CN203640619U - Rupturing drill rod - Google Patents

Rupturing drill rod Download PDF

Info

Publication number
CN203640619U
CN203640619U CN201320696059.XU CN201320696059U CN203640619U CN 203640619 U CN203640619 U CN 203640619U CN 201320696059 U CN201320696059 U CN 201320696059U CN 203640619 U CN203640619 U CN 203640619U
Authority
CN
China
Prior art keywords
ladder
hole
drill rod
diameter
drilling rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320696059.XU
Other languages
Chinese (zh)
Inventor
赵林
高正强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU SHENG XIN ELECTRICAL AND MECHANICAL EQUIPMENT Co Ltd
Original Assignee
CHENGDU SHENG XIN ELECTRICAL AND MECHANICAL EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU SHENG XIN ELECTRICAL AND MECHANICAL EQUIPMENT Co Ltd filed Critical CHENGDU SHENG XIN ELECTRICAL AND MECHANICAL EQUIPMENT Co Ltd
Priority to CN201320696059.XU priority Critical patent/CN203640619U/en
Application granted granted Critical
Publication of CN203640619U publication Critical patent/CN203640619U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a rupturing drill rod which comprises a drill rod body, wherein a stepped through hole is formed in the drill rod body, and comprises a first step and a second step, of which the apertures are sequentially reduced from top to bottom. The rupturing drill rod further comprises a pressure adjusting spring and a water stop ball, which are arranged in the stepped through hole, wherein the pressure adjusting spring is freely placed in the stepped through hole, and the diameter of the pressure adjusting spring is between the apertures of the first and the second steps; the water stop ball is freely placed on the upper part of the pressure adjusting spring in the stepped through hole, and the diameter of the water stop ball is between the aperture of the first step and the maximum aperture of the stepped through hole; the drill rod body comprises a jet injection hole which is perpendicular to the axial direction of the drill rod and is communicated with the stepped through hole; the distance between the jet injection hole and the first step is not less than the diameter of the water stop ball. According to the drill rod, a drill bit or the drill rod is not required to be replaced when perpendicular drilling and horizontal rupturing functions are switched, so that the engineering efficiency can be greatly improved during engineering application.

