CN203660410U - Three-phase wire interphase imbalance tool - Google Patents
Three-phase wire interphase imbalance tool Download PDFInfo
- Publication number
- CN203660410U CN203660410U CN201320700045.0U CN201320700045U CN203660410U CN 203660410 U CN203660410 U CN 203660410U CN 201320700045 U CN201320700045 U CN 201320700045U CN 203660410 U CN203660410 U CN 203660410U
- Authority
- CN
- China
- Prior art keywords
- trapezoidal plate
- tool
- hole
- conducting wire
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000016507 interphase Effects 0.000 title abstract 3
- 238000010276 construction Methods 0.000 abstract description 13
- 238000004804 winding Methods 0.000 abstract description 2
- 238000004904 shortening Methods 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000012212 insulator Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Abstract
The utility model relates to a three-phase wire interphase imbalance tool. The interphase imbalance tool is characterized by comprising a trapezoidal plate (1), two through holes (2) are formed in the middle of the upper bottom of the trapezoidal plate (1), the two ends of the lower bottom of the trapezoidal plate (1) are respectively provided with a through hole (2), a flange (3) is installed beside each through hole (2) of the two ends of the lower bottom and perpendicular to the trapezoidal plate (1), and a through hole is also formed in each flange (3). It is proved through trials that by the adoption of the tool, the winding phenomenon of three-phase wires is greatly avoided when the wires are unfolded, labor intensity of workers is greatly reduced, power outage time is greatly shortened, and labor efficiency is improved; wire unfolding and paying-off in construction are convenient after the tool is adopted, power outage time shortening is facilitated, and working efficiency of construction and new circuit erection is improved.
Description
Technical field
The utility model relates to the alternate uneven instrument of a kind of three-phase conducting wire.
Background technology
In recent years, in power construction, new stringing road, three-phase conducting wire unfolds (one leads three) simultaneously, has realized the unsettled unwrapping wire of circuit, has successfully solved spreading conducting wire process, in construction, realizes three wires and unfolds simultaneously and increased substantially operating efficiency.But in practice of construction, while often there is spreading conducting wire, three-phase conducting wire unbalance stress etc. makes towing plate imbalance, cause three-phase conducting wire to be wound around, now must step on bar operation by workmen, manually the wire being wound around is flattened, continuing unfolding work, this has not only increased difficulty of construction, has also wasted human cost, also the effort of raising the efficiency is had a greatly reduced quality simultaneously.
For example certain city electric power system in decades 10 kilovolt constructions are continued to use always and are manually dragged spreading conducting wire, make three-phase unbalance stress, cause construction of line insulator to be drawn by wire askew, when three-phase conducting wire unfolds simultaneously, energy imbalance is very outstanding, needs workmen to step on bar adjustment.This maintenance crew of power supply administration of city occurs that when to 12 line constructions the alternate uneven number of times of unfolding conductor reaches 364 times, cause three-phase conducting wire to be wound around up to 99.7%, and spended time goes upset to account for 42.3% of the construction used time, the uneven number of times of unwrapping wire wherein causing because of " towing plate disequilibrium extreme difference " reaches 262 times, having accounted for 72%, is the subject matter that circuit exhibition payingoff construction exists.
Utility model content
The purpose of this utility model is to provide the alternate uneven instrument of a kind of three-phase conducting wire, and the three-phase conducting wire balance can ensure spreading conducting wire after use time is drawn askew phenomenon thereby reduce insulator.
The alternate uneven instrument of a kind of three-phase conducting wire, its special feature is: comprise a trapezoidal plate, in the middle of the upper base of this trapezoidal plate, have two through holes, have a through hole at the two ends of going to the bottom of this trapezoidal plate, and the each through hole side at these two ends of going to the bottom is all provided with the rib vertical with this trapezoidal plate, also has through hole on this rib.
Wherein two through holes in the middle of the upper base of trapezoidal plate distribute along the short transverse of this trapezoidal plate, and the spacing of these two through holes is 120mm.
Wherein on described trapezoidal plate, have a dovetail groove, and the shape of described trapezoidal plate and this dovetail groove is isosceles trapezoid.
Wherein on rib, be provided with arc groove.
Through probationary certificate, adopt after instrument of the present utility model, the wrapping phenomena of three-phase conducting wire while having avoided greatly spreading conducting wire, greatly reduce employee's labour intensity, shorten interruption duration, improved efficiency, adopted after instrument of the present utility model as construction unfolding line provides convenience, be conducive to shorten interruption duration, improve the operating efficiency on construction, new stringing road.
Brief description of the drawings
Accompanying drawing 1 is structural representation of the present utility model;
Accompanying drawing 2 is structural representation of the present utility model.
Embodiment
As shown in Figure 1, 2, the utility model is the alternate uneven instrument of a kind of three-phase conducting wire, comprises a trapezoidal plate 1, specifically can adopt iron plate, steel plate or aluminium alloy plate.In the middle of the upper base of this trapezoidal plate 1, have two through holes 2, have a through hole 2 at the two ends of going to the bottom of this trapezoidal plate 1, and the other rib vertical with this trapezoidal plate 13 that be all provided with of each through hole 2 at these two ends of going to the bottom, can be close to wire easily fixing thereby the one side contacting with wire on rib 3 is provided with arc groove, on this rib 3, also have through hole 2.
