CN203684208U - Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece - Google Patents

Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece Download PDF

Info

Publication number
CN203684208U
CN203684208U CN201320743226.1U CN201320743226U CN203684208U CN 203684208 U CN203684208 U CN 203684208U CN 201320743226 U CN201320743226 U CN 201320743226U CN 203684208 U CN203684208 U CN 203684208U
Authority
CN
China
Prior art keywords
pile
prefabricated tubular
tubular pile
wall
hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320743226.1U
Other languages
Chinese (zh)
Inventor
苏航州
靳柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201320743226.1U priority Critical patent/CN203684208U/en
Application granted granted Critical
Publication of CN203684208U publication Critical patent/CN203684208U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a prefabricated tubular pile used for constructing roads and bridges and with an externally-extending rod piece. The prefabricated tubular pile comprises a hollow pile wall and a steel tube with a tapered bottom end, wherein the steel tube with the tapered bottom end is detachably arranged in the hollow pile wall; an L-shaped fin strip is hinged with the inner wall of the hollow pile wall; the L-shaped fin strip comprises an extruding section and a puncturing section; the end part of the extruding section is hinged with the inner wall of the hollow pile wall; the end part of the puncturing section is in a spine shape; through holes are formed at a position, corresponding to the end part of the puncturing section of the L-shaped fin strip, in the inner wall of the hollow pile wall; the puncturing section penetrates through the through hole to be punctured into a foundation at the periphery of the prefabricated tubular pile. According to the prefabricated tubular pile, the rough degree and the irregular degree of the side face of the prefabricated tubular pile are greatly increased under the condition of smoothly sinking the pile, the vertical bearing capacity of the prefabricated tubular pile and the antidumping capability of the pile can be effectively improved, the stability of the prefabricated tubular pile is improved and the sinking of a pile body is reduced.

