CN203795420U
CN203795420U CN201420191163.8U CN201420191163U CN203795420U CN 203795420 U CN203795420 U CN 203795420U CN 201420191163 U CN201420191163 U CN 201420191163U CN 203795420 U CN203795420 U CN 203795420U
Authority
CN
China
Prior art keywords
concrete
layer
main body
sleeve pipes
centre bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420191163.8U
Other languages
Chinese (zh)
Inventor
盛惠佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Cheng He Building Materials Co ltd
Original Assignee
NINGBO JINXIN GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO JINXIN GROUP CO Ltd filed Critical NINGBO JINXIN GROUP CO Ltd
Priority to CN201420191163.8U priority Critical patent/CN203795420U/en
Application granted granted Critical
Publication of CN203795420U publication Critical patent/CN203795420U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a concrete pipe pile, which comprises a main body, wherein the main body comprises a steel pipe layer and a concrete layer positioned inside the steel pipe layer; a central hole is formed in the middle of the concrete layer and penetrates through the upper end and the lower end of the concrete layer; two or more steel sleeve pipes penetrate through the main body and horizontally penetrate through the two sides of the main body; the axis lines of the sleeve pipes intersect on the axis line of the central hole; the two adjacent sleeve pipes are perpendicular to each other; meanwhile, the outer diameter of the sleeve pipes is smaller than the inner diameter of the central hole; a cone-shaped expanding end with a bottom big end is formed at the lower part of the main body in a cast-in-place manner. The concrete pipe pile has the benefit of preferable shock resistance.

Description

Concrete tubular pile
Technical field
The present invention relates to concrete products technical field, especially relate to a kind of concrete tubular pile.
Background technology
Concrete tubular pile is mainly used in the infrastructure of high-rise building, railway bridge engineering.A kind of concrete tubular pile wherein comprises steel pipe layer and is positioned at the layer of concrete of this steel pipe layer inside, and this layer of concrete middle part has the centre bore that connects this layer of concrete upper and lower side., this layer of concrete adopts centrifugation moulding.Its defect is: in softer medium, especially have in the medium of drift sand, the impact resistance of this concrete tubular pile is poor.
Summary of the invention
The object of this invention is to provide a kind of concrete tubular pile, it has the feature of good impact resistance.
The technical solution adopted in the present invention is: concrete tubular pile, comprise body, this body comprises steel pipe layer and is positioned at the layer of concrete of this steel pipe layer inside, and this layer of concrete middle part has the centre bore that connects this layer of concrete upper and lower side, on described body, be penetrated with at least two steel sleeve pipes, the both sides of what this sleeve pipe was horizontal run through this body, the axial line of this sleeve pipe intersects at the axial line of this centre bore, and two adjacent sleeve pipes are mutually vertical, simultaneously, the external diameter of this sleeve pipe is less than the internal diameter of this centre bore, and, the bottom of this body by cast-in-place mode form large end under taper shape expand termination.
The advantage that the present invention has is: have good impact resistance.The sleeve pipe that concrete tubular pile of the present invention has makes the media such as drift sand can be full of the inner chamber of this sleeve pipe and can circulate in the inner chamber of this sleeve pipe, thereby reduced medium, pile tube is impacted.Meanwhile, the expansion termination of the larger volume that this pile tube has, makes this pile tube comparatively stable, has then further strengthened the impact resistance of this pile tube.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is further described:
Fig. 1 is that the master of embodiments of the invention looks sectional view.
In figure: 10, body, 11, steel pipe layer, 12, layer of concrete, 121, centre bore; 20, sleeve pipe; 30, expand termination.
Detailed description of the invention
Embodiment, as shown in Figure 1: concrete tubular pile, comprises body 10.This body 10 comprises steel pipe layer 11 and is positioned at the layer of concrete 12 of these steel pipe layer 11 inside, and these layer of concrete 12 middle parts have the centre bore 121 that connects these layer of concrete 12 upper and lower sides., this layer of concrete 12 is formed in the inner chamber of this steel pipe layer 11 in advance by centrifugal mode.Further say, on this body 10, be penetrated with at least two steel sleeve pipes 20.The both sides of running through this body 10 that this sleeve pipe 20 is horizontal, and the axial line of this sleeve pipe 20 intersects at the axial line of this centre bore 121.This sleeve pipe 20 can be fixed on this steel pipe layer 11 by the mode of welding.And two sleeve pipes 20 adjacent on above-below direction are mutually vertical.Like this, all directions flow compared with soft-medium such as the impact that drift sand causes this pile tube is less.Meanwhile, the external diameter of this sleeve pipe 20 is less than the internal diameter of this centre bore 121.And, the bottom of this body 10 by cast-in-place mode form large end under taper shape expand termination 30.This expansion termination 30 can adopt after 10 piling of this body put in place, adopt high-pressure rotary jetting apparatus rotation expand the below of stake bottom and use high-pressure rotary-spray pipe to stretch into this centre bore 121 by this centre bore 121, and by these centre bore 121 injected water mud, and cement paste can form cast-in-place expansion termination 30 after condensing.Like this, make this pile tube more stable by increasing the bottom area of this pile tube, its impact resistance is had been further upgraded.
The foregoing is only the preferred embodiments of the present invention; not thereby limit the scope of the claims of the present invention; every equivalent structure or conversion of equivalent flow process that utilizes manual of the present invention and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (1)

