CN203553671U CN201320584871.3U CN201320584871U CN203553671U CN 203553671 U CN203553671 U CN 203553671U CN 201320584871 U CN201320584871 U CN 201320584871U CN 203553671 U CN203553671 U CN 203553671U
Authority
CN
China
Prior art keywords
half cylinder
splint
connecting plate
cylinder
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320584871.3U
Other languages
Chinese (zh)
Inventor
邹积鹏
孙建文
毕四明
孙燕霞
韩彦峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320584871.3U priority Critical patent/CN203553671U/en
Application granted granted Critical
Publication of CN203553671U publication Critical patent/CN203553671U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

本实用新型公开了一种绝缘操作杆辅助支架,活动夹由上半圆筒、下半圆筒和连接板组成,其中上半圆筒和下半圆筒扣接在一起,螺栓Ⅰ垂直穿过半圆筒和下半圆筒的左右两侧,连接板的上端固定在下半圆筒的底部,套筒体由套筒、左夹板和右夹板组成,其中左夹板和右夹板分别固定在套筒顶部的左右两侧,套筒侧壁上开有贯通的插孔,连接板的下端夹接在左夹板和右夹板之间,螺栓Ⅱ水平穿过左夹板、连接板和右夹板。本实用新型提高了工作效率和安全性能,大大降低了现场操作时可能导致的延时和误操作现象。

Figure 201320584871

The utility model discloses an auxiliary bracket for an insulating operating rod. The movable clip is composed of an upper half cylinder, a lower half cylinder and a connecting plate, wherein the upper half cylinder and the lower half cylinder are fastened together, and the bolt I vertically passes through the half cylinder and the lower half cylinder. On the left and right sides of the half cylinder, the upper end of the connecting plate is fixed on the bottom of the lower half cylinder. The sleeve body is composed of a sleeve, a left splint and a right splint, wherein the left splint and the right splint are respectively fixed on the left and right sides of the top of the sleeve. There is a through hole on the side wall of the barrel, the lower end of the connecting plate is clamped between the left splint and the right splint, and the bolt II passes through the left splint, the connecting plate and the right splint horizontally. The utility model improves the work efficiency and safety performance, and greatly reduces the possible time delay and misoperation during on-site operation.

Figure 201320584871

Description

绝缘操作杆辅助支架Insulated Operating Rod Auxiliary Bracket

技术领域 technical field

本实用新型涉及一种电操作杆的辅助支架设备。 The utility model relates to an auxiliary support device for an electric operating rod.

背景技术 Background technique

传统的绝缘操作杆由一根两节或三节的绝缘杆组成,这种操作杆在装设地线时,设备距地面距离较高,且接地线较重,在装设接地线时,高举非常吃力,挂接地线时对视线有一定影响,值班员很难在短时间内安装完接地线,且易出现操作杆的晃动,误碰带电设备,造成人员伤亡。 The traditional insulating operating rod is composed of a two-section or three-section insulating rod. When the ground wire is installed on this type of operating rod, the distance between the equipment and the ground is relatively high, and the ground wire is heavy. When the ground wire is installed, it is very It is laborious, and the line of sight is affected to a certain extent when the grounding wire is connected. It is difficult for the on-duty personnel to install the grounding wire in a short time, and it is easy to shake the operating lever, accidentally touch the live equipment, and cause casualties.

发明内容 Contents of the invention

为解决现有绝缘操作杆存在的上述问题,本实用新型提供了一种辅助支架,其所采取的技术方案为: In order to solve the above-mentioned problems existing in the existing insulating operating rod, the utility model provides an auxiliary bracket, and the technical solution adopted is:

包括活动夹以及与活动夹相固定的套筒体,活动夹由上半圆筒、下半圆筒和连接板组成,其中上半圆筒和下半圆筒扣接在一起,螺栓Ⅰ垂直穿过半圆筒和下半圆筒的左右两侧,并把它们固定在一起,连接板的上端固定在下半圆筒的底部,套筒体由套筒、左夹板和右夹板组成,其中左夹板和右夹板分别固定在套筒顶部的左右两侧,套筒侧壁上开有贯通的插孔,连接板的下端夹接在左夹板和右夹板之间,螺栓Ⅱ水平穿过左夹板、连接板和右夹板,并把它们固定在一起。 It includes the movable clamp and the sleeve body fixed with the movable clamp. The movable clamp is composed of an upper half cylinder, a lower half cylinder and a connecting plate, wherein the upper half cylinder and the lower half cylinder are buckled together, and the bolt I passes through the half cylinder and the lower half cylinder vertically. Fix the left and right sides of the lower half-cylinder, and fix them together. The upper end of the connecting plate is fixed on the bottom of the lower half-cylinder. The sleeve body is composed of a sleeve, a left splint and a right splint. On the left and right sides of the top of the barrel, there are through holes on the side wall of the sleeve. The lower end of the connecting plate is clamped between the left splint and the right splint. Bolt II passes through the left splint, connecting plate and right splint horizontally, and puts They are held together.