Description

A kind of prefabricated tubular pile with overhanging rod member of building for road and bridge
Technical field
The utility model belongs to bridge field, relates to prefabricated tubular pile, is specifically related to a kind of prefabricated tubular pile with overhanging rod member of building for road and bridge.
Background technology
Prefabricated tubular pile is as the one of preformed pile, and its form of construction work all adopts the pile-sinking method of preformed pile, in order to increase the bearing capacity of prefabricated tubular pile, generally adopts at present an increase stake mode long or stake footpath to realize.But stake increase long or a footpath can make, pile sinking is more difficult and cost is higher.
If neither to increase stake long, the situation that does not also increase a footpath gets off to increase the bearing capacity of prefabricated tubular pile, can realize by increasing prefabricated tubular pile side degree of roughness or degree of irregularity.At pile body outer wall, overhanging thing being set is exactly one of its mode.At present, due to the set-up mode of overhanging thing and the restriction of design, overhanging thing is generally extruded difficulty and its overhang upper limit and only limits to the radius of stake in the time of practice of construction.
Summary of the invention
The deficiency existing for prior art, the purpose of this utility model is, a kind of prefabricated tubular pile with overhanging rod member of building for road and bridge is provided, this prefabricated tubular pile can reduce greatly the degree of difficulty of extruding overhanging rod member in the situation that ensureing smooth pile sinking, and make overhanging rod member can adapt to asymmetrical set-up mode, thereby the upper limit of rod member overhang is at least risen to the diameter of stake.
In order to realize above-mentioned task, the utility model adopts following technical scheme to be achieved:
A kind of prefabricated tubular pile with overhanging rod member of building for road and bridge, comprise the steel pipe that hollow pile lining and bottom are tapered, the tapered steel pipe in bottom is removably disposed in hollow pile lining, on the inwall of described hollow pile lining, be hinged with L-type wing bar, described L-type wing bar comprises extruded segment and puncture section, one end of extruded segment and the inwall of hollow pile lining are hinged, on the other end of extruded segment, be provided with puncture section, the end of puncture section is spininess, on the inwall of hollow pile lining, be provided with through hole with the corresponding position, puncture section end of type wing bar, puncture section is thrust in prefabricated tubular pile ground around through through hole.
The utility model also has following technical characterictic:
Described L-type wing bar symmetry is hinged on the inwall of hollow pile lining.
On the described asymmetric inwall that is hinged on hollow pile lining of L-type wing bar.
Described puncture section is circular-arc.
The utility model compared with prior art, has following technological merit:
Prefabricated tubular pile of the present utility model can increase greatly degree of roughness and the degree of irregularity of prefabricated tubular pile side in the situation that ensureing smooth pile sinking; Can reduce greatly the degree of difficulty of extruding overhanging rod member, and make overhanging rod member can adapt to asymmetrical set-up mode, thus by the upper limit of rod member overhang at least rise to stake diameter; Can effectively improve the vertical bearing capacity of prefabricated tubular pile and the resistance to capsizing of stake, improve the stability of prefabricated tubular pile and reduce pile body settlement.
Brief description of the drawings
Fig. 1 is the prefabricated tubular pile structural representation of L-type wing bar while being symmetrical arranged.
Fig. 2 is the schematic diagram before the L-type wing bar of L-type wing bar while being symmetrical arranged stretches out.
Fig. 3 is the schematic diagram after the L-type wing bar of L-type wing bar while being symmetrical arranged stretches out.
The structural representation of prefabricated tubular pile when Fig. 4 is asymmetric setting of L-type wing bar.
Schematic diagram before L-type wing bar when Fig. 5 is asymmetric setting of L-type wing bar stretches out.
The schematic diagram that L-type wing bar part when Fig. 6 is asymmetric setting of L-type wing bar is stretched out.
In figure, the implication of each label is: the hollow pile lining of 1-, the steel pipe that 2-bottom is tapered, 3-L type wing bar, 4-through hole, 5-extruded segment, 6-puncture section.
Below in conjunction with drawings and Examples, particular content of the present utility model is described in more detail.
Detailed description of the invention
Below provide specific embodiment of the utility model, it should be noted that the utility model is not limited to following specific embodiment, all equivalents of doing on present techniques scheme basis all fall into protection domain of the present utility model.
Defer to technique scheme, as shown in Figures 1 to 5, the present embodiment provides a kind of prefabricated tubular pile with overhanging rod member of building for road and bridge, comprise the steel pipe 2 that hollow pile lining 1 and bottom are tapered, the tapered steel pipe 2 in bottom is removably disposed in hollow pile lining 1, on the inwall of described hollow pile lining 1, be hinged with L-type wing bar 3, described L-type wing bar 3 comprises extruded segment 5 and puncture section 6, the inwall of one end of extruded segment 5 and hollow pile lining 1 is hinged, on the other end of extruded segment 5, be provided with puncture section 6, the end of puncture section 6 is spininess, on the inwall of hollow pile lining 1, be provided with through hole 4 with the puncture section 6 corresponding positions, end of L-type wing bar 3, puncture section 6 is thrust in prefabricated tubular pile ground around through through hole 4.
L-type wing bar 3 symmetries are hinged on the inwall of hollow pile lining 1.
On the asymmetric inwall that is hinged on hollow pile lining 1 of L-type wing bar 3.
Puncture section 6 is circular-arc.Circular-arc is in order to ensure puncture section 6 soil body of ground around the single-point puncture all the time of its spiny end in the rotation process of L-type wing bar 3.Puncture section 6 head and the tail ends all on same circular arc, thereby ensured single-point puncture.
The angle that when tapering of tapered steel pipe 2 bottoms, bottom does not stretch out hollow pile lining 1 with L-type wing bar 3, extruded segment 5 and hollow pile lining 1 form equates.So can more easily the puncture section 5 of L-type wing bar 3 be squeezed in prefabricated tubular pile ground around.
Use procedure of the present utility model is as described below:
One, the through hole on hollow pile lining 14 is carried out to necessary blocking, in case hollow pile lining 1 affects pile lining sinking because the Gravitative Loads of vibrations and L shaped wing bar 3 makes puncture section 6 pass in advance through hole sinking in ground process.It is to be noted: the through hole 4 blocking must be after pile sinking completes under pressure or impact force the section of being punctured 6 pass.
Two, utilize pile driver or other sinking apparatus and pile-sinking method that hollow pile lining 1 is sunk in ground.
Three, after hollow pile lining 1 installation, steel pipe tapered bottom 2 is inserted in hollow pile lining 1, is inserted in process and need on the tapered steel pipe 2 in bottom, applies necessary pressure or impact force.When in bottom, the tapered lower end of tapered steel pipe 2 contacts with extruded segment 5, the tapered lower end of the tapered steel pipe 2 in bottom will be exerted pressure or impact force to extruded segment 5, extruded segment 5 is rotated the pin joint around its end under the effect of pressure or impact force, thereby makes whole L shaped wing bar 3 that rotation occur.Due to puncture section 6 is curved and its arc radius be just in time the pin joint of extruded segment 5 ends to the distance of through hole 4, therefore in rotation process, puncture section 6 just will pass that through hole 4 thrusts in the foundation soil around hollow pile lining 1 and not with soil body generation dissection.After the tapered steel pipe 2 in its bottom is inserted in hollow pile lining 1 completely, extruded segment 5 will be vertical shape completely, and puncture section 6 has just been thrust in hollow pile lining 1 foundation soil around completely.
Four, after the tapered steel pipe 2 in bottom has been inserted in, steel pipe tapered bottom 2 and hollow pile lining 1 is fixed and is not taken out, to prevent L shaped wing bar 3 rotating backward in the prefabricated tubular pile course of work.
Five, in the space forming at the tapered steel pipe 2 of hollow pile lining 1 and bottom concrete perfusion for the gap around shutoff through hole 4 to meet requirement for anticorrosion.

