CN203654266U - Self-propelled recoverable steel pipe pile - Google Patents

Self-propelled recoverable steel pipe pile Download PDF

Info

Publication number
CN203654266U
CN203654266U CN201320686265.2U CN201320686265U CN203654266U CN 203654266 U CN203654266 U CN 203654266U CN 201320686265 U CN201320686265 U CN 201320686265U CN 203654266 U CN203654266 U CN 203654266U
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
self
propelled
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320686265.2U
Other languages
Chinese (zh)
Inventor
张加冕
张延革
李冬梅
潘科峰
张探
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai'an Daizong Electrical And Mechanical Technology Development Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320686265.2U priority Critical patent/CN203654266U/en
Application granted granted Critical
Publication of CN203654266U publication Critical patent/CN203654266U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a steel pipe pile for construction industry, and especially relates to a self-propelled recoverable steel pipe pile. The self-propelled recoverable steel pipe pile comprises a self-propelled connector, a male adapter, a steel pipe and a female adapter, wherein the male adapter and the female adapter are firmly welded with two ends of the steel pipe to form a steel pipe pile; the self-propelled connector is connected with the steel pipe pile; by taking the steel pipe pile with the self-propelled connector as a starting end, the steel pipe piles are connected in pairs through the female adapter and the male adapter; through the pressure of compressed air, an eccentric bit and an impactor drive the steel pipe pile to self-advance. A steel pipe pile supporting system adopts a supporting structure of alternatively arranging the steel pipe piles and anchor cables, locking via top beams and waist beams and hanging nets between the steel pipe piles. According to the self-propelled recoverable steel pipe pile, the pore-forming and the piling are completed at once, so that the hole collapse phenomena of cobblestone and miscellaneous fill geologic structures are solved, the structural rigidity is high, the stability is strong, the supporting effect is good, the steel pipe pile is easy to recover, the construction efficiency is high and the cost is lowered.

