CN203684721U - Construction structure for repairing of old brick wall - Google Patents

Construction structure for repairing of old brick wall Download PDF

Info

Publication number
CN203684721U
CN203684721U CN201320778108.4U CN201320778108U CN203684721U CN 203684721 U CN203684721 U CN 203684721U CN 201320778108 U CN201320778108 U CN 201320778108U CN 203684721 U CN203684721 U CN 203684721U
Authority
CN
China
Prior art keywords
brick
wall
brushed
metope
brick wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320778108.4U
Other languages
Chinese (zh)
Inventor
刁晓翔
王楠
陆勇
张鑫
张博
刘俊鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN201320778108.4U priority Critical patent/CN203684721U/en
Application granted granted Critical
Publication of CN203684721U publication Critical patent/CN203684721U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a construction structure for repairing of an old brick wall. The construction structure comprises repairing bricks for building the part, which is picked out, chiselled and dug out, of the brick wall; mortar is stuck between a repairing brick and the original wall body; a pointing material is brushed on the pointing position of the wall surface; a first layer of a permeable color paste is brushed to a part which is highly different from the integral wall surface in color; a second layer of a permeable color paste is brushed to the integral wall surface to form a treated wall surface; a brick wall permeable protecting agent is brushed to the whole treated wall surface. The construction structure is convenient and simple, low in construction cost, high in constructability and cohesiveness, low in shrinkage, and free of cracking.

