CN203584443U - Full-section roadway anchor rod and anchor cable integrated parallel mounting device - Google Patents

Full-section roadway anchor rod and anchor cable integrated parallel mounting device Download PDF

Info

Publication number
CN203584443U
CN203584443U CN201320760828.8U CN201320760828U CN203584443U CN 203584443 U CN203584443 U CN 203584443U CN 201320760828 U CN201320760828 U CN 201320760828U CN 203584443 U CN203584443 U CN 203584443U
Authority
CN
China
Prior art keywords
anchor
anchor cable
cable
fixed
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320760828.8U
Other languages
Chinese (zh)
Inventor
郑东风
周斌
翟明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320760828.8U priority Critical patent/CN203584443U/en
Application granted granted Critical
Publication of CN203584443U publication Critical patent/CN203584443U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a full-section roadway anchor rod and anchor cable integrated parallel mounting device, realizes full-section parallel mounting among anchor rods, anchor cables and anchor rods and anchor cables, and solves the roadway supporting problem which restricts the roadway advance rate. The method is characterized in that according to specific positions of the anchor rods and the anchor cables in a roadway supporting design, one anchor rod and one anchor cable correspond to one drilling machine, all drilling machines are fixed onto a moving frame, the device is moved forwards after a heading machine advances by an anchor distance, simultaneous placement and simultaneous drilling of each full-section roadway anchor rod and anchor cable drilling machine are realized, and the anchor rods and the anchor cables are mounted in parallel. The device comprises a fixed frame, joist jacks, the anchor cable and anchor rod drilling machines, a dragging device, a storage rack, a scaffold ladder, a scaffold platform, a hydraulic integrated console and the like, wherein the joist jacks are fixed to two sides of the front end of the fixed frame, the anchor cable and anchor rod drilling machines are fixed to crossbeams or vertical columns of the frame, the dragging device is fixed to the front end of the frame, the storage rack is positioned in the middle of the frame and used for placement of the anchor rods and accessories of the anchor rods and the anchor cables, and the hydraulic integrated console is mounted on one side of the frame.

