Concrete floor formwork supporting and arranging tool Download PDF

Info

Publication number
CN203603481U
CN203603481U CN201320614634.7U CN201320614634U CN203603481U CN 203603481 U CN203603481 U CN 203603481U CN 201320614634 U CN201320614634 U CN 201320614634U CN 203603481 U CN203603481 U CN 203603481U
Authority
CN
China
Prior art keywords
formwork
drill rod
supporting
steel chisel
concrete floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320614634.7U
Other languages
Chinese (zh)
Inventor
徐辉
胡亚勃
张国平
蔡继斌
曾发鉴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201320614634.7U priority Critical patent/CN203603481U/en
Application granted granted Critical
Publication of CN203603481U publication Critical patent/CN203603481U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a concrete floor formwork supporting and arranging tool which is used for supporting and arranging a floor formwork. The concrete floor formwork supporting and arranging tool comprises a formwork face plate, a positioning device, a connecting reinforcing steel rib, a force bearing support and a sleeve. The positioning device is composed of a limiting steel chisel and adjustable nuts. The limiting steel chisel is arranged on the formwork face plate. The adjustable nuts are arranged on the limiting steel chisel. The connecting reinforcing steel rib is arranged between the limiting steel chisel and the force bearing support. The sleeve is arranged on the limiting steel chisel and the force bearing support. The limiting steel chisel penetrates through the formwork face plate. The adjusting nuts are arranged at the two ends of the limiting steel chisel and screwed on the formwork face plate. A main body of the concrete floor formwork supporting and arranging tool is structurally composed of box iron, the steel chisel, expansion bolts and the connecting reinforcing steel rib, and the concrete floor formwork supporting and arranging tool is simple in structure and convenient to operate; the height of the supporting formwork is easy to adjust due to the adjustable nuts on the limiting steel chisel of the formwork face plate, and the formwork is good in flatness; stability of a supporting frame is improved due to the force bearing support; the concrete floor formwork supporting and arranging tool can be repeatedly used, the floor concrete pouring and forming quality can be improved, the construction speed can be increased, and construction raw materials can be saved.

Description

Terrace concrete blinding installs instrument
Technical field
The utility model relates to a kind of formwork erection instrument, and especially a kind of terrace concrete blinding installs instrument.
Background technology
Along with social progress and China's expanding economy, common low layer and multistory building can not meet the demand of Development of Urbanization, and for adapting to the high speed development in city, highrise building progressively increases.At present, for alleviating urban ground traffic pressure, office building, house and Commercial Complex contour level building are established parking lot at basement mostly, and basement terrace is generally provided with concrete laying layer to improve terrace anti-wear performance.In construction general adopt wooden form as terrace concrete side to template, adopt the fixing wooden form of reinforcing bar, the problems such as this erection method exists and repeatedly sets up/remove, efficiency of construction is low, management difficulty is large, thereby very difficult satisfied construction needs, and its side direction template very easily produces skew, directly affect the concrete surface discrepancy in elevation, terrace concrete formation is second-rate.
Utility model content
Repeatedly set up for solving wooden form the problem that Demolition Construction efficiency is low, template is easily offset, concrete formation is second-rate, the utility model provides a kind of terrace concrete blinding easy to operate, that template planeness is good, concreting Forming Quality is high, speed of application is fast to install instrument.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of terrace concrete blinding installs instrument, comprise form surfacing and positioner, described positioner is made up of spacing drill rod and adjustable nut, and described form surfacing is provided with spacing drill rod, described spacing drill rod is provided with adjustable nut, between described spacing drill rod and stressed support, is provided with connecting reinforcement.
Described spacing drill rod and stressed support are provided with sleeve.
Described form surfacing is ganoid channel-section steel.
Described spacing drill rod runs through form surfacing, and form surfacing upper end is located on described spacing drill rod top, and bottom is run through form surfacing and is located on structural plane.
Described stressed support is corresponding with spacing drill rod to be located at outside form surfacing, and the bottom of stressed support is located in structural plane.
Described adjustable nut is located at spacing drill rod two ends and is tightened on form surfacing.
Described form surfacing top and bottom correspondence is provided with spacing drill rod hole.
The beneficial effects of the utility model are:
The utility model agent structure is made up of channel-section steel, drill rod, expansion bolt and connecting reinforcement, and simple structure is easy to operate; Adjustable nut on spacing drill rod on form surfacing makes formwork height be easy to adjust, and template planeness is better; The bracing frame stability that is arranged so that of stressed support improves, and the utility model can reuse, and both can improve terrace concreting Forming Quality, can accelerate again speed of application, can also save construction raw material.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail.
Fig. 1 is lateral view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is stereogram of the present utility model.
In figure, 1. form surfacing, 2. spacing drill rod, 3. adjustable nut, 4. stressed support, 5. connecting reinforcement, 6. sleeve.
The specific embodiment
As shown in Figure 1-Figure 3, terrace concrete blinding installs instrument and is made up of form surfacing 1, spacing drill rod 2, adjustable nut 3, stressed support 4, connecting reinforcement 5 and sleeve 6.
Form surfacing 1 is preferably ganoid channel-section steel, and channel-section steel web and terrace concrete join, and on the channel-section steel edge of a wing, spacing 1000mm opens the spacing drill rod hole of φ 22mm, gap, bottom backing plate when installation.Form surfacing 1 is fixed in stressed support 4 by spacing drill rod 2, connecting reinforcement 5 and sleeve 6, and by adjustable nut 3 adjusting elevations.
The common formation positioner of spacing drill rod 2 and adjustable nut 3, spacing drill rod is preferably φ 20 drill rods, and through bottom flange on channel-section steel, with the skew of limiting groove steel facing, spacing drill rod 2 two ends are provided with 50mm long filament and buckle, spacing drill rod 2 is through the spacing drill rod hole on the channel-section steel edge of a wing, and limiting groove steel facing moves.Spacing drill rod 2 two ends screw thread parts are installed adjustable nut 3, and adjustable nut 3 is screwed onto channel-section steel surface, and adjustable nut 3 is used for adjusting form surfacing 1 position.
In spacing drill rod 2 respective horizontal, stressed support 4 is installed, two connecting reinforcements 5 of welding between stressed support 4 and spacing drill rod 2, stressed support 4 is preferably M14 expansion bolt, and 30-50mm in structural plane is squeezed into in its underpart, and stressed support is mainly used in bearing terrace concrete lateral pressure.
On stressed support 4 and spacing drill rod 2, sleeve 6 is all installed, sleeve 6 is steel hollow steel tube, and two sleeves 6 are welded to connect as entirety by reinforcing bar.
Should be understood that, the above-mentioned specific embodiment of the present utility model is only for exemplary illustration or explain principle of the present utility model, and do not form restriction of the present utility model.Therefore any modification of, making, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model in the situation that not departing from spirit and scope of the present utility model.In addition, the utility model claims are intended to contain whole variations and the modification in the equivalents that falls into claims scope and border or this scope and border.

