CN203546758U - Connection hole structure for permanent deformation joints of adjacent building basements - Google Patents

Connection hole structure for permanent deformation joints of adjacent building basements Download PDF

Info

Publication number
CN203546758U
CN203546758U CN201320572529.1U CN201320572529U CN203546758U CN 203546758 U CN203546758 U CN 203546758U CN 201320572529 U CN201320572529 U CN 201320572529U CN 203546758 U CN203546758 U CN 203546758U
Authority
CN
China
Prior art keywords
adjacent building
connected entrance
permanent deformation
steel bar
connection hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320572529.1U
Other languages
Chinese (zh)
Inventor
李莉
杨晓慧
项显洲
王怀志
张静
王学东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Beijing Architectural Design Institute of China Construction Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Beijing Architectural Design Institute of China Construction Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Beijing Architectural Design Institute of China Construction Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201320572529.1U priority Critical patent/CN203546758U/en
Application granted granted Critical
Publication of CN203546758U publication Critical patent/CN203546758U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a connection hole structure for permanent deformation joints of adjacent building basements. The structure comprises double concrete external walls at a connection. The middle of each external wall is provided with an opening. Cornices and reserved rebars are arranged around the openings. Water stops are embedded in the cornices. The connection hole structure for permanent deformation joints of adjacent building basements meets the needs for settlement difference, has no effect on building functions, and is convenient to construct.

Description

A kind of permanent deformation seam place connected entrance structure of adjacent building basement
Technical field
The utility model relates to basement connected entrance field between adjacent building, relates in particular to the connected entrance structure of underground external wall close together.
Background technology
when the number of plies of two adjacent building differs larger, because settling amount is different, be not suitable for the base plate of the two, top board to connect together, make large chassis form, due to Party A and building instructions for use, between two buildings, under ground portion must be communicated with simultaneously.This patent can meet structure stress requirement can meet building instructions for use again.
Summary of the invention
the purpose of this utility model is mainly to solve the connectivity problem that settling amount differs larger two adjacent building.
the utility model adopts following technical scheme:
a permanent deformation seam place connected entrance structure for adjacent building basement, comprises the two concrete exterior walls that are arranged on connectivity part, is provided with hole portion in exterior wall, in hole portion surrounding, is provided with and chooses along portion and reserved steel bar, is choosing along being embedded with waterstop in portion.
preferably, reserved steel bar comprises reserved U-shaped steel bar stress, distribution reinforcement.
preferably, the space except connected entrance between two exterior walls adopts coarse sand to tamp, to guarantee the firm of two described adjacent building.
preferably, choose along portion after main body settlement stability again by fluid concrete.
owing to having adopted technique scheme, the utlity model has following beneficial effect: both met settlement difference requirement, do not affected again building function and constructability.
Accompanying drawing explanation
fig. 1 is plan view of the present utility model;
fig. 2 is the A-A sectional view of Fig. 1.
wherein: exterior wall 1, hole portion 2, chooses along portion 3, waterstop 4, space 5.
The specific embodiment
according to embodiment, the utility model is described in further detail below.
a kind of permanent deformation seam place connected entrance structure of adjacent building basement has been shown in Fig. 1,2, this structure comprises the two concrete exterior walls 1 that are arranged on connectivity part, in exterior wall, be provided with hole portion 2, in hole portion 2 surroundings, be provided with and choose along portion 3 and reserved steel bar, choosing along being embedded with waterstop 4 in portion.Reserved steel bar comprises reserved U-shaped steel bar stress, distribution reinforcement.The space except connected entrance 5 between two exterior walls 1 adopts coarse sand or rubble concrete to tamp, to guarantee the firm of two described adjacent building.Choose along portion 3 after main body settlement stability again by fluid concrete.
take Zhongguancun Science & Technology Building as example.This engineering is built in 2000, and a side is four layers of pure ground frame structures under action, and opposite side is underground four layers, on the ground 22 layers of frame structure.The number of plies of both sides building is widely different, if sole plate connects together, certainly will cause differential settlement.
architectural discipline requires two underground connections of building, so two concrete exterior walls are set in connectivity part.On exterior wall, according to building requirements opening holes portion, in hole portion, surrounding is established 300(mm) thick choosing along portion and reserved U-shaped steel bar stress, distribution reinforcement and steel plate water stopper.Require to pour into a mould and choose the concrete along portion again after main body settlement stability simultaneously.For guaranteeing may consolidating of two buildings, except connected entrance, between two exterior walls, space adopts coarse sand to tamp.
obviously, above-described embodiment of the present utility model is only for the utility model example is clearly described, and is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, can also make on the basis of the above description other multi-form variation and changes.Here cannot give all embodiments exhaustive.Every still row in protection domain of the present utility model of apparent variation that the technical solution of the utility model amplifies out or change that belong to.

