CN203684226U - 一种改进后逆作钢管柱的垂直控制装置 - Google Patents

一种改进后逆作钢管柱的垂直控制装置 Download PDF

Info

Publication number
CN203684226U
CN203684226U CN201320667497.3U CN201320667497U CN203684226U CN 203684226 U CN203684226 U CN 203684226U CN 201320667497 U CN201320667497 U CN 201320667497U CN 203684226 U CN203684226 U CN 203684226U
Authority
CN
China
Prior art keywords
steel pipe
pipe column
control device
vertical control
down steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320667497.3U
Other languages
English (en)
Inventor
苏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201320667497.3U priority Critical patent/CN203684226U/zh
Application granted granted Critical
Publication of CN203684226U publication Critical patent/CN203684226U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种改进后逆作钢管柱的垂直控制装置,包括逆作钢管柱和牛腿,在牛腿四个轴线方向设置预留测垂孔,并在负一层牛腿与前牛腿对应垂直位置设置激光铅垂仪定位靶,本实用新型在地面就能实现对逆作钢管柱的垂直度测量和调整,大大减轻了施工工序和难度,本实用新型结构简单牢固、操作方便、能节省施工工期,节约工程造价。

Description

一种改进后逆作钢管柱的垂直控制装置
技术领域
本实用新型涉及一种改进后逆作钢管柱的垂直控制装置,属于土建施工装置领域。 
背景技术
随着我国建筑业的不断发展,各类建筑型式不断涌现,超大超深工程越来越多,常规工程逆作法施工中,旋挖桩和逆作钢管柱是分二次施工,待旋挖桩完成预留钢管定位器进行二次浇筑固定,传统方法有利用测斜管,但操作不方便。这种作法造成较大浪费,不满足目前国家节能减排的思路,且传统对钢管柱的垂直度控制精度不高,有时还需要下入孔桩中对其进行校正,因此现有技术方案不是很理想。 
实用新型内容
本实用新型的目的在于,提供一种能直接在地面上实现对逆作钢管柱进行垂直度校正的改进后逆作钢管柱的垂直控制装置置,以解决目前在逆做法施工中逆作钢管柱垂直度控制精度不高,且操作繁琐的问题,从而克服现有技术的不足。 
本实用新型的技术方案: 
一种改进后逆作钢管柱的垂直控制装置,包括逆作钢管柱和牛腿,在牛腿四个轴线方向设置预留测垂孔,并在负一层牛腿与前牛腿对应垂直位置设置激光铅垂仪定位靶。 
与现有技术相比,本实用新型适用在土建施工中的逆作法施工,特别适合超大超深工程中的逆作法施工,通过本实用新型中预留测垂孔和激光铅垂仪定位靶,可检测逆作钢管柱是否垂直,若激光铅垂仪定位靶发的激光能通过对应垂直位置的预留侧垂孔,则确定逆作钢管 柱垂直,反之不能,通过本实用新型,在地面就能实现对逆作钢管柱的垂直度测量和调整,大大减轻了施工工序和难度,本实用新型结构简单牢固、操作方便、能节省施工工期,节约工程造价。 
附图说明
图1是本实用新型结构示意图; 
图2是本实用新型A-A示意图 
图3是本实用新型具体施工图。 
1-逆作钢管柱、2-牛腿、3-预留测垂孔、4-负一层牛腿、5-激光铅垂仪定位靶。 
具体实施方式
下面结合附图对本实用新型作进一步的详细说明,但不作为对本实用新型的任何限制。 
一种改进后逆作钢管柱的垂直控制装置,包括逆作钢管柱1和牛腿2,其中在牛腿四个轴线方向设置预留测垂孔3,并在负一层牛腿4与牛腿2对应垂直位置设置激光铅垂仪定位靶5。 
所述该改进后逆作钢管柱的安装固定装置具体施工步骤为如下: 
1、首先通过钢支撑架下层平台上横向控制千斤顶对逆作钢管柱施加侧向推力,从而改变逆作钢管柱的倾斜角,使逆作钢管柱垂直度达到要求。于牛腿4个轴线方向设置L50角钢预留测垂孔,并在负一层牛腿与前一牛腿对应垂直位置设置激光铅垂仪定位靶,在制作厂内校准完毕。 
2、安装时使用激光铅垂仪通过测垂孔投射至定位靶进行垂直度测量逆作钢管柱对中后,在逆作钢管柱4个方向分别用铅垂仪测量,根据测量数据利用千斤顶进行调校,直至垂直度确保满足规范要求。逆作钢管柱顶端轴线及柱身垂直度均满足要求后通过刚支撑架上端连接 梁及钢护筒下端支撑板进行逆作钢管柱的最终固定。 

