CN203592449U - Standard section tool of construction lifter - Google Patents
Standard section tool of construction lifter Download PDFInfo
- Publication number
- CN203592449U CN203592449U CN201320666292.3U CN201320666292U CN203592449U CN 203592449 U CN203592449 U CN 203592449U CN 201320666292 U CN201320666292 U CN 201320666292U CN 203592449 U CN203592449 U CN 203592449U
- Authority
- CN
- China
- Prior art keywords
- screw rod
- fixed
- side panel
- bracket assembly
- standard section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a standard section tool of a construction lifter. The standard section tool of the construction lifter comprises a bottom frame, a first support assembly, a second support assembly, a left side panel, a right side panel, a first screw rod, a second screw rod, supporting rods, a first positioning pin, a second positioning pin, rectangular pipes, a positioning plate and threaded sleeves, the first support assembly and the second support assembly are fixed to the bottom frame, the left side panel is arranged at the upper end of the first support assembly, the first screw rod and the second screw rod are fixed to the two ends of the left side panel respectively, the right side panel is arranged at the upper end of the second support assembly, the right side panel is fixed to the positioning plate through the first positioning pin and the second positioning pin, the supporting rods are arranged between the left side panel and the right side panel and fixed through the rectangular pipes, and the rectangular pipes and the positioning plate are fixed through the threaded sleeves. The standard section tool of the construction lifter has the advantages that positioning and installation are carried out through the screw rods, guide bolts and the threaded sleeves, the installation tolerance of a standard section can be adjusted timely, the problem of too poor perpendicularity of the standard section tool is solved, the operation quality is guaranteed, the working efficiency is improved, and the labor intensity of workers is reduced.
Description
Technical field
The utility model relates to building hoist standard knot frock.
Background technology
Current building hoist is widely used in various engineering constructions construction, and the quality of the quality of building hoist own to it security in construction particularly important, standard knot is building hoist vitals, perpendicularity and assembly precision when being related to lift and installing, the quality problems such as will cause can not installing, perpendicularity is overproof if done well.
Summary of the invention
For overcoming the deficiencies in the prior art, the purpose of this utility model is to provide a kind of building hoist standard knot frock, improves standard knot frock precision, solves the overproof problem of perpendicularity.
For achieving the above object, the utility model is achieved through the following technical solutions:
A kind of building hoist standard knot frock, comprise underframe, bracket assembly I, bracket assembly II, Left-Hand Panel, right panel, screw rod I, screw rod II, pole, alignment pin I, alignment pin II, rectangular tube, location-plate, thread bush, on underframe, be fixed with bracket assembly I and bracket assembly II, bracket assembly I upper end is provided with Left-Hand Panel, Left-Hand Panel two ends are fixed with respectively screw rod I and screw rod II, bracket assembly II upper end is provided with right panel, right panel is fixed by alignment pin I and alignment pin II and location-plate, between Left-Hand Panel and right panel, be fixed with pole, between pole, fix by rectangular tube, between rectangular tube and location-plate, fix by thread bush.
Described screw rod I outer setting fairlead, screw rod I end is square toes.
Described screw rod II outer setting positioning sleeve, screw rod II and positioning sleeve are fixed by guide blot, and screw rod II end is square toes.
Compared with prior art, the beneficial effects of the utility model are:
Utilize screw rod, guide blot, thread bush location and installation, the location tolerance of adjustment criteria joint, has solved the overproof problem of standard knot frock perpendicularity in time, has guaranteed operation quality, has improved operating efficiency, has reduced labor strength.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the cutaway view of Fig. 1 along A-A line.
In figure: 1-underframe 2-bracket assembly I 3-bracket assembly II 4-Left-Hand Panel 5-right panel 6-fairlead 7-screw rod I 8-screw rod II 9-guide blot 10-positioning sleeve 11-pole 12-alignment pin I 13-alignment pin II 14-rectangular tube 15-location-plate 16-thread bush.
The specific embodiment
Below in conjunction with Figure of description, the utility model is described in detail, but should be noted that enforcement of the present utility model is not limited to following embodiment.
See Fig. 1, Fig. 2, a kind of building hoist standard knot frock, comprise underframe 1, bracket assembly I 2, bracket assembly II 3, Left-Hand Panel 4, right panel 5, fairlead 6, screw rod I 7, screw rod II 8, guide blot 9, positioning sleeve 10, pole 11, alignment pin I 12, alignment pin II 13, rectangular tube 14, location-plate 15, thread bush 16, on underframe 1, be fixed with bracket assembly I 2 and bracket assembly II 3, bracket assembly I 2 upper ends are provided with Left-Hand Panel 4, Left-Hand Panel 4 two ends are fixed with screw rod I 7 and screw rod II 8, bracket assembly II 3 upper ends are provided with right panel 5, right panel 5 is fixing with location-plate 15 by alignment pin I 12 and alignment pin II 13, between Left-Hand Panel 4 and right panel 5, be fixed with pole 11, fixing by rectangular tube 14 between pole 11, fixing by thread bush 16 between rectangular tube 14 and location-plate 15.