Claims (4)

1. the permanent deformation seam place connected entrance structure of an adjacent building basement, it is characterized in that, comprise the two concrete exterior walls that are arranged on connectivity part, in described exterior wall, be provided with hole portion, in described hole portion surrounding, be provided with and choose along portion and reserved steel bar, described, choose along being embedded with waterstop in portion.
2. connected entrance structure according to claim 1, is characterized in that, described reserved steel bar comprises reserved U-shaped steel bar stress, distribution reinforcement.
3. connected entrance structure according to claim 1 and 2, is characterized in that, the space except connected entrance between two described exterior walls adopts coarse sand to tamp, to guarantee the firm of two described adjacent building.
4. connected entrance structure according to claim 1 and 2, is characterized in that, described in choose along portion after main body settlement stability again by fluid concrete.
CN201320572529.1U 2013-09-16 2013-09-16 Connection hole structure for permanent deformation joints of adjacent building basements Expired - Fee Related CN203546758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320572529.1U CN203546758U (en) 2013-09-16 2013-09-16 Connection hole structure for permanent deformation joints of adjacent building basements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320572529.1U CN203546758U (en) 2013-09-16 2013-09-16 Connection hole structure for permanent deformation joints of adjacent building basements

Publications (1)

Publication Number Publication Date
CN203546758U true CN203546758U (en) 2014-04-16

Family

ID=50464894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320572529.1U Expired - Fee Related CN203546758U (en) 2013-09-16 2013-09-16 Connection hole structure for permanent deformation joints of adjacent building basements

Country Status (1)

Country Link
CN (1) CN203546758U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447792A (en) * 2017-08-07 2017-12-08 深圳市建筑设计研究总院有限公司 The waterproof connecting structure and its construction method of underground reserved passageway mouth

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447792A (en) * 2017-08-07 2017-12-08 深圳市建筑设计研究总院有限公司 The waterproof connecting structure and its construction method of underground reserved passageway mouth

Similar Documents

Publication Publication Date Title
CN205224363U (en) Connection structure of floor and girder steel
CN205444254U (en) Deformation joint structure
CN204645027U (en) Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN204590039U (en) A kind of bored occluded pile formula foundation pit supporting construction doubling as outer wall of basement
CN203546758U (en) Connection hole structure for permanent deformation joints of adjacent building basements
CN205617419U (en) Novel combination formula reinforced earth retaining wall structure
CN107288153A (en) A kind of prefabricated Gravity Retaining Wall
CN102127940B (en) Honeycomb structure wall body
CN203229957U (en) Variable-stiffness continuous diaphragm wall building envelope
CN204875690U (en) River levee brick and river levee protective wall
CN204551531U (en) A kind of module check well
CN205116221U (en) Piping lane prefab and assembled utility tunnel
CN105155856A (en) Construction method using prefabricated assembly type external retaining wall
CN209670134U (en) Assembled wall right angle connecting structure
CN103015291B (en) Oblique-angle two-way locking type sidewalk floor tile
CN206052773U (en) A kind of retaining wall block
CN206256536U (en) Build-in is in the build-in node of the Steel Frame Column of basement
CN203668926U (en) Foundation for tapered concrete piles
CN207063190U (en) A kind of fabricated structure waterproof construction
CN206512852U (en) A kind of multi-layer construction structure of use preformed material
CN207863276U (en) Improve the special shaped brick of brick setting shear behavior and the brick masonry structure using special shaped brick
CN207260394U (en) A kind of through ribbed prefabricated one-way slabs entirely
CN204983175U (en) Erect dress formula ALC board based on wall body
TW202022197A (en) Block that includes a body having one end protruded to form an end block and an opposite end recessed to form an end groove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20140916

EXPY Termination of patent right or utility model