CN203674616U - Steering assembly device for iron tower operation - Google Patents
Steering assembly device for iron tower operation Download PDFInfo
- Publication number
- CN203674616U CN203674616U CN201320766838.2U CN201320766838U CN203674616U CN 203674616 U CN203674616 U CN 203674616U CN 201320766838 U CN201320766838 U CN 201320766838U CN 203674616 U CN203674616 U CN 203674616U
- Authority
- CN
- China
- Prior art keywords
- tower
- turns
- hole
- combination unit
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title abstract description 10
- 229910052742 iron Inorganic materials 0.000 title abstract description 5
- 239000000463 material Substances 0.000 claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 238000010276 construction Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a steering assembly device for an iron tower operation. The special of the device is that the device is composed of tower material protection clamping devices used for being fixed on tower materials and a steering plate used for connecting the tower material protection clamping devices. Since the tower material protection clamping devices are fixed on the tower materials, the tower material protection clamping devices are further connected to the steering plate by utilizing operating ropes. The tower materials in every direction of the iron tower for the operation are connected and fixed to a whole. Further, the operating ropes and relevant steering devices are connected to the whole tower materials through steering operating holes on the steering plate. The aim of steering is achieved. The device has simple structure, and the construction and the overhauling quality are guaranteed. The operation on the tower and the overhauling planned speed are greatly improved.
Description
Technical field
The utility model relates to tower erection instrument, and particularly a kind of steel tower operation turns to combination unit.
Background technology
Along with economic development in recent years, power circuit is in continuous construction, thing followed steel tower establishment operation is on the increase, in operation process, build the jockey that lacks direct use specification between the various Work tools of tower and tower material and gold utensil, bring very large trouble and inconvenience to site operation and maintenance repair.
Summary of the invention
The purpose of this utility model is to ensure that in order to provide a kind of on construction and repair quality, raising tower, the steel tower operation of job execution and repair schedule turns to combination unit.
The technical solution of the utility model is:
A kind of steel tower operation turns to combination unit, and its special character is: by protecting jig and form for the deflecting plate that is connected described tower material protection jig for the tower material being fixed on tower material.
Above-mentioned steel tower operation turns to combination unit; described tower material is protected jig to have and is utilized bolted double-deck clamping plate; described double-deck clamping plate are made up of rectangular-shaped outside plate and rectangular-shaped inner panel; described rectangular-shaped inner panel knuckle place is provided with a pair of dowel spaced apart; between described dowel, be provided with connecting plate, described connecting plate is provided with the connecting hole for connecting operation rope.
Above-mentioned steel tower operation turns to combination unit, and described connection hole is provided with the junction button for connecting operation rope, to reach the convenient object connecting, and prevents the excessive wear of operation rope.
Above-mentioned steel tower operation turns to combination unit; described deflecting plate is provided with multiple for connecting the fixing hole of described tower material protection jig and turning to operation hole, described fixing hole and turn to operation hole taking described deflecting plate center line as symmetrical centre is evenly distributed on described deflecting plate on.
Above-mentioned steel tower operation turns to combination unit, described fixing hole and turn to operation span distribute.
Above-mentioned steel tower operation turns to combination unit, described fixing hole with turn to operation hole to be provided with the junction button for being connected operation rope, to reach the convenient object connecting, and prevent the excessive wear of operation rope.
The beneficial effects of the utility model are:
Because tower material protection jig is fixedly clamped on tower material; tower material protection jig recycling operation rope is connected with deflecting plate; being respectively connected and fixed and being integrated to tower material with steel tower by operation; again by turning to operation hole to connect operation rope and the relevant Work tool that turns on deflecting plate; reach and turn to object; simple in structure, and ensured construction and repair quality, significantly improve job execution and repair schedule on tower.
Brief description of the drawings
Fig. 1 is use view of the present utility model;
Fig. 2 is the structural representation of tower material protection jig in Fig. 1;
Fig. 3 be in Fig. 2 A to view;
Fig. 4 is the structural representation of deflecting plate in Fig. 1.
In figure: tower material is protected jig 1, rectangular-shaped outside plate 101, rectangular-shaped inner panel 102, dowel 103, connecting plate 104, connecting hole 105, bolt 106, deflecting plate 2, fixing hole 201, turned to operation hole 202, junction button 3, operation rope 4, operation rope 5, iron tower main material 6.
Embodiment
As shown in the figure, this steel tower operation turns to combination unit, is made up of tower material protection jig 1 and deflecting plate 2.Wherein, described tower material protection jig 1 is for the protection of tower material and be connected and fixed deflecting plate 2; it has the double-deck clamping plate that utilize bolt 106 to connect; described double-deck clamping plate are made up of rectangular-shaped outside plate 101 and rectangular-shaped inner panel 102; described rectangular-shaped inner panel 102 knuckle places are provided with a pair of dowel 103 spaced apart; between described dowel 103, be provided with connecting plate 104; described connecting plate 104 is provided with the connecting hole 105 for connecting operation rope 4, and described connecting hole 105 places are provided with the junction button 3 for connecting operation rope 4.Described deflecting plate 2 is provided with multiple for connecting the fixing hole 201 of described tower material protection jig 1 and turning to operation hole 202; for fixing with tower material protection jig 1; and utilize operation rope 5 changes while turning to operation hole 202 to make operation to be subject to force direction; described fixing hole 201 and turn to operation hole 202 taking described deflecting plate 2 center lines as symmetrical centre is evenly distributed on described deflecting plate 2 on, described fixing hole 201 and turn to operation hole 202 spaced apart.Described fixing hole 201 with turn to operation hole 201 to be provided with the junction button 3 for being connected operation rope 4,5.