Description

The constructing structure that a kind of second-hand brick wall is repaired
Technical field
The utility model relates to the constructing structure that a kind of metope is repaired, and relates in particular to the constructing structure that a kind of second-hand brick wall is repaired.
Background technology
Past is very many at China's common brick masonry structure building, and wherein single-storey factory building has also accounted for certain proportion.Along with economic development, many common brick masonry structure buildings have all been removed.And have some single-storey factory building structures more firm, and still have at short notice use value, just some position alkalization of exterior wall common brick body of wall, weathering, stained serious, surperficial texture and color aspect also affect attractive in appearance.This just need to simply repair.
Learn the patent of having authorized by retrieval:
Yang Changming, lift a sail, paper " pre-test of Historic Buildings plain brick wall recovery technique " that Wu Weixin writes is not suitable for the reparation of factory building brick wall.
1. application number is: the Chinese patent of CN201210033593.2 discloses " a kind of recovery technique that is subject to salt, alkali to corrode brick wall ", this inventive features is to embed folded sieve of impaired body of wall with some modularization load-bearing small cushion blocks and big cushion block to become weight body, the good body of wall in top is carried out after load-bearing support, draw impaired body of wall, then cram with the new body of wall of segmented the new technology of doing again internal and external ornament surface layer.
The reparation of this patent to segmented body of wall, comprises by concrete and weight body and waters and build up an entirety, and the overhaul of such repair process to building is applicable to this building impaired serious, and this building is prepared long-time use.And be not suitable for factory building short time use, be the reparation of aesthetic to body of wall.
2. application number is: the Chinese patent of CN200710171046.X discloses " historical building clean water red brick wall renovation technique ", and this invention provides a kind of historical building clean water red brick wall renovation technique, to realize the Echtheit reparation of historical building clean water red brick wall.This technique, comprises the steps: 1. cleaning clean water red brick bodies of wall, by the cement mortar overburden stripping of weathering, exposes clean water red brick; 2. adopt high-strength epoxy mortar to repair the crack of clean water red brick masonry; 3. pair damaged jointing is processed and fills up.
3 application numbers are: the Chinese patent of CN200710047916.2 discloses " historical building clean water red brick wall renovation technique ", the invention provides a kind of historical building clean water red brick wall renovation technique, to realize the Echtheit reparation of historical building clean water red brick wall.This technique, comprises the steps: 1. cleaning clean water red brick bodies of wall, by the cement mortar overburden stripping of weathering, exposes clean water red brick; 2. adopt high-strength epoxy mortar to repair the crack of clean water red brick masonry; 3. pair damaged jointing is processed and fills up.
2nd~3 patents are the Echtheit reparations to historical building clean water red brick wall, are not suitable for the reparation of old factory building brick wall.
4. application number is: the Chinese patent of CN201010212800.1 discloses " repairing and reinforcing process of construction cracking member ", a kind of repairing and reinforcing process of construction cracking member, mainly comprise the steps: to prepare appropriate cloth: part is rolled into cloth anchor pole, part is cut into fiber cloth reinforced layer, and part is cut into cloth ground tackle; On cracking member, determine corresponding reinforcement point; Cracking member is forced to restore, beat anchor hole along the reinforcement point of a side to the reinforcement point of opposite side; Cloth ground tackle is pasted on to anchor hole periphery with cementing agent; By cloth anchor pole, through anchor hole, one end is cut into plum blossom-shaped termination and is pasted on cloth ground tackle, pastes fiber cloth reinforced layer in outside, plum blossom-shaped termination; Tighten cloth anchor pole from the other end, and other end termination is also cut into plum blossom-shaped termination, this plum blossom-shaped termination is pasted on cloth ground tackle with cementing agent, fiber cloth reinforced layer is pasted in outside.This patent is to repairing and reinforcing process of construction cracking member, is not suitable for the reparation of old factory building brick wall.
5 application numbers are: the Chinese patent of CN201220576454.X discloses " a kind of brick masonry wall bracing means ", this utility model discloses a kind of brick masonry wall bracing means, the problem that consolidation effect is not good, cost is high and difficulty of construction is large existing to solve existing brick masonry wall bracing means.It comprises: be implanted in some bar dowels in brick masonry wall perpends; And being coated in the high ductility fibrous concrete surface layer of brick masonry wall external surface, described high ductility fibrous concrete surface layer is by coated to brick masonry wall and all bar dowels.This patent is to brick masonry wall bracing means, is not suitable for the reparation of old factory building brick wall.
Summary of the invention
The purpose of this utility model is to overcome the shortcoming of prior art, provide a kind of convenient and simple, construction cost is low, repair old factory building brick wall, makes its brick wall repairing effect all good, body of wall color reaches the effect of restoring the old as the old, the constructing structure that keeps a kind of second-hand brick wall of the style and features of former factory building to repair.
The constructing structure that a kind of second-hand brick wall of the present utility model is repaired; it comprises mending to build at brick wall picks and cuts a hole the benefit brick of excavating position; between described benefit brick and original wall body, be bonded with mortar; be coated with and be brushed with pointing in metope jointing place; be coated with and be brushed with first floor infiltration mill base with the larger position of integral wall face color distinction; on overall metope, be coated with and be brushed with metope after second layer infiltration mill base formation processing, after processing, on metope, entirety is coated with and is brushed with the agent of brick wall osmotic protection.
The utility model structure is convenient and simple, and construction cost is low, application property good, and caking property is strong, low contraction, does not ftracture.Repair old factory building brick wall repairing effect all good, body of wall color reaches the effect of restoring the old as the old, keeps the style and features of former factory building.And save resource.
Brief description of the drawings
Fig. 1 is preprosthetic brick wall metope schematic diagram;
Fig. 2 is the elevation of again cutting the brick of system to picking the cutter position of excavating by the specification of original wall body;
Fig. 3 is the constructing structure schematic diagram that brick wall is repaired.
Detailed description of the invention
The constructing structure that a kind of second-hand brick wall of the present utility model is repaired as shown in drawings; it comprises mending to build at brick wall 1 picks and cuts a hole the benefit brick 2-1 that excavates position; between described benefit brick and original wall body 2, be bonded with mortar; be coated with and be brushed with pointing in metope jointing place 3; be coated with and be brushed with first floor infiltration mill base with the larger position of integral wall face color distinction; on overall metope, be coated with and be brushed with metope 4 after second layer infiltration mill base formation processing, after processing, on metope, entirety is coated with and is brushed with the agent of brick wall osmotic protection.
This construction method is as follows: (1) is cleared up brick wall 1, and cleanup step comprises that effects on surface is stained to the cleaning of polishing of alkalization, weathering, stained serious position Manual angular grinding machine, wire brush labor cleaning is clean at the position of weathering;
(2) to the local crisp alkali of described brick wall metope, damaged serious fragment of brick, pick cutter and mend processing by replacing a damaged part, first with awl, the fragment of brick of needs reparation 2 is put and chiseled out, the area that cutter goes is the integral multiple of single full sized brick;
(3) metope after polishing cleaning is cleaned, remove surperficial stain and floating dust;
(4) mend brick processing to picking the cutter position of excavating, concrete steps are: again cut brickmaking 2-1 by the specification of original wall body, again mend and puzzle same as before after cutting mill with former way, mend between brick and original wall body by mortar back of the body reality; If any should preferentially adopting with the brick second-hand brick of former wall brick same time same model.
(5) to the original jointing 3 material weathering of brick wall, damage or a position that drum drops, adopt the compound method of original pointing, carry out rejointing processing, and new jointing is repaiied to old processing, keep the effect basically identical with original jointing color;
(6) to the larger position of brick wall local color difference after cleaning, adopt the technique of situ configuration infiltration mill base sectional repair brushing, reach the effect basically identical with overall metope;
(7) overall metope is changed colour and does old processing, manually each piece brick is brushed to amendment, after formation processing metope 4(must not overall time the method for spraying or roller coating), make whole color reach the effect of restoring the old as the old.
(8), to metope 4 after treatment, the agent of overall brushing brick wall osmotic protection, to reach protection brick wall, delays the object of weathering, alkalization;