Claims (4)

1. the prefabricated tubular pile with overhanging rod member of building for road and bridge, comprise the steel pipe (2) that hollow pile lining (1) and bottom are tapered, the tapered steel pipe (2) in bottom is removably disposed in hollow pile lining (1), it is characterized in that, on the inwall of described hollow pile lining (1), be hinged with L-type wing bar (3), described L-type wing bar (3) comprises extruded segment (5) and puncture section (6), the inwall of one end of extruded segment (5) and hollow pile lining (1) is hinged, on the other end of extruded segment (5), be provided with puncture section (6), the end of puncture section (6) is spininess, on the inwall of hollow pile lining (1), be provided with through hole (4) with the corresponding position, puncture section (6) end of L-type wing bar (3), puncture section (6) is thrust in prefabricated tubular pile ground around through through hole (4).
2. the prefabricated tubular pile with overhanging rod member of building for road and bridge as claimed in claim 1, is characterized in that, described L-type wing bar (3) symmetry is hinged on the inwall of hollow pile lining (1).
3. the prefabricated tubular pile with overhanging rod member of building for road and bridge as claimed in claim 1, is characterized in that, on the described asymmetric inwall that is hinged on hollow pile lining (1) of L-type wing bar (3).
4. the prefabricated tubular pile with overhanging rod member of building for road and bridge as described in claims 1 to 3 any one claim, is characterized in that, described puncture section (6) is circular-arc.
CN201320743226.1U 2013-11-20 2013-11-20 Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece Expired - Fee Related CN203684208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320743226.1U CN203684208U (en) 2013-11-20 2013-11-20 Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320743226.1U CN203684208U (en) 2013-11-20 2013-11-20 Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece

Publications (1)

Publication Number Publication Date
CN203684208U true CN203684208U (en) 2014-07-02

Family

ID=51006131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320743226.1U Expired - Fee Related CN203684208U (en) 2013-11-20 2013-11-20 Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece

Country Status (1)

Country Link
CN (1) CN203684208U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254917A (en) * 2020-03-13 2020-06-09 东南大学 Quick-acting expanded steel pipe pile and construction method thereof
CN113775092A (en) * 2021-11-12 2021-12-10 中冶建筑研究总院有限公司 Assembled composite floor system of steel beam support precast slab in shape of Chinese character 'wang' and building thereof
CN113832871A (en) * 2021-07-30 2021-12-24 浙江理工大学 Arch bridge reinforcing method based on corrugated steel plate

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254917A (en) * 2020-03-13 2020-06-09 东南大学 Quick-acting expanded steel pipe pile and construction method thereof
CN113832871A (en) * 2021-07-30 2021-12-24 浙江理工大学 Arch bridge reinforcing method based on corrugated steel plate
CN113775092A (en) * 2021-11-12 2021-12-10 中冶建筑研究总院有限公司 Assembled composite floor system of steel beam support precast slab in shape of Chinese character 'wang' and building thereof
CN113775092B (en) * 2021-11-12 2022-02-08 中冶建筑研究总院有限公司 Assembled composite floor system of steel beam support precast slab in shape of Chinese character 'wang' and building thereof
CN114263169A (en) * 2021-11-12 2022-04-01 中冶建筑研究总院有限公司 Steel pipe pile
CN114263169B (en) * 2021-11-12 2023-06-20 中冶建筑研究总院有限公司 Steel pipe pile

Similar Documents

Publication Publication Date Title
CN203684208U (en) Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece
CN205205875U (en) Underground continuous wall rubber tape water joint case
CN105064922A (en) Reamer bit for abrasion drill
CN211256699U (en) Cast-in-place beam concrete maintenance car
CN203007935U (en) Concrete pile joint with variable cross-sections
CN203347801U (en) Large-section tunnel cross section structure
CN203947468U (en) A kind of Near Ground place expands the compacted bearing disk pile of section
CN204457446U (en) A kind of long auger pressure fills with helical burr ram drill bit
CN207163459U (en) A kind of ground settlement point arrangement apparatus for settlement monitoring
CN102644266B (en) Method utilizing fracture anchor rod piles for reinforcing soft soil stratum pavements in abutment areas
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN204959733U (en) Bored concrete pile steel reinforcement cage structure
CN203948036U (en) The fan-shaped stand of self-propelled of fluid,matching drilol press boring
CN102900074B (en) Prefabricated tubular pile with end screw thread with X-shaped variable section and construction method thereof
CN204000846U (en) Floral tube slip casting uplift pile
CN210216405U (en) Spiral stiffening rib steel pipe concrete pile
CN203569565U (en) Anti-vibration foundation spiral ground pile
CN203113349U (en) Foundation trench shoring lattice type end structure
CN204984271U (en) A ream bit for abrasion drill
CN207749515U (en) A kind of semicircle pile driving construction device
CN206128108U (en) Prestressing force bucket foundation of removable crab -bolt
CN201401177Y (en) Double-column lining structure for double-circular shield tunnel
CN102383429B (en) Digging pile-sinking device in the middle of a kind of heavy caliber pile tube
CN204533810U (en) A kind of teflon traction tube
CN203795420U (en) Concrete pipe pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20141120

EXPY Termination of patent right or utility model