本实用新型的上端采用带有固定作用的夹子式结构,用于固定操作杆,通过下端的套筒连接到另一根操作杆上,从而可将两根操作杆连接到一起, 利用力学杠杆原理,调节辅助操作杆和主操作杆的链接点进行操作,有效缓解操作人员操作绝缘操作杆的吃力问题,同时保证操作杆不会晃动,提高操作安全系数,便于很好的悬挂接地线进行操作,大大降低了现场操作时可能导致的和延时和误操作。 The upper end of the utility model adopts a clip-type structure with a fixing function, which is used to fix the operating rod, and is connected to another operating rod through the sleeve at the lower end, so that the two operating rods can be connected together, using the principle of mechanical leverage , adjust the link point of the auxiliary operating lever and the main operating lever to operate, effectively alleviate the operator's difficulty in operating the insulating operating lever, and at the same time ensure that the operating lever will not shake, improve the operating safety factor, and facilitate the operation by hanging the grounding wire well. It greatly reduces the delay and misoperation that may be caused during on-site operation.

附图说明 Description of drawings

图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

具体实施方式 Detailed ways

下面结合附图对本实用新型做进一步说明。 Below in conjunction with accompanying drawing, the utility model is further described.

如图1所示,该支架包括活动夹以及与活动夹相固定的套筒体,活动夹由上半圆筒1、下半圆筒2和连接板3组成,其中上半圆筒1和下半圆筒2扣接在一起,螺栓Ⅰ4垂直穿过半圆筒1和下半圆筒2的左右两侧,并把它们固定在一起,连接板3的上端固定在下半圆筒2的底部。套筒体由套筒5、左夹板6和右夹板7组成,其中左夹板6和右夹板7分别固定在套筒5顶部的左右两侧,套筒5侧壁上开有贯通的插孔8,连接板3的下端夹接在左夹板6和右夹板7之间,螺栓Ⅱ9水平穿过左夹板6、连接板3和右夹板7,并把它们固定在一起。 As shown in Figure 1, the bracket includes a movable clamp and a sleeve body fixed with the movable clamp. The movable clamp is composed of an upper half cylinder 1, a lower half cylinder 2 and a connecting plate 3, wherein the upper half cylinder 1 and the lower half cylinder 2 Fastened together, the bolt I4 vertically passes through the left and right sides of the half cylinder 1 and the lower half cylinder 2, and fixes them together, and the upper end of the connecting plate 3 is fixed on the bottom of the lower half cylinder 2. The sleeve body is composed of a sleeve 5, a left splint 6 and a right splint 7, wherein the left splint 6 and the right splint 7 are respectively fixed on the left and right sides of the top of the sleeve 5, and the side wall of the sleeve 5 has a through hole 8 , The lower end of the connecting plate 3 is clamped between the left splint 6 and the right splint 7, and the bolt II9 passes through the left splint 6, the connecting plate 3 and the right splint 7 horizontally, and fixes them together.

使用时主操作杆套在上半圆筒1和下半圆筒2所形成的圆筒内,并通过调整螺栓Ⅰ4使它们紧固,辅助操作杆插在套筒5内,通过穿过插孔8的横向螺栓固定,通过松开螺栓Ⅱ9可调整连接板3和左夹板6之间的角度,然后紧固即可。 When in use, the main operating rod is set in the cylinder formed by the upper half cylinder 1 and the lower half cylinder 2, and they are tightened by adjusting the bolt I4. The horizontal bolts are fixed, and the angle between the connecting plate 3 and the left splint 6 can be adjusted by loosening the bolt II 9, and then tightened.