Description

The recyclable steel pipe pile of self-advancing type
Technical field:
The utility model relates to a kind of building trade steel pipe pile, particularly the recyclable steel pipe pile of a kind of self-advancing type.
Background technology:
Urbanization in China speed is accelerated, high building project, subway station is built, air defense engineering, all there are a large amount of temporary lining engineerings in construction of tunnel, underground mine engineer etc., these engineerings have been used the various building materials such as great deal of steel, cement Shang Tong, owing to reclaiming, not only waste a large amount of building materials, and formed great underground pollution, especially comprised that for the construction again in city periphery floor deep foundation ditch, underground antiaircraft facility, underground pipeline laying etc. bring construction obstacle.Particularly in the time that geologic structure is cobble, miscellaneous fill geologic structure deep foundation ditch temporary lining construction, because collapse hole is serious, can not adopt the castinplace pile of cement steel cage composition, at present domestic do not have a kind of applicable this geologic structure, and recuperable supporting and protection structure and construction method.
Summary of the invention:
The purpose of this utility model is to overcome the deficiency of background technology and a kind of deep foundation ditch temporary lining steel pipe pile that can reclaim, reuse is provided.
The utility model adopts following technical scheme: the recyclable steel pipe pile of a kind of self-advancing type, comprise from entering connector, male connection, steel pipe and female adapter, and it is characterized in that: the screw thread of described male connection, female adapter is left-handed rectangular thread; Described male connection, female adapter are fixed by seam and described steel pipe two ends, then adopt groove welding firm, become a joint steel pipe pile; Describedly saving the male connection end of steel pipe pile and be connected from entering connector and described, is initiating terminal with the steel pipe pile that certainly enters connector, by internal and external screw thread joint, every joint steel pipe pile is joined between two, thereby reaches the steel pipe pile of pattern foundation pit supporting structure desired depth.
The construction method of the recyclable steel pipe pile of above-mentioned self-advancing type comprises the following steps:
Smooth and place cleaning, measurement and positioning unwrapping wire, marks a heart position;
Off-balance bit, impactor pack into certainly entering in the steel pipe pile of connector, pile-forming machine perching;
Hoisting steel pile tube, adjust the verticality of steel pipe pile pore-forming, rig work, top injecting compressed air, off-balance bit hits sandstone around, compressed air drives bottom sandy soil to blow out from top along steel pipe pile inwall, when 60-80mm above ground level is pushed up in heavy first segment stake to stake, stops calming the anger, carry out pile extension, pile extension is complete, continues to play second section stake, until reach the required supporting degree of depth;
According to same step, according to the stake heart position marking, complete piling;
Recyclable Guan Liang is set;
Vertical cut, every downward 2 meters arrange anchor cable one, and anchor cable adopts lockset and the locking of waist rail channel-section steel, and rises and draw with drawing meter, reaches design lock value;
Linked network mask between stake;
Major project construction exceeds ground line, after pit backfill, from bottom to top, withdraws from per pass waist rail lockset, steel strand, waist rail; Unclamp again Guan Liang and the connecting bolt of being preced with beam connection, split out Guan Liang and hat beam connection; With special pipe extractor, steel pipe pile is reclaimed, taxonomic revision warehouse-in, completes the recyclable steel pipe pile support system of self-advancing type again.
The preferred version of above-mentioned construction method is: steel pipe pile section adopts rectangle left hand thread to be connected with joint, the initial end that is steel pipe pile with the steel pipe pile that certainly enters connector, off-balance bit with certainly enter connector and be connected by draw-in groove, off-balance bit tail end and impactor pass through spline joint, in the time of the injecting compressed air of top, impactor impacts off-balance bit by the reciprocating motion of piston, off-balance bit hits sandstone around, due to wobbler action, drilling diameter is greater than the diameter of steel pipe pile, steel pipe pile advances along with off-balance bit and from entering connector automatically, the air of compression constantly drives bottom sandy soil to blow out from top along steel pipe pile inwall, thereby pore-forming, piling once completes.
Described from entering the key component that connector is the recyclable steel pipe pile of self-advancing type, connect off-balance bit, impactor and steel pipe pile, thereby reach advancing voluntarily of steel pipe pile.
Described Guan Liang is recyclable Guan Liang, pushing up with every recyclable steel pipe pile stake the flange welding is connected by high-strength bolt, start every downward 2 meters from Guan Liang, one anchor cable of horizontally set, every anchor cable is arranged on steel pipe pile spacing center, anchor cable angle of incidence is 15 ° or 25 °, and anchor cable is locked on waist rail.
The recyclable steel pipe pile support system of described self-advancing type adopts steel pipe pile and anchor cable to be criss-cross arranged, and is locked the supporting and protection structure of linked network between stake by Guan Liang, waist rail.Described self-advancing type is exactly that off-balance bit and impactor pass through compressed-air actuated pressure, drives steel pipe pile to advance voluntarily.
Compared with prior art, this steel pipe pile replaces castinplace pile and the miniature steel pipe pile of cement steel composition to the utility model, no longer injects cement in pipe, is convenient to reclaim, and can repeatedly use, and has saved a large amount of steel and cement.This steel pipe pile is applicable to the deep foundation pit support of cobble, miscellaneous fill geologic structure, has solved the collapse hole problem of constructing under this geological conditions, and support rigidity is large, stability is strong, the supporting degree of depth is large.This steel pipe pile is easy to adjust the verticality of pore-forming while construction, has ensured the vertical arrangement of steel pipe pile on a mask.This steel pipe pile pore-forming, lower once complete, and speed of application improves twice.