Description

The integrated parallel installation device of a kind of full section anchor shaft anchor cable in tunnel
Technical field
The utility model relates to a kind of tunnel integrated parallel installation device of full section anchor shaft anchor cable and method, be mainly used in mine working bolting and rope support engineering, this device can become one with other laneway temporary support devices or the auxiliary means of locomotion of installing.
Background technology
Mine engineering comprehensive mechanized driving bolt support construction technology, because it is safe and reliable, singly enter efficiency far above traditional big gun tunneling process, at present by wide popularization and application.A circulation of comprehensive mechanized driving bolt support construction technology main consuming time in tunneling machine cutting and roadway support.How to improve jewel hole facility, how to improve rockbolt installation speed, how to realize the parallel installation of multiple anchor poles, how to realize roadway support and tunneling machine cutting parallel operations, from eighties of last century the fifties so far, Mining At Home And Abroad circle has carried out a large amount of explorations, and has produced a lot of technology and equipment.
Existing jumbolter has pick anchor integral type, machine-carried type, drill carriage formula, monomer-type by structure difference; By broken rock principle difference, there are swinging, impact type, impact rotating formula, rotary-percussion; By mechanism's power difference, there are fluid pressure type, pneumatic type, electrodynamic type.Wherein in jumbolter structure, dig anchor integral type, drill carriage formula is the main object of current technological progress.
Pick anchoring integral development machine, from sixties first generation anchor driving machine, be born and carried out so far twice large change, third generation pick anchoring integral, although realized the parallel operations of pick anchor, bolt support unsupported back span is large, generally more than 1.2-1.5 rice, supporting can not be immediately following meeting head on, so, be only applicable to dark little, the ore deposit of Bian and press little, the preferably large Cross-Section Rectangular of wall rock condition or trapezoidal tunnel, therefore, never applied widely.As China's overwhelming majority mining area, open the Bian degree of depth darker, ore deposit is pressed large, the conditions such as country rock soft broken, anchor pole is intensive, even also needs linked network, cable bolting, and support work amount is large, not only unsupported back span is from can not meet requirement, and support time, much larger than the cut time, is also difficult to synchronize with cut.
In recent years, the progress of roofboltier is very fast, by both arms, four arms, develop in the recent period at the Shenhua eastern great Liu tower of the god saddle ride type eight arm jumbolter high speed driving systems that use of going into the well, this system is comprised of six kinds of equipment such as anchor driving machine, saddle ride type eight arm roofboltiers, self adaptation leather belt reshipment machine, crawler type self-movable foot end, step type self-movable foot end, two arm roofboltiers, and wherein saddle ride type eight arm roofboltiers are nucleus equipments wherein.Saddle ride type roofboltier and anchor driving machine and other coordinative composition of equipments operations, after job order place anchor driving machine, car load is equipped with 8 drill booms, be respectively Anchor Care drill boom after 4 front Anchor Care drill booms, 2,2 lateral wall Anchor Care drill booms, divide front and back 3 to arrange and put, car load straddles on self adaptation leather belt reshipment machine, props up protective function form complementation with two arm roofboltiers, even complete independently, to the whole supportings of back anchor pole, completes the supporting task to part lateral wall anchor pole simultaneously.This system only support apparatus configuration just has anchor driving machine, eight arm roofboltiers, three equipment of two arm roofboltiers, wound the first in the world.By above-mentioned introduction, being also not difficult to find out, there is following problem in this system:
1. condition of compatibility harshness.Wall rock condition will be got well, and unsupported back span is from the condition of compatibility of wanting to meet anchor driving machine.
2. system complex.Only supporting just has anchor driving machine, eight arm roofboltiers, three equipment of two arm roofboltiers.
3. there is certain problem in security reliability control.By anchor driving machine, eight arm roofboltiers, two arm roofboltiers, implement tunnel permanent support, it is larger that three equipment takies lane space in tandem, permanent support span is large, side country rock in top is difficult to be controlled in time, there is certain potential safety hazard, if play anchor cable, lapping, disturb each other larger.
Although 4. three support apparatus cooperatively interact, each root anchor pole is first by mobile rocking arm jewel hole more in place, installation, be difficult to realize the full section anchor pole in tunnel, anchor cable one step in place, install simultaneously.
Utility model content
The shortcoming existing for prior art, the utility model discloses a kind of tunnel (tunnel) anchor shaft anchor cable Quick installation equipment and method, apply this device and can realize the complete parallel installation of section between roadway bolt and anchor cable, anchor pole and anchor pole, anchor cable and anchor cable, can solve the roadway support problem of stagnant about tunnelling speed.
The technical solution adopted in the utility model is as follows:
This device is the self-contained unit with tunnelling reach, or assists installation means of locomotion to become one with temporary lining hydraulic support.
The feature of the method is according to anchor shaft anchor cable particular location in roadway support design, anchor pole, an anchor cable correspondence are laid a rig, all rigs are fixed on a movable frame, anchor of development machine driving is apart from this device of rear reach, can realize each root anchor pole of the full section in tunnel and anchor cable rig simultaneously in place, spud in simultaneously, anchor pole installation parallel with anchor cable.
