁四院集团岩土工程有限责任公司 Change anchor device and changes anchor method
CN113863070A (en) * 2021-11-05 2021-12-31 中国铁建重工集团股份有限公司 Switch tie recycling system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017203258A (en) * 2016-05-09 2017-11-16 株式会社関ヶ原製作所 Mobile drilling machine for sleeper
CN110219213A (en) * 2019-06-19 2019-09-10 中铁四院集团岩土工程有限责任公司 Change anchor device and changes anchor method
CN113863070A (en) * 2021-11-05 2021-12-31 中国铁建重工集团股份有限公司 Switch tie recycling system

Similar Documents

Publication Publication Date Title
CN203716016U (en) Anchor replacing device for railway concrete sleeper turnout
CN101570971B (en) Rock mass pile foundation pore-forming preboring construction method
CN203248178U (en) Downward-hole self-drilling grouting anchor rod
CN203213000U (en) Cantilever beam structure of landscape plank road
CN201815720U (en) Adjustable drilling die for H-shaped steel web plate
CN201427197Y (en) Upward drilling punching device
CN203755301U (en) Resistance withstanding spiral ground pile
CN1727633A (en) Drill pipe of the center emplacement type jumbolter and construction method
CN214193976U (en) Quick replacement machine tool for high-speed switch tie breaking bolt
CN108729310A (en) It is a kind of to prevent swollen vehice carried watering device for gapless track cooling
CN107642013A (en) A kind of subway route railway roadbed sleeper nylon sleeve crash handling construction method
CN204551751U (en) The syndeton of a kind of new increasing steel beam and concrete column
CN203403337U (en) Railway concrete sleeper turnout anchor switching device
CN2215506Y (en) Drawing out device for screw spike of concrete track sleeper
CN202881938U (en) Ground anchor peg of solar energy photovoltaic power generation device
CN208918568U (en) A kind of mine anchor rod positioning device
CN203393703U (en) Expanded bore device of punching expanded bore filling pile
CN212000394U (en) Sleeper-ballastless track bed anchoring device
CN212000407U (en) Direct current concrete sleeper bolt changes anchor equipment
CN204455745U (en) Railway sleeper bolt weight anchor sucking drilling machine
CN204002548U (en) Embedding rock taper pile impacts drilling pipe hammer system
KR101224136B1 (en) prestressed concrete tie connection equipment and installation method for ballast of railway track
CN110695906A (en) Full hall support dish nut quick adjustment device
CN203654109U (en) Track plate laying positioning frame
CN205128984U (en) Special drilling machine of railway bridge steel bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140716

Termination date: 20170221

CF01 Termination of patent right due to non-payment of annual fee