CN203660410U - Three-phase wire interphase imbalance tool - Google Patents

Three-phase wire interphase imbalance tool Download PDF

Info

Publication number
CN203660410U
CN203660410U CN201320700045.0U CN201320700045U CN203660410U CN 203660410 U CN203660410 U CN 203660410U CN 201320700045 U CN201320700045 U CN 201320700045U CN 203660410 U CN203660410 U CN 203660410U
Authority
CN
China
Prior art keywords
trapezoidal plate
tool
hole
conducting wire
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320700045.0U
Other languages
Chinese (zh)
Inventor
张国清
杨宁
刘刚
朱和军
杨慧
王学英
杨志钧
马倩倩
张福荣
徐兆国
王有威
郑义
赵秀琴
芦苇
刘保
朱冬梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
State Grid Corp of China SGCC
Original Assignee
SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co, State Grid Corp of China SGCC filed Critical SHIZUISHAN POWER SUPPLY Co OF STATE GRID NINGXIA ELECTRIC POWER Co
Priority to CN201320700045.0U priority Critical patent/CN203660410U/en
Application granted granted Critical
Publication of CN203660410U publication Critical patent/CN203660410U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a three-phase wire interphase imbalance tool. The interphase imbalance tool is characterized by comprising a trapezoidal plate (1), two through holes (2) are formed in the middle of the upper bottom of the trapezoidal plate (1), the two ends of the lower bottom of the trapezoidal plate (1) are respectively provided with a through hole (2), a flange (3) is installed beside each through hole (2) of the two ends of the lower bottom and perpendicular to the trapezoidal plate (1), and a through hole is also formed in each flange (3). It is proved through trials that by the adoption of the tool, the winding phenomenon of three-phase wires is greatly avoided when the wires are unfolded, labor intensity of workers is greatly reduced, power outage time is greatly shortened, and labor efficiency is improved; wire unfolding and paying-off in construction are convenient after the tool is adopted, power outage time shortening is facilitated, and working efficiency of construction and new circuit erection is improved.

Description

The alternate uneven instrument of three-phase conducting wire
Technical field
The utility model relates to the alternate uneven instrument of a kind of three-phase conducting wire.
Background technology
In recent years, in power construction, new stringing road, three-phase conducting wire unfolds (one leads three) simultaneously, has realized the unsettled unwrapping wire of circuit, has successfully solved spreading conducting wire process, in construction, realizes three wires and unfolds simultaneously and increased substantially operating efficiency.But in practice of construction, while often there is spreading conducting wire, three-phase conducting wire unbalance stress etc. makes towing plate imbalance, cause three-phase conducting wire to be wound around, now must step on bar operation by workmen, manually the wire being wound around is flattened, continuing unfolding work, this has not only increased difficulty of construction, has also wasted human cost, also the effort of raising the efficiency is had a greatly reduced quality simultaneously.
For example certain city electric power system in decades 10 kilovolt constructions are continued to use always and are manually dragged spreading conducting wire, make three-phase unbalance stress, cause construction of line insulator to be drawn by wire askew, when three-phase conducting wire unfolds simultaneously, energy imbalance is very outstanding, needs workmen to step on bar adjustment.This maintenance crew of power supply administration of city occurs that when to 12 line constructions the alternate uneven number of times of unfolding conductor reaches 364 times, cause three-phase conducting wire to be wound around up to 99.7%, and spended time goes upset to account for 42.3% of the construction used time, the uneven number of times of unwrapping wire wherein causing because of " towing plate disequilibrium extreme difference " reaches 262 times, having accounted for 72%, is the subject matter that circuit exhibition payingoff construction exists.
Utility model content
The purpose of this utility model is to provide the alternate uneven instrument of a kind of three-phase conducting wire, and the three-phase conducting wire balance can ensure spreading conducting wire after use time is drawn askew phenomenon thereby reduce insulator.
The alternate uneven instrument of a kind of three-phase conducting wire, its special feature is: comprise a trapezoidal plate, in the middle of the upper base of this trapezoidal plate, have two through holes, have a through hole at the two ends of going to the bottom of this trapezoidal plate, and the each through hole side at these two ends of going to the bottom is all provided with the rib vertical with this trapezoidal plate, also has through hole on this rib.
Wherein two through holes in the middle of the upper base of trapezoidal plate distribute along the short transverse of this trapezoidal plate, and the spacing of these two through holes is 120mm.
Wherein on described trapezoidal plate, have a dovetail groove, and the shape of described trapezoidal plate and this dovetail groove is isosceles trapezoid.
Wherein on rib, be provided with arc groove.
Through probationary certificate, adopt after instrument of the present utility model, the wrapping phenomena of three-phase conducting wire while having avoided greatly spreading conducting wire, greatly reduce employee's labour intensity, shorten interruption duration, improved efficiency, adopted after instrument of the present utility model as construction unfolding line provides convenience, be conducive to shorten interruption duration, improve the operating efficiency on construction, new stringing road.
Brief description of the drawings
Accompanying drawing 1 is structural representation of the present utility model;
Accompanying drawing 2 is structural representation of the present utility model.
Embodiment
As shown in Figure 1, 2, the utility model is the alternate uneven instrument of a kind of three-phase conducting wire, comprises a trapezoidal plate 1, specifically can adopt iron plate, steel plate or aluminium alloy plate.In the middle of the upper base of this trapezoidal plate 1, have two through holes 2, have a through hole 2 at the two ends of going to the bottom of this trapezoidal plate 1, and the other rib vertical with this trapezoidal plate 13 that be all provided with of each through hole 2 at these two ends of going to the bottom, can be close to wire easily fixing thereby the one side contacting with wire on rib 3 is provided with arc groove, on this rib 3, also have through hole 2.
Wherein two through holes 2 in the middle of the upper base of trapezoidal plate 1 distribute along the short transverse of this trapezoidal plate 1, and the spacing of these two through holes 2 is 120mm.Wherein on described trapezoidal plate 1, have a dovetail groove, and the shape of described trapezoidal plate 1 and this dovetail groove is isosceles trapezoid, thereby can in ensureing trapezoidal plate 1 structural strength, reduces its weight as far as possible.
Using method of the present utility model is:
When use by two wires of arranged on left and right sides respectively purposes binding wire be temporarily fixed at other through hole 2 places of two of 1 belows of trapezoidal plate rib 3, it is temporary fixed that a middle wire coordinates binding wire to carry out by two through holes 2 in the middle of trapezoidal plate 1 top, like this in the time of spreading conducting wire, the stressed equalization of three-phase conducting wire makes towing plate remain balance, avoid the winding of three-phase conducting wire, after completing, binding wire and trapezoidal plate 1 have all been taken off from wire.