With roadway support, only having the supporting of top side below, is example without the bolting and rope support of base plate anchoring, and specific implementation method is as follows:
(1) after reach laneway temporary support hydraulic support, corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, utilizes first group of rig to bore the fixing hole of first row roll bolt, anchor cable skyhook, anchor cable, falls joist jack;
(2) on the basis of step (1), reach laneway temporary support hydraulic support, and corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, and utilize first group of rig to bore the fixing hole of second row roll bolt, anchor cable skyhook, anchor cable, utilize second group of rig to install and anchor pole, the anchor cable of the first row side of second group of rig opposite position simultaneously; Fall joist jack;
(3) on the basis of step (2), reach laneway temporary support hydraulic support, and corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, and utilize first group of rig to bore the fixing hole of the 3rd row's roll bolt, anchor cable skyhook, anchor cable, utilize second group of rig install with anchor pole, the anchor cable of the second row side of second group of rig opposite position and install simultaneously; Utilize the 3rd group of rig installation and anchor pole, the anchor cable of the first row side of the 3rd group of rig opposite position also to install simultaneously; Fall joist jack;
(4) on the basis of step (3), reach laneway temporary support hydraulic support, corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, and utilize first group of rig to bore the fixing hole of the 4th row's roll bolt, anchor cable skyhook, anchor cable, utilize second group of rig install with anchor pole, the anchor cable of the 3rd row side of second group of rig opposite position and install simultaneously; Utilize the 3rd group of rig installation and anchor pole, the anchor cable of the second row side of the 3rd group of rig opposite position also to install simultaneously;
Utilize the 4th group of rig installation and anchor pole, the anchor cable of the first row side of the 4th group of rig opposite position also to install; Fall joist jack;
(5) after the anchor pole of completing steps (1)-step (4), anchor cable are installed, device enters normal condition, moves forward after laneway temporary support hydraulic support, and corresponding reach fixed frame is installed first row and the remaining anchor pole of other three rows, anchor cable simultaneously.
Whole device realized each root anchor pole and anchor cable can a step in place, spud in simultaneously, the complete parallel installation of section between roadway bolt and anchor cable, anchor pole and anchor pole, anchor cable and anchor cable.
This device comprises fixed frame, is fixed on the joist jack of fixed frame front end both sides, be fixed on anchor cable, jumbolter on cruciform bracing or column, be fixed on frame front end pulling and moving equipment, be positioned at frame mid portion for placing shelf, pin ladder and the pin hand platform of anchor pole and anchor pole rope accessory, and be installed on hydraulic pressure integrated console of framework one side etc.
The quantity of this device anchor pole, anchor cable rig on it equals the quantity of the anchor shaft anchor cable on a section in roadway support design; Anchor pole, the anchor cable rig permanent position on framework is that the best of each root anchor pole, anchor cable in roadway support is executed brill position; Rig on same row is to execute while boring there is no the anchor pole of phase mutual interference, the rigging up of anchor cable, has the anchor pole of phase mutual interference, the rigging up of anchor cable to be individually fixed on the difference row of framework; One end of anchor pole, anchor cable rig is fixed on framework in hinged mode, and the other end is fixed on the slide block that can slide on column or crossbeam.
Joist jack and the framework pulling and moving equipment of this device are hydraulically powered; Anchor cable, jumbolter are hydraulic pressure or wind drive; Hydraulic pressure integrated console is that hydraulic valve or hydraulic pilot valve are integrated.
The beneficial effects of the utility model are as follows:
The utility model compared with existing the most advanced technology, have condition of compatibility extensively, more simply, more reliably, the feature such as more efficient.
1. coordinate with the temporary lining of " crawler type " Combined hydraulic, can be supporting with various development machines, can adapt to the various wall rock conditions of development machine driving technique, can be to the country rock exposing with immediate support on time and space.
2. system is simple." crawler type " temporary lining with permanent support parallel operations high efficient driving Processes and apparatus facility system by " crawler type " temporary lining Combined hydraulic support and move set up execute with the integrated parallel mounting technique of the full section anchor shaft anchor cable in tunnel described in the utility model with device three parts form.Simple and compact for structure, automaticity is high, easy and simple to handle, quick, safe and reliable.
3. safe and reliable.Supporting " crawler type " temporary lining Combined hydraulic support can be according to the given setting load of characteristics of surrounding rock, both setting load restriction surrouding rock deformation that can be enough, also setting load that can be suitable and working resistance discharge surrouding rock stress, can control timely and effectively temporary lining district country rock, use the integrated parallel mounting technique of the full section anchor shaft anchor cable in tunnel described in the utility model and device, permanent support is less than a control top array pitch with the span that is connected between temporary lining, time is short, permanent support is implemented span and is being included top side Anchor cable-rod, in situation without bottom anchor, generally also only have four array pitch.