Claims (7)

1. a terrace concrete blinding installs instrument, comprise form surfacing (1) and positioner, it is characterized in that: described positioner is made up of spacing drill rod (2) and adjustable nut (3), described form surfacing (1) is provided with spacing drill rod (2), described spacing drill rod (2) is provided with adjustable nut (3), between described spacing drill rod (2) and stressed support (4), is provided with connecting reinforcement (5).
2. terrace concrete blinding according to claim 1 installs instrument, it is characterized in that: described spacing drill rod (2) and stressed support (4) are provided with sleeve (6).
3. terrace concrete blinding according to claim 1 installs instrument, it is characterized in that: described form surfacing (1) is ganoid channel-section steel.
4. terrace concrete blinding according to claim 3 installs instrument, it is characterized in that: described spacing drill rod (2) runs through form surfacing (1), form surfacing (1) upper end is located on described spacing drill rod (2) top, and bottom is run through form surfacing (1) and is located on structural plane.
5. terrace concrete blinding according to claim 4 installs instrument, it is characterized in that: described stressed support (4) is corresponding with spacing drill rod (2) to be located at outside form surfacing (1), and the bottom of stressed support (4) is located in structural plane.
6. terrace concrete blinding according to claim 5 installs instrument, it is characterized in that: described adjustable nut (3) is located at spacing drill rod (2) two ends and is tightened on form surfacing (1).
7. terrace concrete blinding according to claim 4 installs instrument, it is characterized in that: described form surfacing (1) top and bottom correspondence is provided with spacing drill rod hole.
CN201320614634.7U 2013-09-30 2013-09-30 Concrete floor formwork supporting and arranging tool Expired - Fee Related CN203603481U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320614634.7U CN203603481U (en) 2013-09-30 2013-09-30 Concrete floor formwork supporting and arranging tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320614634.7U CN203603481U (en) 2013-09-30 2013-09-30 Concrete floor formwork supporting and arranging tool

Publications (1)

Publication Number Publication Date
CN203603481U true CN203603481U (en) 2014-05-21

Family

ID=50716161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320614634.7U Expired - Fee Related CN203603481U (en) 2013-09-30 2013-09-30 Concrete floor formwork supporting and arranging tool

Country Status (1)

Country Link
CN (1) CN203603481U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499156A (en) * 2016-09-14 2017-03-15 中国建筑第八工程局有限公司 The reinforcement tools and its reinforcement means of template in cast-in-place ground surface layer
CN108086110A (en) * 2017-12-08 2018-05-29 中冶天工集团天津有限公司 A kind of construction method and auxiliary device of the support of concrete road side form

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499156A (en) * 2016-09-14 2017-03-15 中国建筑第八工程局有限公司 The reinforcement tools and its reinforcement means of template in cast-in-place ground surface layer
CN108086110A (en) * 2017-12-08 2018-05-29 中冶天工集团天津有限公司 A kind of construction method and auxiliary device of the support of concrete road side form

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN206521678U (en) Template fixed support device
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN103352471B (en) Container prefabricated house assembling type steel reinforced concrete single-double-column foundation and construction method thereof
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN203603481U (en) Concrete floor formwork supporting and arranging tool
CN103343547B (en) Container type prefabricated house assembling steel reinforced concrete four patten and construction method
CN203129203U (en) Rubble retaining wall reinforcing single-face formwork supporting system
CN204715763U (en) A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure
CN204456159U (en) A kind of steel kind design concrete anchor location structure
CN209145280U (en) A kind of beam form board supporting structure
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN202969897U (en) Ringlock type scaffold joist system
CN202194392U (en) Floorslab thickness control device
CN203129579U (en) Slip form rail locking device
CN102352607A (en) Full water stopping side wall template system
CN204139570U (en) Containing the pre-buried fastening devices of detachable overhanging type steel beam of horizontal fixation kit
CN103216087B (en) A kind of two-way self-bearing type construction formwork system
CN202266025U (en) Support structure for on-site concrete beam template
CN202117390U (en) Segmentally spliced water tank tower
CN202108299U (en) Segmented assembled water tank tower with adjustable height
CN204728474U (en) Precast wall panel connecting box
CN204552115U (en) For the floating screed part that structure flooring high accuracy is levelling
CN203669372U (en) Foot locking device for fixing aluminum die lower feet of top die system
CN104234417B (en) The special reinforcement system of gear-like pilaster groove template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20210930