A kind of thermal power plant auxiliary vapour heating boiler of adjacent machine starts system
Technical field
The utility model relates to boiler technology field, and particularly the auxiliary vapour heating boiler of a kind of adjacent machine for thermal power plant starts system.
Background technique
600MW unit will carry out cold conditions cleaning process about approximately 75 hours and the hot cleaning process of approximately 50 hours when starting for the first time.After unit puts into operation, if surpassed more than 150 hours with idle time after boiler long-time running, also need to clean hot clean time approximately 20 hours.
When carrying out hot cleaning, the boiler igniting oil firing that is about to begin.Conventional unit is provided with auxiliary steam header to steam line and a modulating valve bypass of oxygen-eliminating device, and the specification of this steam line is Φ 720*14, and the specification of modulating valve bypass is Φ 377*8.For heating or voltage stabilizing during unit starting.It is Φ 273*8.5 that steam between two units connects female pipe specification.
Oxygen-eliminating device is heated to be conventional design, and in cold conditions flushing process, oxygen-eliminating device water temperature general control, 80 ℃ of left and right, is subject to the restriction of oxygen-eliminating device heating efficiency simultaneously, and high energy is by the water temp. heating to 120 of oxygen-eliminating device ℃ left and right, and cold conditions flushing process approximately continues 3 hours.The work such as this stage can carry out that steam turbine is thrown shaft seal, vacuumized simultaneously, high-pressure cylinder falls warm, a little machine of red switch.
Boiler has and needs about 1.5 hours to ignition of the boiler after supercooled state flushing is qualified.
During ignition of the boiler, generally first light 4 startup oil guns and carry out radiator, switch an oil gun every 15 minutes, this boiler is totally 16 startup oil guns, and within 1 hour approximately consuming time, all oil guns switch complete.
And then increase by 3 startup oil guns, and totally 7 startups have rifle jointly to heat, and make the steam-water separator inlet temperature of boiler rise to 190 ℃, reach hot washing condition, and this temperature-rise period needs again about 2.5 hours consuming time.
Then carry out hot flushing.About 12 hours of this process need.
After hot flushing completes, continuation increases throwing and starts oil gun, generally keeps 12 startup oil guns to move simultaneously.Start First coal pulverizer and carry out increasing temperature and pressure, make it arrive steam turbine rolling parameter, this process approximately 2.5 hours consuming time.This stage high pressure cylinder pre-warming completes, and can not extend starting time.
But in actual use, find that the boiler startup system fuel consumption of this structure is larger, cost is higher, from economic angle, need to improve.
Model utility content
Goal of the invention of the present utility model is: for the problem of above-mentioned existence, provide a kind of thermal power plant auxiliary vapour heating boiler of adjacent machine to start system.
The technical solution adopted in the utility model is such: a kind of thermal power plant auxiliary vapour heating boiler of adjacent machine starts system, comprise two steam turbine auxiliary steam headers, two oxygen-eliminating devices, described two oxygen-eliminating devices are connected by steam pipework and a modulating valve station with a steam turbine auxiliary steam header respectively, between two steam turbine auxiliary steam headers, by auxiliary steam, connecting female pipe connects, the specification of the steam line between described oxygen-eliminating device and steam turbine auxiliary steam header is Φ 720*14, the specification of modulating valve bypass is Φ 530*13, it is Φ 377*9 that auxiliary steam between described two steam turbine auxiliary steam headers connects female pipe specification.
As preferably, the valve arranging on the steam line between described oxygen-eliminating device and steam turbine auxiliary steam header is electric valve, and the valve arranging in the modulating valve bypass between described oxygen-eliminating device and steam turbine auxiliary steam header is adjustable electric valve.
In sum, owing to having adopted technique scheme, the beneficial effects of the utility model are: after the specification that is connected female pipe through the steam line between oxygen-eliminating device and steam turbine auxiliary steam header and the auxiliary steam between two steam turbine auxiliary steam headers expands improvement, heating means are corresponding changing also, thereby can reduce oil consumption, reduce operating cost.
Accompanying drawing explanation
Fig. 1 is theory structure schematic diagram of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail.
Embodiment: as shown in Figure 1, a kind of thermal power plant auxiliary vapour heating boiler of adjacent machine starts system, comprise two steam turbine auxiliary steam headers, two oxygen-eliminating devices, described two oxygen-eliminating devices are connected by steam pipework and a modulating valve station with a steam turbine auxiliary steam header respectively, between two steam turbine auxiliary steam headers, by auxiliary steam, connecting female pipe connects, the specification of the steam line between described oxygen-eliminating device and steam turbine auxiliary steam header is Φ 720*14, the specification of modulating valve bypass is Φ 530*13, it is Φ 377*9 that auxiliary steam between described two steam turbine auxiliary steam headers connects female pipe specification.
The valve arranging on steam line between described oxygen-eliminating device and steam turbine auxiliary steam header is electric valve, and the valve arranging in the modulating valve bypass between described oxygen-eliminating device and steam turbine auxiliary steam header is adjustable electric valve.
Through the utility model so one improve after, the heating efficiency of oxygen-eliminating device is improved.
After boiler water filling, start cold conditions and rinse, it is suitable with conventional Starting mode that cold conditions is rinsed the required time, needs about 3 hours.
If carry out cold conditions flushing but still maintain 80 ℃ of left and right of oxygen-eliminating device water temperature, after completing, flushing also needs the steam-water separator inlet temperature of boiler to be warming up to 190 ℃ to meet hot washing condition, and this just needs the long period.Therefore in cold conditions rinse stage, oxygen-eliminating device temperature progressively can be improved, the mode of taking intensification limit, limit to rinse, can save the required time of hot flushing that meets that is warmed up to after cold conditions has been rinsed.
After cold conditions has been rinsed, oxygen-eliminating device increases gradually vapour amount to maximum heating ability oxygen-eliminating device is warming up to 190 ℃ of left and right.But the steam-water separator inlet water temperature of boiler heats up to reach and approaches hot washing condition and also need certain hour, and estimation is at least also more than 1 hour, and water cooled furnace wall water must heat up by outer row's mode.Taking into account system thermal loss, steam-water separator inlet temperature can not effectively reach 190 ℃, and hot washing time can be longer than hot washing time under conventional Starting mode, approximately 2.5 hours.
After hot flushing completes, boiler stops rinsing outer row, and oxygen-eliminating device steam consumption reduces, and maintains water temperature, and boiler should temporarily keep air-tight state.To 1.5 hours about used times of ignition of the boiler.During igniting, although boiler is the thermal environment in " hot stove, hot blast ", the heating surface such as superheater, reheater is still in cold conditions after all, and be subject to the restriction of intensification, step-up ratio and pulverizing system starting condition, after ignition of the boiler, still need to take to drop into oil gun increasing temperature and pressure, need 8 oil guns, within about 2.5 hours, reach the pulverizing system condition that starts, then increase and throw totally 12 the oil gun operations of 4 oil guns, start First pulverizing system, after 2 hours, reach red switch condition.
Conventional Starting mode is compared with the auxiliary vapour heating starting of adjacent machine of the present utility model mode, be take 600MW unit as example, time consumption and energy consumption result is as shown in the table:
From upper table, can know and find out, start and clean once, start-up cost saving ~ 600,000 yuan, economic benefit is obvious.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.