Screw rod I arranged outside fairlead 6, screw rod I 7 ends are square toes.
Screw rod II 8 arranged outside positioning sleeves 10, screw rod II 8 and positioning sleeve 10 are fixing by guide blot 9, and screw rod II 9 ends are square toes.
The utility model utilizes screw rod, guide blot, thread bush location and installation, and the location tolerance of adjustment criteria joint, has solved the overproof problem of standard knot frock perpendicularity in time, has guaranteed operation quality, has improved operating efficiency, has reduced labor strength.
Claims (3)
1. a building hoist standard knot frock, it is characterized in that, comprise underframe, bracket assembly I, bracket assembly II, Left-Hand Panel, right panel, screw rod I, screw rod II, pole, alignment pin I, alignment pin II, rectangular tube, location-plate, thread bush, on underframe, be fixed with bracket assembly I and bracket assembly II, bracket assembly I upper end is provided with Left-Hand Panel, Left-Hand Panel two ends are fixed with respectively screw rod I and screw rod II, bracket assembly II upper end is provided with right panel, right panel is fixed by alignment pin I and alignment pin II and location-plate, between Left-Hand Panel and right panel, be fixed with pole, between pole, fix by rectangular tube, between rectangular tube and location-plate, fix by thread bush.
2. a kind of building hoist standard knot frock according to claim 1, is characterized in that, described screw rod I outer setting fairlead, and screw rod I end is square toes.
3. a kind of building hoist standard knot frock according to claim 1, is characterized in that, described screw rod II outer setting positioning sleeve, and screw rod II and positioning sleeve are fixed by guide blot, and screw rod II end is square toes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320666292.3U CN203592449U (en) | 2013-10-25 | 2013-10-25 | Standard section tool of construction lifter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320666292.3U CN203592449U (en) | 2013-10-25 | 2013-10-25 | Standard section tool of construction lifter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203592449U true CN203592449U (en) | 2014-05-14 |
Family
ID=50673388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320666292.3U Expired - Fee Related CN203592449U (en) | 2013-10-25 | 2013-10-25 | Standard section tool of construction lifter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203592449U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109455428A (en) * | 2018-12-18 | 2019-03-12 | 江苏建友工程机械有限公司 | A kind of secondary pressure discharge type storage device for liquid oxygen |
-
2013
- 2013-10-25 CN CN201320666292.3U patent/CN203592449U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109455428A (en) * | 2018-12-18 | 2019-03-12 | 江苏建友工程机械有限公司 | A kind of secondary pressure discharge type storage device for liquid oxygen |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203130663U (en) | Guide oil cylinder internally provided with guide rod | |
CN203592449U (en) | Standard section tool of construction lifter | |
CN203948414U (en) | Telescopic universal connecting piece | |
CN202299020U (en) | A unit pottery pipe decoration curtain wall member | |
CN204316035U (en) | One is easy to dismantle flexible suspended cable crane span structure | |
CN203791344U (en) | Connection structure for connecting shaft bracket and rolling mill base in short stress path rolling mill | |
CN204164604U (en) | A kind of new mechanical and electrical equipment installs positioning adjustment device | |
CN203374000U (en) | Welded tensioning device | |
CN202323727U (en) | Device for adjusting horizontal position of steel box girder | |
CN205033159U (en) | Crane span structure leveling connecting device | |
CN204235501U (en) | A kind of blower fan water-cooling system triple valve replacing frock | |
CN204081984U (en) | The assembling cat ladder that a kind of Construction of Steel Structure is general | |
CN205100376U (en) | Threaded connection's circular steel tube post | |
CN204782061U (en) | Constructional steel constructs lift supports | |
CN203475680U (en) | Stable-in-connection composite color steel plate | |
CN204060000U (en) | Prefabricated cladding panel construction Special positioning tool | |
CN207844941U (en) | A kind of omnipotent tower crane adjusting yoke of inner cased type | |
CN203411226U (en) | Common lifting device for cable bridge and vent pipeline | |
CN206267035U (en) | A kind of railway shield installs adjuster | |
CN204848024U (en) | Girder steel hoist device for construction | |
CN202391087U (en) | Vertical truss piece of scaffold | |
CN202881655U (en) | Bracket fixing arm of quilting machine | |
CN104088453B (en) | A kind of scaffold edge support structure and using method thereof | |
CN204139571U (en) | Straddle block formula hitch | |
CN203961122U (en) | A kind of Two bors d's oeuveres C section steel purlin termination that is applicable to large span purlin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140514 Termination date: 20151025 |
|
EXPY | Termination of patent right or utility model |