Wherein two through holes 2 in the middle of the upper base of trapezoidal plate 1 distribute along the short transverse of this trapezoidal plate 1, and the spacing of these two through holes 2 is 120mm.Wherein on described trapezoidal plate 1, have a dovetail groove, and the shape of described trapezoidal plate 1 and this dovetail groove is isosceles trapezoid, thereby can in ensureing trapezoidal plate 1 structural strength, reduces its weight as far as possible.
Using method of the present utility model is:
When use by two wires of arranged on left and right sides respectively purposes binding wire be temporarily fixed at other through hole 2 places of two of 1 belows of trapezoidal plate rib 3, it is temporary fixed that a middle wire coordinates binding wire to carry out by two through holes 2 in the middle of trapezoidal plate 1 top, like this in the time of spreading conducting wire, the stressed equalization of three-phase conducting wire makes towing plate remain balance, avoid the winding of three-phase conducting wire, after completing, binding wire and trapezoidal plate 1 have all been taken off from wire.
Claims (4)
1. the alternate uneven instrument of three-phase conducting wire, it is characterized in that: comprise a trapezoidal plate (1), in the middle of the upper base of this trapezoidal plate (1), have two through holes (2), have a through hole (2) at the two ends of going to the bottom of this trapezoidal plate (1), and each through hole (2) side at these two ends of going to the bottom is all provided with the rib (3) vertical with this trapezoidal plate (1), also has through hole (2) on this rib (3).
2. the alternate uneven instrument of three-phase conducting wire as claimed in claim 1, is characterized in that: wherein two through holes (2) in the middle of the upper base of trapezoidal plate (1) distribute along the short transverse of this trapezoidal plate (1), and the spacing of these two through holes (2) is 120mm.
3. the alternate uneven instrument of three-phase conducting wire as claimed in claim 1 or 2, is characterized in that: wherein on described trapezoidal plate (1), have a dovetail groove, and the shape of described trapezoidal plate (1) and this dovetail groove is isosceles trapezoid.
4. the alternate uneven instrument of three-phase conducting wire as claimed in claim 1 or 2, is characterized in that: wherein on rib (3), be provided with arc groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320700045.0U CN203660410U (en) | 2013-11-07 | 2013-11-07 | Three-phase wire interphase imbalance tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320700045.0U CN203660410U (en) | 2013-11-07 | 2013-11-07 | Three-phase wire interphase imbalance tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203660410U true CN203660410U (en) | 2014-06-18 |
Family
ID=50926764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320700045.0U Expired - Fee Related CN203660410U (en) | 2013-11-07 | 2013-11-07 | Three-phase wire interphase imbalance tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203660410U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103560433A (en) * | 2013-11-07 | 2014-02-05 | 国家电网公司 | Three-phase wire interphase imbalance tool |
-
2013
- 2013-11-07 CN CN201320700045.0U patent/CN203660410U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103560433A (en) * | 2013-11-07 | 2014-02-05 | 国家电网公司 | Three-phase wire interphase imbalance tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203660410U (en) | Three-phase wire interphase imbalance tool | |
CN203071537U (en) | Equilateral triangle fixing support for cable laid underground | |
CN206233852U (en) | A kind of Portable lifting transmission platform | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN106532557B (en) | Across 10KV line construction platform tools devices | |
CN102364779A (en) | Three-phase tubular bus synchronization hoisting auxiliary apparatus | |
CN204241323U (en) | Insulation ropes test unit | |
CN104882267B (en) | Method for adding angle ring to transformer coil assembly | |
CN204905764U (en) | Novel unwrapping wire has a power failure and turns over line device | |
CN103560433A (en) | Three-phase wire interphase imbalance tool | |
CN203339567U (en) | Synchronous hoisting system with ultra-high-voltage rigid hard jumper | |
CN204532021U (en) | A kind of power equipment maintaining ladder | |
CN202906291U (en) | Operation rope ladder hanging equipment | |
CN204190267U (en) | A kind of stay wire making tool | |
CN202967898U (en) | Turning dual-connection plate | |
CN202578116U (en) | Single-person on-pole assembler for dual-fan cross arm | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN205882554U (en) | Work platform on power line pole | |
CN202159929U (en) | Integrated ten-division wire lifting device for live-wire work | |
CN203939815U (en) | Be used in the suspension centre fixing device on emergency first-aid repair tower | |
CN206620023U (en) | Motor pole dismantling device | |
CN203951104U (en) | High-tension cable paying-off implement | |
CN103151726A (en) | Portable overhead conductor displacement device | |
CN203589613U (en) | High voltage line aluminum armor tape winding device | |
CN203398954U (en) | Rapid dismounting device for enameled wire of motor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 Termination date: 20151107 |
|
EXPY | Termination of patent right or utility model |