CN203684238U - Ecological ridge building structure - Google Patents
Ecological ridge building structure Download PDFInfo
- Publication number
- CN203684238U CN203684238U CN201320656620.1U CN201320656620U CN203684238U CN 203684238 U CN203684238 U CN 203684238U CN 201320656620 U CN201320656620 U CN 201320656620U CN 203684238 U CN203684238 U CN 203684238U
- Authority
- CN
- China
- Prior art keywords
- limited field
- fixed mechanism
- hillside
- field fixed
- slope body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Cultivation Of Plants (AREA)
Abstract
The utility model relates to an ecological ridge building structure, which belongs to the technical fields of hillside terrace building, waste disposal area, road blocking and city landscape platform building. The ecological ridge building structure comprises a hillside body, wherein limited field fixing mechanisms are arranged on the hillside body, and are arrayed on the hillside body in order so as to enable the hillside body to form a plurality of layers; a sealed supporting mechanism is arranged on each limited field fixing mechanism; each layer of hillside body is in a horizontal plane, and a side face is arranged on each limited field fixing mechanism; a vegetable layer covering the limited field fixing mechanisms and the sealed supporting mechanisms is planted on the side face of each hillside face. The utility model provides the ecological ridge building structure, which has larger structural strength and certain impact resistance, has a favorable effect in protecting ecology landscapes, and can well prevent water and soil loss.
Description
Technical field
the utility model belongs to hillside terraced fields to be built, and Dumping Sites and highway are blocked, and the technical field that also has civic landscape platform to build, relates in particular to a kind of ecology and build bank structure.
Background technology
existing terraced fields are all that reserved one deck and hillside are linked to be an overall sizing surrounding edge on hillside, and technical difficulty of this reserved surrounding edge of shaping is larger; Passing through of also having piled up sizing surrounding edge on hillside, and the structural strength of this sizing surrounding edge of piling up is inadequate, the caving in of the surrounding edge that is easy to cause to shape; If only have soil to pile up to form can cause the shaping toughness of surrounding edge inadequate, the surrounding edge that makes to shape can not produce elastic buffer in the time being subject to external impacts, thereby can not protect the integrality after external force is interfered that is subject to of sizing surrounding edge.And above-mentioned sizing surrounding edge cannot well solve the situation of the soil erosion of whole terraced fields.Simultaneously traffic water conservancy mine Deng's Dumping Sites engineering, civic landscape platform are built etc., large multiplex build stone or concreting, and cost is high, ecoscape weak effect.
Utility model content
it is larger that the purpose of this utility model is to provide structural strength, has certain impact resistance, and the protection of ecoscape is produced to good result, and the ecology that can well prevent erosion is built bank structure.
above-mentioned technical purpose of the present utility model is achieved by the following technical programs: a kind of ecology is built bank structure, comprise slope body, on the body of described slope, limited field fixed mechanism is set, described limited field fixed mechanism proper alignment on the body of described slope makes described cyphosomatic become some layers; On described limited field fixed mechanism, airtight supporting mechanism is set, the described slope body of every one deck is horizontal plane and has a side at described limited field fixed mechanism place, and on the body side surface of described slope, plantation covers the vegetable layer of described limited field fixed mechanism and described airtight supporting mechanism.
as preferably, described limited field fixed mechanism is campshed, and described campshed gos deep into 70-80cm in the body of described slope, above the body of described slope, leaves 80-120cm; And each diameter of described campshed is respectively 10-15cm.
as preferably, described airtight supporting mechanism is connected with described limited field fixed mechanism by being detachably fixedly connected with mechanism, described airtight supporting mechanism gos deep into evenly distributedly in the body direction of described slope having somely at described limited field fixed mechanism, leaves respectively the interval of a 2-4cm between some described airtight supporting mechanisms.
as preferably, in the body side surface of described slope, be mounted with the hybrid particles that the fertile particle of retaining ventilation particle and bio-organic stirs into, and the particle diameter of described retaining ventilation particle is between 2-4cm, the particle diameter of the fertile particle of described bio-organic is between 1-3mm.
as preferably, the thickness of described airtight supporting mechanism is 1-2cm, is arranged on described limited field fixed mechanism one side.
manufacture above-mentioned ecology and build the method for bank structure,
1) can identify sign in the body setting of described slope, described slope body is divided into some layers by the described sign of identifying, and in the described marked position of identifying, fixed pedestal is set;
2) in the described described fixed pedestal of identifying sign, limited field fixed mechanism is set;
3) on described limited field fixed mechanism, airtight supporting mechanism is set;
4) the described slope body between described limited field fixed mechanism is arranged to the ground of level; Described airtight supporting mechanism is used for the ground that prevents the soil losses in horizontal soil ground and support described level;
5) in the soil horizon of described airtight supporting mechanism side, put into the fertile hybrid particles stirring into of described retaining ventilation particle and described bio-organic;
6) on described side, plant described vegetable layer and be used for preventing soil loss, reinforce the surrounding edge on horizontal soil ground; Described vegetable layer is set in the interval of described airtight supporting mechanism.