Claims (1)

1. the constructing structure that second-hand brick wall is repaired; it is characterized in that: it comprises mending to build at brick wall picks and cut a hole the benefit brick of excavating position; between described benefit brick and original wall body, be bonded with mortar; be coated with and be brushed with pointing in metope jointing place; be coated with and be brushed with first floor infiltration mill base with the larger position of integral wall face color distinction; on overall metope, be coated with and be brushed with metope after second layer infiltration mill base formation processing, after processing, on metope, entirety is coated with and is brushed with the agent of brick wall osmotic protection.
CN201320778108.4U 2013-11-29 2013-11-29 Construction structure for repairing of old brick wall Expired - Fee Related CN203684721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320778108.4U CN203684721U (en) 2013-11-29 2013-11-29 Construction structure for repairing of old brick wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320778108.4U CN203684721U (en) 2013-11-29 2013-11-29 Construction structure for repairing of old brick wall

Publications (1)

Publication Number Publication Date
CN203684721U true CN203684721U (en) 2014-07-02

Family

ID=51006643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320778108.4U Expired - Fee Related CN203684721U (en) 2013-11-29 2013-11-29 Construction structure for repairing of old brick wall

Country Status (1)

Country Link
CN (1) CN203684721U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019675A (en) * 2015-06-09 2015-11-04 杭州江润科技有限公司 Repairing construction method for grey brick outer wall of ancient building
CN106401094A (en) * 2015-07-22 2017-02-15 江苏大美天第文化产业有限公司 Antique ming dynasty city wall surface processing method
CN109138481A (en) * 2018-09-12 2019-01-04 上海市建筑装饰工程集团有限公司 Historical building exterior wall cobblestone painting metope does old structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019675A (en) * 2015-06-09 2015-11-04 杭州江润科技有限公司 Repairing construction method for grey brick outer wall of ancient building
CN105019675B (en) * 2015-06-09 2018-04-06 杭州江润科技有限公司 Repairing construction method for grey brick outer wall of ancient building
CN106401094A (en) * 2015-07-22 2017-02-15 江苏大美天第文化产业有限公司 Antique ming dynasty city wall surface processing method
CN109138481A (en) * 2018-09-12 2019-01-04 上海市建筑装饰工程集团有限公司 Historical building exterior wall cobblestone painting metope does old structure

Similar Documents

Publication Publication Date Title
CN103590619A (en) Construction method for repairing old brick wall
CN102477797B (en) A kind of construction method preventing infilled wall crack
CN107989401B (en) Existing building outer wall reconstruction structure and construction method
CN103046709B (en) Building construction method of inner wall surface
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN104746772B (en) Ash concrete hollow partition board anti-cracking construction method
CN203684721U (en) Construction structure for repairing of old brick wall
CN108412093B (en) Modern landscape decorative rammed earth wall and construction method thereof
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN107268834A (en) Without construction column combination hollow out plain brick wall and its construction method
CN103410331A (en) Wet combining process for vitrified porcelain tiles
CN105019675B (en) Repairing construction method for grey brick outer wall of ancient building
CN207829511U (en) A kind of existing building external wall reconstruction structure
CN102373666A (en) Method for quickly roughening concrete by retarder flushing
CN204691302U (en) Ancient building blue bricks exterior wall repair structure
CN110306819A (en) A kind of ancient building common brick exterior wall method for repairing and mending
CN108086174B (en) Repairing method of shaping clamp for repairing surface of concrete guardrail
CN104675135B (en) Repairing method of carved stone cave eaves of stone cave temple
CN103774696A (en) Construction process of cement-based permeable-crystallization type waterproof material
CN102888959A (en) Method for constructing external wall by using premixed dry mortar
CN210164074U (en) PTB (polystyrene board) mortar filling assembled type one-way superimposed sheet bottom close-joint structure
CN114575620A (en) Formwork-supporting-free reinforcement high-ductility concrete construction method for masonry reinforcement
CN110005174A (en) Improve the construction method of Machine-blasting mortar plastering quality
CN103291093A (en) Stepped stand building surface layer laying method
CN212154232U (en) Wall body reinforced structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20161129