Description

One is isolated and is used drilling rod
Technical field
The utility model belongs to drilling technique field, relates to a kind of drilling rod, relates in particular to a kind ofly to have stratum and isolate the drilling rod of function.
Background technology
Drilling technique is an important technology of ore deposit, ground exploitation, has extremely important status no matter be in fields such as coal mining drilling well, excavation gas pumping passage or oil explorations.Wherein mainly comprise and vertically execute brill technology and level is isolated technology, such as in coal mining, if there is gas, dust accident, not only can heavy damage production environment, and can cause casualties, cause huge loss to the people, enterprise, country.Eliminating gas exceeding limit and dust is the precondition of prevention gas, dust accident, is also one of important leverage of mine safety production.
In order to reduce the gas dust harm in mine operation, need to before digging, arrange special gas pumping tunnel, adopt underground drill rig construction extraction borehole to implement in advance gas pumping, after extraction is up to standard, can start digging coal.Concrete grammar is to use underground drill rig first to execute to bore the boring of certain depth, and then drilling rod being changed into put in after the drill rod special for isolating coal seam needs the position, coal seam of isolating again in boring, then adopts water under high pressure to isolate coal seam.In order to solve engineering problems such as being similar to mine gas extraction channel arrangement, conventionally require boring to there is certain degree of depth, and the different depth position of boring need to be isolated coal seam, this just need to repeatedly exit drilling rod and repeatedly change boring drilling rod and isolate the drill rod special in coal seam from boring.This drilling rod Renewal process can take a large amount of engineering times, affects programming.
In the prior art, due to some duration of a project anxiety or other reasons, be forced to adopt only boring and the form of construction work of not cutting, but it is very low to adopt its gas pumping rate of extraction tunnel of arranging in this way.At present also there is no to guarantee that the duration can make again the method for extraction tunnel successful.
Utility model content
The purpose of this utility model is to bore and level is isolated function switching and need to be changed drilling rod or drill bit and affect the problem of engineering efficiency in order to solve vertically to execute in existing drilling technique, has proposed a kind of isolating and has used drilling rod.
The technical solution of the utility model is: a kind of isolating with drilling rod, it is characterized in that, and comprise drilling rod body, inside has ladder hole, and ladder hole comprises the first ladder and the second ladder that aperture dwindles successively from top to bottom; Also comprise the pressure spring and the sealing ball that are placed in ladder hole, pressure spring is freely positioned in ladder hole, diameter is between the first ladder and the second ladder aperture, sealing ball is freely positioned over the top of ladder hole internal pressure-regulating spring, and diameter is between the first ladder aperture and the maximum diameter of hole of ladder hole; Drilling rod body comprise perpendicular to drilling rod axially offer and with the jet nozzle of ladder hole UNICOM, the distance of jet nozzle distance the first ladder is not less than the diameter of sealing ball.
Further, the diameter of sealing ball is 0.6 to 0.8 times of ladder hole maximum gauge.
The beneficial effects of the utility model are: a kind of isolating of the present utility model is set to ladder hole by the through hole of conventional drill with drilling rod, and pressure spring and the sealing ball of certain size be set respectively, realized for vertically execute bore time, due to less for the hydraulic pressure of executing brill, so spring is almost in free state, current are walked around bead and after the first ladder and second-order cascading, are flowed to the drill bit of terminal.In the time that needs isolate stratum, only need to improve hydraulic pressure to corresponding parameter, sealing ball is because pressure spring is pushed in the impact that is subject to water under high pressure, pressure spring is compressed, sealing ball sealing blocks up the first ladder, and the current in ladder hole are forced to penetrate through jet nozzle, reach the object of isolating stratum.Due to without more bit change or drilling rod, in engineering application, can greatly improve engineering efficiency.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation isolating with drilling rod of the present utility model.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described further.
As shown in Figure 1, the one one of the present embodiment is isolated and is comprised drilling rod body 1 with drilling rod, and inside has ladder hole, and ladder hole comprises the first ladder 3 and the second ladder 4 that aperture dwindles successively from top to bottom; Also comprise the pressure spring 6 and the sealing ball 5 that are placed in ladder hole, pressure spring is freely positioned in ladder hole, diameter is between the first ladder and the second ladder aperture, sealing ball is freely positioned over the top of ladder hole internal pressure-regulating spring, and diameter is between the first ladder aperture and the maximum diameter of hole of ladder hole; Drilling rod body comprise perpendicular to drilling rod axially offer and with the jet nozzle 2 of ladder hole UNICOM, the distance of jet nozzle distance the first ladder is not less than the diameter of sealing ball.The object of the distance setting of above-mentioned jet nozzle and the first ladder is when sealing ball is by high pressure water impact and when shutoff the first ladder, do not affect current and flow out from jet nozzle.
In order to guarantee vertically to execute, in brill process, current are smoothly by sealing ball, and the diameter of sealing ball is preferably 0.6 to 0.8 times into ladder hole maximum gauge.
It is below a kind of advantage having by the operating principle of drilling rod and with respect to existing drilling rod of isolating of the present embodiment, through hole by conventional drill is set to ladder hole, and pressure spring and the sealing ball of certain size be set respectively, realized for vertically execute bore time, due to less for the hydraulic pressure of executing brill, so spring is almost in free state, current are walked around bead and after the first ladder and second-order cascading, are flowed to the drill bit of terminal.In the time that needs isolate stratum, only need to improve hydraulic pressure to corresponding parameter, sealing ball is because pressure spring is pushed in the impact that is subject to water under high pressure, pressure spring is compressed, sealing ball sealing blocks up the first ladder, and the current in ladder hole are forced to penetrate through jet nozzle, reach the object of isolating stratum.Due to without more bit change or drilling rod, in engineering application, can greatly improve engineering efficiency.
Those of ordinary skill in the art will appreciate that, embodiment described here is in order to help reader understanding's principle of the present utility model, should be understood to that protection domain of the present utility model is not limited to such special statement and embodiment.Those of ordinary skill in the art can make various other various concrete distortion and combinations that do not depart from the utility model essence according to disclosed these technology enlightenments of the utility model, and these distortion and combination are still in protection domain of the present utility model.