1. concrete tubular pile, comprise body (10), this body (10) comprises steel pipe layer (11) and is positioned at the inner layer of concrete (12) of this steel pipe layer (11), and this layer of concrete (12) middle part has the centre bore (121) that connects this layer of concrete (12) upper and lower side, it is characterized in that: on described body (10), be penetrated with at least two steel sleeve pipes (20), the both sides of running through this body (10) that this sleeve pipe (20) is horizontal, the axial line of this sleeve pipe (20) intersects at the axial line of this centre bore (121), and adjacent two sleeve pipes (20) are mutually vertical, simultaneously, the external diameter of this sleeve pipe (20) is less than the internal diameter of this centre bore (121), and, the bottom of this body (10) by cast-in-place mode form large end under taper shape expand termination (30).
CN201420191163.8U 2014-04-18 2014-04-18 Concrete pipe pile Expired - Fee Related CN203795420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420191163.8U CN203795420U (en) 2014-04-18 2014-04-18 Concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420191163.8U CN203795420U (en) 2014-04-18 2014-04-18 Concrete pipe pile

Publications (1)

Publication Number Publication Date
CN203795420U true CN203795420U (en) 2014-08-27

Family

ID=51377649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420191163.8U Expired - Fee Related CN203795420U (en) 2014-04-18 2014-04-18 Concrete pipe pile

Country Status (1)

Country Link
CN (1) CN203795420U (en)

Similar Documents

Publication Publication Date Title
CN204552783U (en) A kind of loess tunnel vertical deformation control structure
CN104727309A (en) Construction technology of squeeze-in expanded-base pipe pile
CN206592139U (en) A kind of external poured is segmented anchoring rod
CN105114109A (en) Self-drilling type hollow anchor rod grouting connector
CN205918368U (en) Bore notes an organic whole and retreat formula slip casting drilling rod
CN204385727U (en) Spiral grouting preformed pile
CN106088092A (en) There is refusing the solution of hammer situation in pile tube piling process
CN203795420U (en) Concrete pipe pile
CN203213401U (en) Concrete steel pipe column lining reinforced connecting pipe
CN202578616U (en) Adjustable orifice sealing device for geological drilling
CN203684208U (en) Prefabricated tubular pile used for constructing roads and bridges and with externally-extending rod piece
CN104863126B (en) Use the method that Grouting Technology processes large diameter bored pile collapse hole
CN205999941U (en) A kind of underground continuous wall section attachment means
CN204098791U (en) A kind of self-drilling hollow anchor bars drill bit
CN205116154U (en) Steel pipe concrete pile is strutted to side slope
CN204000846U (en) Floral tube slip casting uplift pile
CN204252833U (en) A kind of long spire center pressure of improvement fills with CFG stake drill bit
CN204139162U (en) Concrete tubular pile pile splicing structure
CN203823346U (en) Plugging device for high-strength steel penstock hole
CN203569567U (en) Hydraulic eccentric pick head
CN204849735U (en) Weak crowded native precast pile of opening type
CN201982023U (en) Grouting converter for spiral drill pipe
CN203961809U (en) Super large caliber Drilling Water mud collar structure
CN205036394U (en) Self -drilling cavity anchor rod grout connects
CN204491618U (en) Self-plugging infiltration type slurry casting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210511

Address after: 315000 15-4-09, building 3, No. 677, 685, 687, Changxing Road, Jiangbei District, Ningbo City, Zhejiang Province

Patentee after: Ningbo Cheng He building materials Co.,Ltd.

Address before: 2588 Rongji West Road, Jiangbei District, Ningbo City, Zhejiang Province

Patentee before: NINGBO JINXIN GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140827