7) leave sizing surrounding edge in described side surrounding;
8) cultivating described liana makes it cover described sizing surrounding edge surface.
as said method preferably, guide the staggered growth of stem of described vegetable layer to cover described limited field fixed mechanism; Guide the root lateral growth of described vegetable layer to be cross-linked, make at the outside biological fixation layer that forms of described limited field fixed mechanism by being cross-linked with being cross-linked of root of described vegetable layer of stem of described vegetable layer.
as said method preferably, described sizing surrounding edge is carried out to whole rammer processing, thereby makes have certain adhesion stress to prevent from running off between soil.
as said method preferably, laying the described vegetable layer initial stage, need carry out permeable processing to 10 days to level ground surrounding in every 6 days, carry out single-dose application after spending 25-30 days and guarantee liana normal growth.
in sum, the utlity model has following beneficial effect: on the body of slope, arrange limited field fixed mechanism can be in advance the shape to terraced bank and size shape, can estimate cost and the output of whole terraced bank, airtight supporting mechanism the soil erosion that can prevent tread is set, arranging of vegetable layer can be reinforced and increase toughness terraced bank side, can also guarantee that thereby this ladder bank side can dry and crackedly not cause whole terraced bank side to cave in, and arranging of campshed can guarantee that there are enough support strengths terraced bank side, interval between airtight supporting mechanism arranges the growth that can guarantee vegetable layer, make enough strength support ladder bank sides, ramming processing can make terraced bank side have enough intensity, for preventing from being unfavorable for after ramming from processing the growth of vegetable layer, retaining ventilation particle is set in terraced bank.
Accompanying drawing explanation
fig. 1 is side sectional view of the present utility model;
in Fig. 1,1-slope body, 2-limited field fixed mechanism, the airtight supporting mechanism of 3-, the 4-surrounding edge of shaping, 5-is detachably fixedly connected with mechanism, 6-vegetable layer.
The specific embodiment
below in conjunction with accompanying drawing, the utility model is described in further detail.
ecology is as shown in Figure 1 built bank structure, comprise slope body 1, limited field fixed mechanism 2 is set on slope body 1, limited field fixed mechanism 2 proper alignment on slope body 1 makes body 1 in the vertical direction in slope form some layers, limited field fixed mechanism 2 is campshed, campshed gos deep into the interior 75cm of slope body 1, above slope body 1, leaves 100cm; And each diameter of campshed is respectively 10cm; Airtight supporting mechanism 3 is set on limited field fixed mechanism 2, and the thickness of airtight supporting mechanism 3 is 1cm, is arranged on limited field fixed mechanism 2 one sides.Airtight supporting mechanism 3 is connected with limited field fixed mechanism 2 by being detachably fixedly connected with mechanism 5, airtight supporting mechanism 3 gos deep into evenly distributedly in slope body 1 direction having somely at limited field fixed mechanism 2, leaves respectively the interval of a 2cm between some airtight supporting mechanisms 3.The slope body 1 of every one deck is horizontal plane and has a side at limited field fixed mechanism 2 places, plant respectively up and down the vegetable layer 6 of coverage limitation scope fixed mechanism 2 and airtight supporting mechanism 3 in slope body 1 side, for guaranteeing vegetable layer 6 normal growths, in slope body 1 side, be mounted with the hybrid particles that the fertile particle of retaining ventilation particle and bio-organic stirs into, and the particle diameter of retaining ventilation particle is 2cm, and the particle diameter of the fertile particle of bio-organic is 2mm.
manufacture above-mentioned ecology and build the method for bank structure,
1) can identify sign slope body 1 setting, can identify to indicate described slope body 1 is vertically divided into some layers, fixed pedestal is set can identify marked position;
2) limited field fixed mechanism 2 is set in the fixed pedestal that can identify sign;
3) airtight supporting mechanism 3 is set on limited field fixed mechanism 2;
4) the slope body 1 between limited field fixed mechanism 2 is arranged to the ground of level; Airtight supporting mechanism 3 is for preventing soil losses in horizontal soil ground the ground of support level;
5) in the soil horizon of airtight supporting mechanism 3 sides, put into the fertile hybrid particles stirring into of retaining ventilation particle and bio-organic;
6) on side, plant vegetable layer 6 for preventing soil loss, reinforce the surrounding edge on horizontal soil ground; Vegetable layer 6 is set in the interval of airtight supporting mechanism 3.This vegetable layer 6 has the vine that is arranged on terraced bank below and the sagging plant that is arranged on terraced bank top.By the staggered growth of the stem coverage limitation scope fixed mechanism 2 of two Plants; The root lateral growth of guiding vegetable layer 6 is cross-linked, and makes at the outside biological fixation layer that forms of limited field fixed mechanism 2 by being cross-linked with being cross-linked of root of vegetable layer 6 of stem of vegetable layer 6.
7) leave sizing surrounding edge 4 in side surrounding; Sizing surrounding edge 4 is carried out to whole rammer processing, thereby make have certain adhesion stress to prevent from running off between soil.