Claims (2)

1. isolate with a drilling rod, it is characterized in that, comprise drilling rod body, inside has ladder hole, and ladder hole comprises the first ladder and the second ladder that aperture dwindles successively from top to bottom; Also comprise the pressure spring and the sealing ball that are placed in ladder hole, pressure spring is freely positioned in ladder hole, diameter is between the first ladder and the second ladder aperture, sealing ball is freely positioned over the top of ladder hole internal pressure-regulating spring, and diameter is between the first ladder aperture and the maximum diameter of hole of ladder hole; Drilling rod body comprise perpendicular to drilling rod axially offer and with the jet nozzle of ladder hole UNICOM, the distance of jet nozzle distance the first ladder is not less than the diameter of sealing ball.
2. drilling rod according to claim 1, is characterized in that, the diameter of sealing ball is 0.6 to 0.8 times of ladder hole maximum gauge.
CN201320696059.XU 2013-11-05 2013-11-05 Rupturing drill rod Expired - Fee Related CN203640619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320696059.XU CN203640619U (en) 2013-11-05 2013-11-05 Rupturing drill rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320696059.XU CN203640619U (en) 2013-11-05 2013-11-05 Rupturing drill rod

Publications (1)

Publication Number Publication Date
CN203640619U true CN203640619U (en) 2014-06-11

Family

ID=50871874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320696059.XU Expired - Fee Related CN203640619U (en) 2013-11-05 2013-11-05 Rupturing drill rod

Country Status (1)

Country Link
CN (1) CN203640619U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090190A (en) * 2021-04-08 2021-07-09 中国矿业大学(北京) Mining hydraulic punching steering valve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113090190A (en) * 2021-04-08 2021-07-09 中国矿业大学(北京) Mining hydraulic punching steering valve

Similar Documents

Publication Publication Date Title
CN102619552B (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN102852506B (en) High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN102383828B (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN103742115B (en) A kind of coal mine underground fracturing sealing device and method
CN101666241B (en) Integrated drilling-blasting-pressurizing-drawing protrusion preventing method for regional gas control
CN104131832A (en) High-gas-content coal seam punching cutting pressing and sucking integral pressure relief and antireflection gas extraction method
CN105332684A (en) High-pressure water burst and CO2 fracturing combined coal bed gas displacement extraction technology
CN105507858A (en) Immiscible gas injection and oil replacement type exploitation method for ultra-deep fractured-vuggy carbonate reservoirs
CN103233768B (en) Horizontal-drilling staged-fracturing pressure relief method for underground coal bed
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN104481574A (en) Method for improving coal seam gas permeability through high energy acoustoelectric composite technology
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN102704905A (en) Segmental hydraulic fracturing coal seam pressure releasing device and method
CN108868825B (en) Rapid plugging method for high-pressure large-water-inrush drilling
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN102678092A (en) Method for commonly extracting coal and coal bed gas by up-hole and down-hole joint construction
CN105178933A (en) Environmental protection type under-well formation fracturing device
CN106837268A (en) Control water gas-injection oil-production integration method for increasing
CN105804786A (en) Method for layer penetrating, drilling, pressing punching and permeability improving of soft coal seam floor
CN105201483A (en) Environment-friendly downhole stratum fracturing method
CN104453806A (en) Method for removing sandstone condensate gas reservoir water lock through nitrogen injection
CN105781552A (en) Novel high-gas outburst coal seam stereoscopic punching crosscut coal uncovering method
WO2020006870A1 (en) Gas extraction hole drilling and hole sealing method for building anti-seepage barrier based on grooving-backfilling method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20141105

EXPY Termination of patent right or utility model