4. efficiently high-quality.This device moves forward with tunnelling, or become one with the auxiliary means of locomotion of installing of temporary lining hydraulic support, can realize the full section anchor pole in tunnel, anchor cable one step in place, install simultaneously, between anchor shaft anchor cable, the key element such as array pitch, setting angle is consistent with design, the operation simultaneously of permanent support and tunneling machine cutting, anchor pole and anchor cable operation simultaneously, anchor pole and anchor pole and anchor cable and all parallel operations of each root of the full section of anchor cable, quality normalization, standardization.
Accompanying drawing explanation
Fig. 1 device front view;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 2;
Fig. 4 is the C-C sectional view of Fig. 2;
Fig. 5 is the D-D sectional view of Fig. 2;
Fig. 6 is the E-E sectional view of Fig. 2.
The fundamental diagram of Fig. 7 device.
In figure: 1 fixed frame, 2 joist jack, 3 anchor poles, anchor cable rig, 4 working platformes, 5 shelf, 6 anchor cables, anchor pole, 7 boring heads, 8 first rows, 9 second rows, 10 the 3rd rows, 11 the 4th rows, 12 tunneling directions, the installation site of 13 anchor shaft anchor cables.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is elaborated:
This device is to be temporary lining district and permanent support district based on driving face being divided into development machine workspace; Temporary lining district Bian carries out temporary lining with returning technique after before " crawler type " Combined hydraulic support; Permanent support district is used this technology and device to carry out permanent support, realizes the operation simultaneously of permanent support and tunneling machine cutting, anchor pole and anchor cable operation simultaneously, anchor pole and anchor pole and anchor cable and all parallel operations of each root of the full section of anchor cable.It is according to the particular location of anchor shaft anchor cable in roadway support design, each root anchor pole, a rig of the corresponding laying of anchor cable, these rigs are fixed on a movable framework, this framework is along with tunnel moves forward, and in tunnel, remain that relative position is constant, make that each root anchor pole and anchor cable are can a step in place, construction simultaneously; For avoiding the mutual interference of facility on time and space in anchor shaft anchor cable and tunnel, the anchor pole, the anchor cable rig that have phase mutual interference are fixed on to the diverse location on framework; According to roadway surrounding rock characteristic and control thereof, require different definite tops and two to help the erection sequence of anchor pole, anchor cable.
Concrete structure is as shown in Fig. 1-Fig. 6, comprise fixed frame 1, be fixed on the joist jack 2 of fixed frame front end both sides, in fixed frame 1 both sides and front end, be provided with the anchor cable, the jumbolter 3 that are flexibly connected with it, at the front end of described fixed frame 1, be provided with framework pulling and moving equipment, at the middle part of fixed frame, be provided with the classification of anchor pole and anchor pole rope accessory and leave with shelf 5, pin ladder and pin hand working platform 4, in a side of fixed frame 1, hydraulic pressure integrated console is installed.
Described each anchor cable, an only corresponding anchor cable, anchor pole of jumbolter.
Described joist jack 2 is hydraulically powered; Described anchor cable, jumbolter, framework pulling and moving equipment are hydraulic pressure or pneumatic, and are assemblings and dismountable; Described hydraulic pressure integrated console is that hydraulic valve or hydraulic pilot valve are integrated.
Described hydraulic pressure integrated console adopts the method for welding to be fixed on framework one side.
As shown in Figure 7, as shown in Figure 7, detailed process is as follows in the installation site 13 of boring head 7 parallel installation device skyhooks, anchor cable:
(1) along tunneling direction 12, move forward after laneway temporary support hydraulic support, corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, utilizes first group of rig to bore the fixing hole of first row 8 roll bolts, anchor cable 6 skyhook, anchor cable, falls joist jack;
(2) on the basis of step (1), reach laneway temporary support hydraulic support, and corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, and utilize first group of rig to bore the fixing hole of second row 9 roll bolts, anchor cable 6 skyhook, anchor cable 6, utilize second group of rig to install and anchor pole, the anchor cable of the first row side of second group of rig opposite position simultaneously; Fall joist jack;
(3) on the basis of step (2), reach laneway temporary support hydraulic support, and corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, and utilize first group of rig to bore the fixing hole of the 3rd row's 10 roll bolts, anchor cable skyhook, anchor cable, utilize second group of rig install with anchor pole, the anchor cable of the second row side of second group of rig opposite position and install simultaneously; Utilize anchor pole, the anchor cable of the first row side of the 3rd group of rig installation and the 3rd group of rig opposite position simultaneously; Fall joist jack;
(4) on the basis of step (3), reach laneway temporary support hydraulic support, corresponding reach fixed frame, joist jack holds up anchor beam net and is close to top board, and utilize first group of rig to bore the fixing hole of the 4th row's 11 roll bolts, anchor cable skyhook, anchor cable, utilize second group of rig to install and anchor pole, the anchor cable of the 3rd row side of second group of rig opposite position simultaneously; Utilize anchor pole, the anchor cable of the second row side of the 3rd group of rig installation and the 3rd group of rig opposite position simultaneously; Utilize the 4th group of rig installation and anchor pole, the anchor cable of the first row side of the 4th group of rig opposite position also to install; Fall joist jack;
(5) after the anchor pole of completing steps (1)-step (4), anchor cable are installed, device enters normal condition, moves forward after laneway temporary support hydraulic support, and corresponding reach fixed frame is installed first row and the remaining anchor pole of other three rows, anchor cable simultaneously.