Claims (1)

1. an insulating bar auxiliary stand, comprise live splint and the sleeve body fixing with live splint, it is characterized in that: live splint is by first cylinder (1), second cylinder (2) and connecting plate (3) form, wherein first cylinder (1) and second cylinder (2) snap together, bolt I (4) is vertically passed the left and right sides of semicircular cylinder (1) and second cylinder (2), and they are fixed together, the upper end of connecting plate (3) is fixed on the bottom of second cylinder (2), sleeve body is by sleeve (5), left clamping plate (6) and right clamping plate (7) form, wherein left clamping plate (6) and right clamping plate (7) are separately fixed at the left and right sides at sleeve (5) top, on sleeve (5) sidewall, have the jack (8) of perforation, the lower end clamping connection of connecting plate (3) is between left clamping plate (6) and right clamping plate (7), bolt II (9) level is through left clamping plate (6), connecting plate (3) and right clamping plate (7), and they are fixed together.
CN201320584871.3U 2013-09-23 2013-09-23 Auxiliary support for insulation operating lever Expired - Fee Related CN203553671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320584871.3U CN203553671U (en) 2013-09-23 2013-09-23 Auxiliary support for insulation operating lever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320584871.3U CN203553671U (en) 2013-09-23 2013-09-23 Auxiliary support for insulation operating lever

Publications (1)

Publication Number Publication Date
CN203553671U true CN203553671U (en) 2014-04-16

Family

ID=50471740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320584871.3U Expired - Fee Related CN203553671U (en) 2013-09-23 2013-09-23 Auxiliary support for insulation operating lever

Country Status (1)

Country Link
CN (1) CN203553671U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104868399A (en) * 2015-06-11 2015-08-26 国网山西省电力公司临汾供电公司 Universal support of insulated operating bar
CN105823911A (en) * 2016-05-16 2016-08-03 贵州电网有限责任公司输电运行检修分公司 Auxiliary support of insulator zero-value detection rod and operational method for same
CN110480756A (en) * 2019-08-01 2019-11-22 韩秀良 A kind of self-balancing type construction site backplate processing unit (plant)
CN110829273A (en) * 2019-12-12 2020-02-21 国网山东省电力公司泰安供电公司 An insulating operating rod support device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104868399A (en) * 2015-06-11 2015-08-26 国网山西省电力公司临汾供电公司 Universal support of insulated operating bar
CN105823911A (en) * 2016-05-16 2016-08-03 贵州电网有限责任公司输电运行检修分公司 Auxiliary support of insulator zero-value detection rod and operational method for same
CN110480756A (en) * 2019-08-01 2019-11-22 韩秀良 A kind of self-balancing type construction site backplate processing unit (plant)
CN110480756B (en) * 2019-08-01 2021-05-07 江西华翔建筑有限责任公司 Self-balancing backplate processingequipment for construction scene
CN110829273A (en) * 2019-12-12 2020-02-21 国网山东省电力公司泰安供电公司 An insulating operating rod support device

Similar Documents

Publication Publication Date Title
CN203553671U (en) Auxiliary support for insulation operating lever
CN203932341U (en) High and low pressure busbar grounding device
CN103457214A (en) Ground potential operation non-bearing connection wire clamp
CN203277685U (en) A double spring hook type grounding clamp
CN205438325U (en) Clamping device for maintaining and mounting electrical equipment
CN204046062U (en) The unsettled fixed support instrument of a kind of power transmission line overhead ground wire
CN103441350A (en) Low-voltage grounding wire device for compact electrical structure
CN204835454U (en) Adjustable cable wire rack
CN203119413U (en) V-shaped string for prevention of wind deflection
CN205051016U (en) General earth bar with adjustable
CN204089047U (en) A kind of fixing-line device and pull bar combination tool
CN203814070U (en) Electrical cabinet
CN203265837U (en) Maintenance bracket for circuit board
CN205489263U (en) Insulated wire vaulting pole
CN204068049U (en) A kind of charged for replacement 220kV linear string bunch of insulator cross-arm jig
CN204333847U (en) Soft busbar fixing fittings
CN203644977U (en) New ground wire device
CN204741087U (en) A ground terminal fixing component of a ground wire
CN204858426U (en) Dismantled and assembled threading pole
CN204818766U (en) Boring clamping device of car pole class spare part
CN204243237U (en) An Auxiliary Tool for Hanging Ground Wires for 10kV Overhead Lines
CN203445270U (en) Ground wire clamp suitably used in switch cabinet
CN204598514U (en) A kind of regulator cubicle pin
CN203377548U (en) Ultrahigh ground wire hanging tool
CN204204662U (en) The apparatus for placing of switch operation handle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20140923