CN203640317U - Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof - Google Patents

Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof Download PDF

Info

Publication number
CN203640317U
CN203640317U CN201320639447.4U CN201320639447U CN203640317U CN 203640317 U CN203640317 U CN 203640317U CN 201320639447 U CN201320639447 U CN 201320639447U CN 203640317 U CN203640317 U CN 203640317U
Authority
CN
China
Prior art keywords
plastic film
concrete
circular shaft
rear end
end segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320639447.4U
Other languages
Chinese (zh)
Inventor
张勋来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201320639447.4U priority Critical patent/CN203640317U/en
Application granted granted Critical
Publication of CN203640317U publication Critical patent/CN203640317U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a film layer laying device for cracking prevention and maintaining in the casting of a concrete floor and a concrete roof, and belongs to an auxiliary civil construction device. The film layer laying device is characterized by mainly comprising a plastic film roll, bearings, a circular shaft, pull rods and an operating handle, wherein the plastic film roll is a rolled plastic film arranged in the forward and backward directions and provided with an axial center hole; the circular shaft penetrates the axial center hole of the plastic film roll, and the front end segment and the rear end segment of the circular shaft can extend out of the plastic film roll symmetrically and respectively; the bearings are respectively and fixedly mounted at the front end segment and the rear end segment of the circular shaft; the forked pull rods are respectively welded on the peripheral surfaces of the bearings at the front end segment and the rear end segment; the operating handle is welded between the other ends of the pull rods at the front end and the rear end; a constructor holds one pull rod or the operating handle to operate rightwards, the plastic film is laid on the surface of concrete clockwise, the operation is simple, the use is flexible, the construction quality is improved, and the construction cost is reduced.

Description

The laying apparatu of anti-cracking and curing membrane layer when concrete building, roofing are built
Technical field
The utility model Shu Gong China Democratic National Construction Association construction auxiliary device, the device of anti-cracking and maintenance when especially relating to a kind of concrete building, roofing and building.
Background technology
In the building of industrial and civil architecture, in roofing construction process, in order to prevent better concrete building, the cracking of roofing in conjunction with maintenance, various preventive action have been taked in job site, comprise and increase compacting number of times, shorten the interval time of watering maintenance etc., in addition, the measure of anti-cracking and maintenance has also been proposed from construction technology and management, but in the case of current construction technology and not rigorous way to manage, above-mentioned preventive action often can not prevent the cracking of concrete pavement effectively, not only waste material and manpower, and affect workmanship and programming.
Summary of the invention
The laying apparatu of the purpose of this utility model is to provide a kind of concrete building, roofing while building anti-cracking and curing membrane layer, not only simple and practical, and effectively control the planeness of concrete building, roofing and fast
Speed strengthens concrete intensity, can also improve construction quality, saves man-hour, reduces construction cost.
The purpose of this utility model is achieved like this, anti-opening when a kind of concrete building, roofing are built
Split and the laying apparatu of curing membrane layer (being called for short the laying apparatu of thin layer), it is characterized in that: this coagulation
Tulou, when roofing is built, the laying apparatu of anti-cracking and curing membrane layer is mainly by plastic film rolls, bearing, circular shaft, pull bar and operating grip composition, this plastic film rolls is the plastic sheeting to rolling that arrange and with axial center hole before and after being, in the axial center hole of this plastic film rolls, install circular shaft and make the front end rigion of circular shaft and rear end section is stretched out plastic film rolls outside respectively symmetrically, this circular shaft can be made with the round steel that diameter is 20 ㎜, in the front end rigion of this circular shaft and rear end section, fixedly mount respectively bearing, fork-shaped pull bar is welded respectively on the outer peripheral face of these former and later two bearings, and the operating grip that is welded between the other end of front and back pull bar.
When use, in building, after roofing concrete is built and is finished and strike off, can use the laying apparatu of this thin layer that plastic sheeting is covered on concrete surface, first plastic film rolls is opened and is placed on concrete surface, due to the concrete surface moisture abundance being just shaped, and plastic sheeting chance water is sticky, like this, constructor holds pull bar or the operation of operating grip right lateral, by plastic sheeting disposable being laid on concrete surface in the direction of the clock, until by whole concrete building, unoccupied place all standing that roofing is seamless, simple to operate, use flexibly, improve construction quality, save man-hour, reduce construction cost.
The laying apparatu of anti-cracking and curing membrane layer when concrete building, the roofing that the utility model proposes built, not only simple and practical, and effectively control the planeness of concrete building, roofing and strengthened fast concrete intensity, improve construction quality, save man-hour, reduced construction cost.
When concrete building, the roofing now in conjunction with the accompanying drawings and embodiments the utility model being proposed built, the laying apparatu of anti-cracking and curing membrane layer is further described.
Brief description of the drawings
Fig. 1 is that concrete building, roofing that the utility model the proposes master when laying apparatu of anti-cracking and curing membrane layer uses while building looks schematic diagram.
In Fig. 1: 1, plastic film rolls 2, bearing 3, circular shaft 4, pull bar 5, operating grip.
Detailed description of the invention
As can be seen from Figure 1: a kind of concrete building, the laying apparatu of anti-cracking and curing membrane layer when roofing is built (being called for short the laying apparatu of thin layer), it is characterized in that: this concrete building, when roofing is built, the laying apparatu of anti-cracking and curing membrane layer is mainly by plastic film rolls 1, bearing 2, circular shaft 3, pull bar 4 and operating grip 5 form, this plastic film rolls 1 is the plastic sheeting to rolling that arrange and with axial center hole before and after being, in the axial center hole of this plastic film rolls 1, install circular shaft 3 and make the front end rigion of circular shaft 3 and rear end section is stretched out plastic film rolls 1 outside respectively symmetrically, this circular shaft 3 can be made with the round steel that diameter is 20 ㎜, in the front end rigion of this circular shaft 3 and rear end section, fixedly mount respectively bearing 2, fork-shaped pull bar 4 is welded respectively on the outer peripheral face of these former and later two bearings 2, and the operating grip 5 that is welded between the other end of front and back pull bar.
When use, in building, after roofing concrete is built and is finished and strike off, can use the laying apparatu of this thin layer that plastic sheeting is covered on concrete surface, first plastic film rolls 1 is opened and is placed on concrete surface, due to the concrete surface moisture abundance being just shaped, and plastic sheeting chance water is sticky, like this, constructor holds pull bar 4 or operating grip 5 right lateral operations, by plastic sheeting disposable being laid on concrete surface in the direction of the clock, until by whole concrete building, unoccupied place all standing that roofing is seamless, simple to operate, use flexibly, improve construction quality, save man-hour, reduce construction cost.