Claims (6)

1. the integrated parallel installation device of the full section anchor shaft anchor cable in tunnel, it is characterized in that: comprise fixed frame, be fixed on fixed frame front end both sides joist jack, be fixed on anchor cable-rod drill on cruciform bracing or column, be fixed on the pulling and moving equipment of frame front end, be positioned at frame mid portion for placing shelf, pin ladder and the pin hand platform of anchor pole and anchor pole rope accessory and being installed on the hydraulic pressure integrated console of framework one side.
2. the integrated parallel installation device of the full section anchor shaft anchor cable in tunnel as claimed in claim 1, is characterized in that: the quantity of anchor pole, anchor cable rig equals the quantity of the anchor shaft anchor cable on a section in roadway support design; Anchor pole, the anchor cable rig permanent position on framework is that in roadway support, executing of each root anchor pole, anchor cable bored position; Rig on same row is to execute while boring there is no the anchor pole of phase mutual interference, the rigging up of anchor cable, has the anchor pole of phase mutual interference, the rigging up of anchor cable to be individually fixed on the difference row of framework; One end of anchor pole, anchor cable rig is fixed on framework in hinged mode, and the other end is fixed on the slide block sliding on column or crossbeam.
3. the integrated parallel installation device of the full section anchor shaft anchor cable in tunnel as claimed in claim 1, is characterized in that: parallel installation device is the self-contained unit with tunnelling reach, or assists installation means of locomotion to become one with temporary lining hydraulic support.
4. the integrated parallel installation device of the full section anchor shaft anchor cable in tunnel as claimed in claim 1, is characterized in that: joist jack and framework pulling and moving equipment are hydraulically powered.
5. the integrated parallel installation device of the full section anchor shaft anchor cable in tunnel as claimed in claim 1, is characterized in that: anchor cable, jumbolter are hydraulic pressure or wind drive, and is assemble and can dismantle; In single work cycle, each anchor cable, each only a corresponding anchor pole, the anchor cable installed of jumbolter.
6. the integrated parallel installation device of the full section anchor shaft anchor cable in tunnel as claimed in claim 1, is characterized in that: hydraulic pressure integrated console is that hydraulic valve or hydraulic pilot valve are integrated.
CN201320760828.8U 2013-11-27 2013-11-27 Full-section roadway anchor rod and anchor cable integrated parallel mounting device Expired - Fee Related CN203584443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320760828.8U CN203584443U (en) 2013-11-27 2013-11-27 Full-section roadway anchor rod and anchor cable integrated parallel mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320760828.8U CN203584443U (en) 2013-11-27 2013-11-27 Full-section roadway anchor rod and anchor cable integrated parallel mounting device

Publications (1)

Publication Number Publication Date
CN203584443U true CN203584443U (en) 2014-05-07

Family

ID=50582379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320760828.8U Expired - Fee Related CN203584443U (en) 2013-11-27 2013-11-27 Full-section roadway anchor rod and anchor cable integrated parallel mounting device

Country Status (1)

Country Link
CN (1) CN203584443U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628903A (en) * 2013-11-27 2014-03-12 郑东风 Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628903A (en) * 2013-11-27 2014-03-12 郑东风 Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN103628903B (en) * 2013-11-27 2015-05-27 郑东风 Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device

Similar Documents

Publication Publication Date Title
CN101832102B (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN103485717A (en) Fully-hydraulic four-arm anchor rod/anchor cable drill carriage
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN106121537B (en) Without coal column gob side entry retaining Qie Dingcheng lanes construction method
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN103670425A (en) Excavating and supporting integrating method and carrying type lifting and transporting support manipulator for heading machine
CN103758522A (en) Temporary support method of tunneling working face and equipment thereof
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN206158574U (en) A portable drilling equipment for combining adopt working face and cross fault
CN113898390B (en) Mining automatic collaborative drilling and anchoring robot
CN111911154B (en) Gantry type tunneling anchor protection robot system
CN204200257U (en) A kind of colliery driving suspension device
CN117432430A (en) Method and equipment for tunneling drilled hard rock tunnel
CN203584443U (en) Full-section roadway anchor rod and anchor cable integrated parallel mounting device
CN201635656U (en) Side-propping anchor rod-anchor cable construction drill carriage with three movable arms
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN104912554B (en) Under-pressure self-moving excavation and support unit and under-pressure self-moving method
CN103016019A (en) Heading and anchoring integrated machine
CN111828073A (en) Novel roadway support device
CN204716236U (en) An a kind of automatic moving type pick unit with pressure
CN114776368A (en) System for adopt to fill and stay integration and combine and adopt waste filling working face

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140507

Termination date: 20161127