Claims (4)

1. the alternate uneven instrument of three-phase conducting wire, it is characterized in that: comprise a trapezoidal plate (1), in the middle of the upper base of this trapezoidal plate (1), have two through holes (2), have a through hole (2) at the two ends of going to the bottom of this trapezoidal plate (1), and each through hole (2) side at these two ends of going to the bottom is all provided with the rib (3) vertical with this trapezoidal plate (1), also has through hole (2) on this rib (3).
2. the alternate uneven instrument of three-phase conducting wire as claimed in claim 1, is characterized in that: wherein two through holes (2) in the middle of the upper base of trapezoidal plate (1) distribute along the short transverse of this trapezoidal plate (1), and the spacing of these two through holes (2) is 120mm.
3. the alternate uneven instrument of three-phase conducting wire as claimed in claim 1 or 2, is characterized in that: wherein on described trapezoidal plate (1), have a dovetail groove, and the shape of described trapezoidal plate (1) and this dovetail groove is isosceles trapezoid.
4. the alternate uneven instrument of three-phase conducting wire as claimed in claim 1 or 2, is characterized in that: wherein on rib (3), be provided with arc groove.
CN201320700045.0U 2013-11-07 2013-11-07 Three-phase wire interphase imbalance tool Expired - Fee Related CN203660410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320700045.0U CN203660410U (en) 2013-11-07 2013-11-07 Three-phase wire interphase imbalance tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320700045.0U CN203660410U (en) 2013-11-07 2013-11-07 Three-phase wire interphase imbalance tool

Publications (1)

Publication Number Publication Date
CN203660410U true CN203660410U (en) 2014-06-18

Family

ID=50926764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320700045.0U Expired - Fee Related CN203660410U (en) 2013-11-07 2013-11-07 Three-phase wire interphase imbalance tool

Country Status (1)

Country Link
CN (1) CN203660410U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103560433A (en) * 2013-11-07 2014-02-05 国家电网公司 Three-phase wire interphase imbalance tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103560433A (en) * 2013-11-07 2014-02-05 国家电网公司 Three-phase wire interphase imbalance tool

Similar Documents

Publication Publication Date Title
CN203660410U (en) Three-phase wire interphase imbalance tool
CN203071537U (en) Equilateral triangle fixing support for cable laid underground
CN206233852U (en) A kind of Portable lifting transmission platform
CN203795311U (en) Multi-leg high pier and slip form construction device
CN106532557B (en) Across 10KV line construction platform tools devices
CN102364779A (en) Three-phase tubular bus synchronization hoisting auxiliary apparatus
CN204241323U (en) Insulation ropes test unit
CN104882267B (en) Method for adding angle ring to transformer coil assembly
CN204905764U (en) Novel unwrapping wire has a power failure and turns over line device
CN103560433A (en) Three-phase wire interphase imbalance tool
CN203339567U (en) Synchronous hoisting system with ultra-high-voltage rigid hard jumper
CN204532021U (en) A kind of power equipment maintaining ladder
CN202906291U (en) Operation rope ladder hanging equipment
CN204190267U (en) A kind of stay wire making tool
CN202967898U (en) Turning dual-connection plate
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN205882554U (en) Work platform on power line pole
CN202159929U (en) Integrated ten-division wire lifting device for live-wire work
CN203939815U (en) Be used in the suspension centre fixing device on emergency first-aid repair tower
CN206620023U (en) Motor pole dismantling device
CN203951104U (en) High-tension cable paying-off implement
CN103151726A (en) Portable overhead conductor displacement device
CN203589613U (en) High voltage line aluminum armor tape winding device
CN203398954U (en) Rapid dismounting device for enameled wire of motor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20151107

EXPY Termination of patent right or utility model