The advantage of this construction method: pore-forming, piling once complete, solve the collapse hole phenomenon of cobble, miscellaneous fill geologic structure, the rigidity of structure is large, stability is strong, and supporting effect is good, and steel pipe pile easily recycles and reuses, efficiency of construction improves greatly, save construction cost, be easy to adjust the verticality of pore-forming while construction, ensured the vertical arrangement of steel pipe pile on a mask.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is pore-forming, the piling schematic diagram of the recyclable steel pipe pile of self-advancing type.
Fig. 3, Fig. 4 are respectively that front view and the facade that the recyclable steel pipe pile of self-advancing type is arranged cuts open figure.
Detailed description of the invention:
With reference to accompanying drawing 1 to accompanying drawing 4, in figure: certainly enter connector 1, male connection 2, steel pipe 3, female adapter 4, off-balance bit 5, from the nearly recyclable steel pipe pile 6 of formula, impactor 7, waist rail 8, recyclable hat beam 9, anchor cable 10.
In the present embodiment, male connection 2, female adapter 4 are fixed by seam and steel pipe 3 two ends, then adopt respectively groove welding firm, become a joint steel pipe pile; Connect with the male connection end of a joint steel pipe pile from entering connector 1; Be initiating terminal with the steel pipe pile that certainly enters connector, by internal and external screw thread joint, every joint steel pipe pile joined between two, with reference to accompanying drawing 1.
In the present embodiment, off-balance bit 5 enters connector 1 with oneself and is connected, impactor 7 is connected with off-balance bit 5 by spline, and off-balance bit 5 hits sandstone around, top injecting compressed air, drive bottom sandy soil to blow out from top along steel pipe pile inwall, when 60-80mm above ground level is pushed up in heavy first segment stake to stake, stop calming the anger, carry out pile extension, until reach the required supporting degree of depth, with reference to accompanying drawing 2.
The preferred structure of the present embodiment: male connection 2, female adapter 4 are fixed by seam and steel pipe two ends, adopts groove welding firm, becomes a joint steel pipe pile, and by internal and external screw thread joint, every joint steel pipe pile joins between two, reaches the supporting degree of depth; Connect with the male connection 2 of a joint steel pipe from entering connector 1; The initiating terminal that is steel pipe pile with the steel pipe pile that certainly enters connector 1; The screw thread of male connection 2, female adapter 4 is left-handed rectangular thread.
Off-balance bit 5 hits sandstone around, and top injecting compressed air drives bottom sandy soil to blow out from top along steel pipe pile inwall.
The specification of the steel pipe 3 in the present embodiment is φ 133 × 4 steel pipes or φ 140 × 4.5 steel pipes, the screw thread of male connection 2, female adapter 4 is left-handed rectangular threads, Guan Liang is 20a channel-section steel, and waist rail is 16b channel-section steel, and steel pipe pile piling adopts CTQ-Z120Y rig and VF13/7 air compressor machine.
The advantage of the utility model tool is: pore-forming, piling once complete, solve the collapse hole phenomenon of cobble, miscellaneous fill geologic structure, the rigidity of structure is large, stability is strong, and supporting effect is good, and steel pipe pile easily recycles and reuses, efficiency of construction improves greatly, save construction cost, be easy to adjust the verticality of pore-forming while construction, ensured the vertical arrangement of steel pipe pile on a mask.
The method step mule of the recyclable steel pipe pile Specific construction of self-advancing type is:
Smooth and place cleaning, measurement and positioning unwrapping wire, marks a heart position; Be connected firmly with certainly entering the steel pipe pile of connector 1 and off-balance bit 5 and impactor 7; The steel pipe pile that lifting assembles, adjusts its verticality; Operation rig and air compressor machine, when 60-80mm above ground level is pushed up in heavy first segment stake to stake, calm the anger on stopping, and carries out pile extension, and pile extension is complete, continues to play second section stake, until supporting desired depth; According to same step, according to the stake heart position marking, complete piling; Recyclable hat beam 9 is set; Every 2 meters of vertical cut, one anchor cable of horizontally set 10, anchor cable 10 is arranged on the recyclable steel pipe pile of self-advancing type 6 spacing centers, and anchor cable 10 angle of incidence are 15 ° or 25 °, and anchor cable 10 is locked on waist rail 8.Shenfu Fig. 3, accompanying drawing 4.Linked network mask between stake, completes steel pipe pile support system; Major project construction exceeds ground line, first unclamps connecting bolt after pit backfill, splits out recyclable hat beam 9 and hat beam connection, then steel pipe pile is reclaimed with special pipe extractor, and taxonomic revision is put in storage, completes the recyclable steel pipe pile support system of self-advancing type.
The advantage of this construction method: pore-forming, piling once complete, solve the collapse hole phenomenon of cobble, miscellaneous fill geologic structure, the rigidity of structure is large, stability is strong, and supporting effect is good, and steel pipe pile easily recycles and reuses, efficiency of construction improves greatly, save construction cost, be easy to adjust the verticality of pore-forming while construction, ensured the vertical arrangement of steel pipe pile on a mask.
Steel pipe pile support system in the present embodiment adopts steel pipe pile and anchor cable to be criss-cross arranged, and is locked the supporting and protection structure of linked network between stake by Guan Liang, waist rail; Off-balance bit and impactor, by compressed-air actuated pressure, drive steel pipe pile to advance voluntarily; Engineering construction exceeds ground line, after pit backfill, steel pipe pile is reclaimed with special pipe extractor.