Claims (1)

1. 一种改进后逆作钢管柱的垂直控制装置:包括逆作钢管柱(1)和牛腿(2),其特征在于:在牛腿四个轴线方向设置预留测垂孔(3),并在负一层牛腿(4)与前牛腿对应垂直位置设置激光铅垂仪定位靶(5)。
CN201320667497.3U 2013-10-28 2013-10-28 一种改进后逆作钢管柱的垂直控制装置 Expired - Fee Related CN203684226U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320667497.3U CN203684226U (zh) 2013-10-28 2013-10-28 一种改进后逆作钢管柱的垂直控制装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320667497.3U CN203684226U (zh) 2013-10-28 2013-10-28 一种改进后逆作钢管柱的垂直控制装置

Publications (1)

Publication Number Publication Date
CN203684226U true CN203684226U (zh) 2014-07-02

Family

ID=51006149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320667497.3U Expired - Fee Related CN203684226U (zh) 2013-10-28 2013-10-28 一种改进后逆作钢管柱的垂直控制装置

Country Status (1)

Country Link
CN (1) CN203684226U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625424A (zh) * 2015-12-21 2016-06-01 济南轨道交通集团有限公司 用于控制矩形牛腿桩垂直度和方位角的装置及施工方法
CN106801470A (zh) * 2017-03-21 2017-06-06 中国五冶集团有限公司 一种快速就位的柱脚锚栓结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625424A (zh) * 2015-12-21 2016-06-01 济南轨道交通集团有限公司 用于控制矩形牛腿桩垂直度和方位角的装置及施工方法
CN106801470A (zh) * 2017-03-21 2017-06-06 中国五冶集团有限公司 一种快速就位的柱脚锚栓结构

Similar Documents

Publication Publication Date Title
CN203603586U (zh) 设备支柱调节装置
CN103114732B (zh) 铸钢相贯管节点空间定位方法
CN103954229B (zh) 一种地下硐室全断面变形自动监测设备及应用所述设备的方法
CN110219326B (zh) 逆作法一柱一桩水下调垂施工工艺
CN104141301A (zh) 在旋挖桩孔内安装逆作钢管柱的施工方法及结构
CN104328799A (zh) 一种盖挖逆作法地铁车站钢管柱精确定位方法
CN203891009U (zh) 在旋挖桩孔内安装逆作钢管柱的结构
CN210238595U (zh) 逆作法一柱一桩水下调垂施工装置
CN203857958U (zh) 一种巷道全断面变形监测装置
CN105202261A (zh) 测控顶管顶进方向的装置及其使用方法
CN208604645U (zh) 一种竖向圆柱管孔任意点中心测量装置
CN203684226U (zh) 一种改进后逆作钢管柱的垂直控制装置
CN201650319U (zh) 一种锚杆角度安装器
CN103451338A (zh) 高炉煤气系统上升管及五通球安装方法
CN204163120U (zh) 基坑开挖围护结构顶变形监测装置
CN104121897B (zh) 卫星定位测量杆
CN105544982A (zh) 一种双曲面扭转钢柱施工方法
CN204944456U (zh) 墙柱模板垂直度激光检测仪
CN204479605U (zh) 井下加速度计方位自动调整定位装置
CN210831214U (zh) 一种测绘工程用三脚架
CN204139619U (zh) 用于巨柱吊装安装的支架
CN210221089U (zh) 一种用于测绘仪的支撑架
CN203256744U (zh) 逆作法钢管混凝土柱垂直度校正装置
CN202865849U (zh) 框架逆作法中一柱一桩垂直度的反导向控制装置
CN205530263U (zh) 一种用于钢管围护桩施工的定位器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20211028