Claims (2)

1. a concrete building, the laying apparatu of anti-cracking and curing membrane layer when roofing is built, it is characterized in that: this concrete building, when roofing is built, the laying apparatu of anti-cracking and curing membrane layer is mainly by plastic film rolls (1), bearing (2), circular shaft (3), pull bar (4) and operating grip (5) composition, this plastic film rolls (1) is the plastic sheeting to rolling that arrange and with axial center hole before and after being, in the axial center hole of this plastic film rolls (1), install circular shaft (3) and make the front end rigion of circular shaft (3) and rear end section is stretched out plastic film rolls (1) outside respectively symmetrically, in the front end rigion of this circular shaft (3) and rear end section, fixedly mount respectively bearing (2), fork-shaped pull bar (4) is welded respectively on the outer peripheral face of these former and later two bearings (2), and the operating grip (5) that is welded between the other end of front and back pull bar.
2. the laying apparatu of anti-cracking and curing membrane layer when concrete building according to claim 1, roofing are built, is characterized in that this circular shaft (3) diameter is that the round steel of 20 ㎜ is made.
CN201320639447.4U 2013-10-17 2013-10-17 Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof Expired - Lifetime CN203640317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320639447.4U CN203640317U (en) 2013-10-17 2013-10-17 Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320639447.4U CN203640317U (en) 2013-10-17 2013-10-17 Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof

Publications (1)

Publication Number Publication Date
CN203640317U true CN203640317U (en) 2014-06-11

Family

ID=50871573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320639447.4U Expired - Lifetime CN203640317U (en) 2013-10-17 2013-10-17 Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof

Country Status (1)

Country Link
CN (1) CN203640317U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806063A (en) * 2015-04-22 2015-07-29 中国十七冶集团有限公司 Silo slip form covering film maintenance device and construction method
CN108252187A (en) * 2016-12-28 2018-07-06 中国二十冶集团有限公司 Concrete curing membrane laying system and laying method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806063A (en) * 2015-04-22 2015-07-29 中国十七冶集团有限公司 Silo slip form covering film maintenance device and construction method
CN104806063B (en) * 2015-04-22 2017-02-01 中国十七冶集团有限公司 Silo slip form covering film maintenance device and construction method
CN108252187A (en) * 2016-12-28 2018-07-06 中国二十冶集团有限公司 Concrete curing membrane laying system and laying method

Similar Documents

Publication Publication Date Title
CN202559540U (en) Waterproof plugging structure for outer wall split bolt hole
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN203640317U (en) Film layer laying device for cracking prevention and maintaining in concrete casting of concrete floor and concrete roof
CN204826614U (en) Exempt from to tear open precast concrete wall form
CN204023578U (en) Retaining Structure with Double-row Piles
CN203296186U (en) Blocking plug cap for tension screw reserved hole
CN206479124U (en) Roof steel bar protective layer thickness detects instrument
CN203007997U (en) Precast concrete plank aproll
CN203441110U (en) Surface layer concrete surface troweling, covering and maintaining integrated construction device
CN203160693U (en) Detachable water stopping screw
CN106836559A (en) Reinforced concrete wall structure capable of preventing cracking and construction method thereof
CN203878755U (en) Embedded component
CN203603480U (en) Recoverable embedded type reserved hole shaping mold
CN109208491B (en) Bridge rotation construction traction equipment control method and system
CN207314349U (en) A kind of separate type construction trolley for water conservancy project panel concrete quadric-plastering
CN204001281U (en) A kind of cast-in-place framework and shear wall construction structure
CN203742196U (en) Reinforcement structure based on non-shrinkage concrete
CN203045951U (en) Prefabricated concrete cable working well mold
CN204282413U (en) A kind of pile crown water proof structure
CN110145127A (en) A kind of concrete cast-in-situ plate thickness controller and Bars In Poured Concrete Slab construction
CN204225354U (en) A kind of high strength prefabricated units
CN204357128U (en) Construction formwork pull bar
CN105064359A (en) Unbonded prestressed construction anchor rod
CN209623566U (en) A kind of check device of controllable thickness of concrete floor
CN210395826U (en) Autoclaved aerated concrete doped with building wastes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140611

CX01 Expiry of patent term