In tower erection process; first adopt four tower material protection jigs 1 to be individually fixed on four jiaos of main materials of steel tower; be located at iron tower main material 6 roots and utilize bolt 106 to be fixedly clamped by tower material protection jig 1 Double-layer clamp plate holder; recycling operation rope 4 is connected and fixed four tower material protection jigs 1 with the deflecting plate 2 of being located at steel tower middle part; the last operation rope 5 all angles on deflecting plate 2 being connected in advance according to on-site actual situations changes the direction of power, reaches and turns to object.
Claims (6)
1. steel tower operation turns to a combination unit, it is characterized in that: by protecting jig and form for the deflecting plate that is connected described tower material protection jig for the tower material being fixed on tower material.
2. steel tower operation according to claim 1 turns to combination unit; it is characterized in that: described tower material is protected jig to have and utilized bolted double-deck clamping plate; described double-deck clamping plate are made up of rectangular-shaped outside plate and rectangular-shaped inner panel; described rectangular-shaped inner panel knuckle place is provided with a pair of dowel spaced apart; between described dowel, be provided with connecting plate, described connecting plate is provided with the connecting hole for connecting operation rope.
3. steel tower operation according to claim 2 turns to combination unit, it is characterized in that: described connection hole is provided with the junction button for connecting operation rope.
4. steel tower operation according to claim 1 turns to combination unit; it is characterized in that: described deflecting plate is provided with multiple for connecting the fixing hole of described tower material protection jig and turning to operation hole, described fixing hole and turn to operation hole taking described deflecting plate center line as symmetrical centre is evenly distributed on described deflecting plate on.
5. steel tower operation according to claim 4 turns to combination unit, it is characterized in that: described fixing hole and turn to operation span distribute.
6. steel tower operation according to claim 4 turns to combination unit, it is characterized in that: described fixing hole with turn to operation hole to be provided with the junction button for being connected operation rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320766838.2U CN203674616U (en) | 2013-11-29 | 2013-11-29 | Steering assembly device for iron tower operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320766838.2U CN203674616U (en) | 2013-11-29 | 2013-11-29 | Steering assembly device for iron tower operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203674616U true CN203674616U (en) | 2014-06-25 |
Family
ID=50970871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320766838.2U Expired - Fee Related CN203674616U (en) | 2013-11-29 | 2013-11-29 | Steering assembly device for iron tower operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203674616U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103618253A (en) * | 2013-11-29 | 2014-03-05 | 国家电网公司 | Steering combination device for iron tower operation |
-
2013
- 2013-11-29 CN CN201320766838.2U patent/CN203674616U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103618253A (en) * | 2013-11-29 | 2014-03-05 | 国家电网公司 | Steering combination device for iron tower operation |
CN103618253B (en) * | 2013-11-29 | 2016-07-06 | 国网辽宁省电力有限公司朝阳供电公司 | Iron tower operation turns to combination unit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425116A (en) | Method for connecting trough-type base of steel trestle with embedded bolt in concrete bracket | |
CN203946776U (en) | Head tower bearing plate turnover hoisting fixture | |
CN203674616U (en) | Steering assembly device for iron tower operation | |
CN103618253B (en) | Iron tower operation turns to combination unit | |
CN204126062U (en) | A kind of cylindrical rigid tie bar shrouding connecting joint structure | |
CN203700940U (en) | Device for conveniently installing external prestressed cable | |
CN205184021U (en) | Special stud welding tool of high accuracy lightweight | |
CN203008479U (en) | Temporary standing platform for iron tower assembly | |
CN203767024U (en) | Simple manhole guardrail | |
CN204715858U (en) | A kind of tower erection protection instrument | |
CN103850279B (en) | A kind of skeleton dipper and excavator | |
CN204089105U (en) | Bus duct and I-steel syndeton | |
CN203401113U (en) | Drilling jig of half coupling | |
CN203077185U (en) | Quick-release type rope tightening device | |
CN203760929U (en) | Tension tower line-tightening steering pulley used during construction of power transmission line tower | |
CN205772901U (en) | A kind of conduction rack | |
CN203135318U (en) | Clamping tool used for changing single-strand insulator | |
CN204125043U (en) | A kind of mono beam overhead crane girder and end carriage connecting device | |
CN204079317U (en) | A kind of jacking cross beam with anti-drop device | |
CN205011242U (en) | Anchor clamps are used in hoist and mount of sound barrier cell board | |
CN204152187U (en) | One is encorbelmented i iron cuff | |
CN204177510U (en) | Planetary reduction gear Bolt Torque checks servicing unit | |
CN205080856U (en) | Iron tower number plate fixing device | |
CN203320808U (en) | Steel structure column lengthening structure | |
CN203830975U (en) | Support device for welding beam of I-shaped steel-structured crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20171129 |