8) cultivating liana makes it cover sizing surrounding edge 4 surfaces.Laying 6 initial stages of vegetable layer, needs carry out permeable processing to 10 days to level ground surrounding in every 6 days, excessively after 25-30 days, carried out single-dose application and guaranteed liana normal growth.
this specific embodiment is only to explanation of the present utility model; it is not to restriction of the present utility model; those skilled in the art are reading after this manual and can make to the present embodiment the modification that there is no creative contribution as required, but as long as within the scope of claim of the present utility model, are all subject to the protection of Patent Law.
Claims (4)
1. an ecology is built bank structure, comprise slope body (1), it is characterized in that, limited field fixed mechanism (2) is set on described slope body (1), described limited field fixed mechanism (2) makes described slope body (1) form some layers in the upper proper alignment of described slope body (1); Airtight supporting mechanism (3) is set on described limited field fixed mechanism (2), the described slope body (1) of every one deck is horizontal plane and has located a side at described limited field fixed mechanism (2), and on described slope body (1) side, plantation covers the vegetable layer (6) of described limited field fixed mechanism (2) and described airtight supporting mechanism (3).
2. a kind of ecology according to claim 1 is built bank structure, it is characterized in that, described limited field fixed mechanism (2) is campshed, and described campshed gos deep into the interior 70-80cm of described slope body (1), leaves 80-120cm in described slope body (1) top; And each diameter of described campshed is respectively 10-15cm.
3. a kind of ecology according to claim 2 is built bank structure, it is characterized in that, described airtight supporting mechanism (3) is connected with described limited field fixed mechanism (2) by being detachably fixedly connected with mechanism (5), described airtight supporting mechanism (3) gos deep into evenly distributedly in described slope body (1) direction having somely at described limited field fixed mechanism (2), leaves respectively the interval of a 2-4cm between some described airtight supporting mechanisms (3).
4. a kind of ecology according to claim 3 is built bank structure, it is characterized in that, the thickness of described airtight supporting mechanism (3) is 1-2cm, is arranged on described limited field fixed mechanism (2) one sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320656620.1U CN203684238U (en) | 2013-10-24 | 2013-10-24 | Ecological ridge building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320656620.1U CN203684238U (en) | 2013-10-24 | 2013-10-24 | Ecological ridge building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203684238U true CN203684238U (en) | 2014-07-02 |
Family
ID=51006161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320656620.1U Expired - Fee Related CN203684238U (en) | 2013-10-24 | 2013-10-24 | Ecological ridge building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203684238U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541367A (en) * | 2013-10-24 | 2014-01-29 | 安吉绿源生态科技有限公司 | Ecological bank building structure |
-
2013
- 2013-10-24 CN CN201320656620.1U patent/CN203684238U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541367A (en) * | 2013-10-24 | 2014-01-29 | 安吉绿源生态科技有限公司 | Ecological bank building structure |
CN103541367B (en) * | 2013-10-24 | 2016-03-09 | 安吉绿源生态科技有限公司 | A kind of ecology builds bank structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101502223A (en) | Slope soil-establishing greening apparatus and method | |
CN202577790U (en) | Roof greening structure | |
CN102720308A (en) | Roof greening structure | |
CN104328766A (en) | Ecological stone cage net box retaining wall and construction method | |
CN103437370A (en) | Method and supporting structure for slip resisting and soil retaining of abrupt slope | |
CN106087632A (en) | A kind of laying brick having both row's water storage function based on sponge urban construction | |
CN105756073A (en) | Ecological slope protection building block of ion type rare earth mine and ecological slope protection system of ion type rare earth mine | |
CN207130749U (en) | Ecological treatment of slope protective slope structure | |
CN202918755U (en) | Energy-saving ecological garden type greening system for high-rise building | |
CN204059376U (en) | The slope protection greening structure of the steep exposed rock side slope of a kind of urgency | |
CN108612047A (en) | A kind of ecological maintenance structure of river and lake bank slope | |
CN203684238U (en) | Ecological ridge building structure | |
CN211340642U (en) | Link plate formula shore protection structure that faces combination forever | |
CN205277434U (en) | Tunnel portal pre -reinforcing structure | |
CN205171532U (en) | Permanent side slope supporting construction | |
CN206052484U (en) | A kind of ecological permeable plants terrace | |
CN107044108A (en) | A kind of green steel face bank protection and its manufacture method | |
CN208039168U (en) | A kind of ecological maintenance structure of river and lake bank slope | |
CN103518503A (en) | Source wind control, power generation, desertification control and haze reduction system | |
CN206189446U (en) | Retaining wall with plant groove | |
CN202850038U (en) | Ecological composite slope protection plate and slope protective structure | |
CN103541367B (en) | A kind of ecology builds bank structure | |
CN205822150U (en) | A kind of irrigation canal bank protection prefabricated component of band animal passway for escaping | |
CN201915413U (en) | Flexible grid for steep slope protection | |
CN202925515U (en) | Vetiver grass double layer reinforced composite vegetation hydro-fluctuation belt flexible plate protection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140702 Termination date: 20211024 |