Claims (1)

1. the recyclable steel pipe pile of self-advancing type, comprises from entering connector, male connection, steel pipe and female adapter, it is characterized in that: the screw thread of described male connection, female adapter is left-handed rectangular thread; Described male connection, female adapter are fixed by seam and described steel pipe two ends, then adopt groove welding firm, become a joint steel pipe pile; Describedly saving the male connection end of steel pipe pile and be connected from entering connector and described, is initiating terminal with the steel pipe pile that certainly enters connector, by internal and external screw thread joint, every joint steel pipe pile is joined between two, thereby reaches the steel pipe pile of pattern foundation pit supporting structure desired depth.
CN201320686265.2U 2013-11-04 2013-11-04 Self-propelled recoverable steel pipe pile Expired - Fee Related CN203654266U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320686265.2U CN203654266U (en) 2013-11-04 2013-11-04 Self-propelled recoverable steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320686265.2U CN203654266U (en) 2013-11-04 2013-11-04 Self-propelled recoverable steel pipe pile

Publications (1)

Publication Number Publication Date
CN203654266U true CN203654266U (en) 2014-06-18

Family

ID=50920673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320686265.2U Expired - Fee Related CN203654266U (en) 2013-11-04 2013-11-04 Self-propelled recoverable steel pipe pile

Country Status (1)

Country Link
CN (1) CN203654266U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643673A (en) * 2013-11-04 2014-03-19 张延策 Self-advancing recyclable steel pipe pile and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643673A (en) * 2013-11-04 2014-03-19 张延策 Self-advancing recyclable steel pipe pile and construction method

Similar Documents

Publication Publication Date Title
CN101736760B (en) Construction method of prestressed anti-floating anchor rod
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN109026097B (en) Anti-floating anchor rod double-drill-bit hole forming construction method
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN102877857B (en) Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions
CN103643673A (en) Self-advancing recyclable steel pipe pile and construction method
CN111577136A (en) High-pressure jet grouting pile hole guiding construction integrated device and construction method thereof
CN103696430B (en) The construction technology of the recyclable steel-pipe pile of not slip casting
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN101851922A (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN102747729B (en) Sleeve connection device for bored cast-in-place pile construction
CN104563126B (en) Construction method for bored pile by rotary drilling rig
CN109356193B (en) Prefabricated piping lane propelling movement construction equipment
CN102877808B (en) Method for treating well blockage through camera positioning and sectioning blasting
CN203654266U (en) Self-propelled recoverable steel pipe pile
CN113513322A (en) Soil pressure balance jacking construction method for water-rich shallow-buried large-section rectangular jacking pipe
CN105064334A (en) Construction method for cast-in-situ bored pile
CN104264679A (en) Construction method of tower transmission iron tower foundation large-diameter underwater cast-in-place piles
CN204940134U (en) Steel trestle construction facility
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure
CN103334433B (en) A kind of construction method of pile pulling
CN202730756U (en) Sleeve connection device for drilling cast-in-situ bored pipe construction
CN205134326U (en) Prefabricated assembled concrete bearing structure of foundation ditch
CN111075502B (en) Method for preventing coal mine water and gas spray holes
CN211647234U (en) Overhanging type scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180720

Address after: 271000 Tang Wang street, Taishan District, Tai'an, Shandong Province, No. 79

Patentee after: TAI'AN DAIZONG ELECTRICAL AND MECHANICAL TECHNOLOGY DEVELOPMENT CO., LTD.

Address before: No. 404, Dai Zong street, Tai'an, Shandong Province

Patentee before: Zhang Yance

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20181104