CN203530962U - Structure of reinforcement cage of bored pile - Google Patents

Structure of reinforcement cage of bored pile Download PDF

Info

Publication number
CN203530962U
CN203530962U CN201320587918.1U CN201320587918U CN203530962U CN 203530962 U CN203530962 U CN 203530962U CN 201320587918 U CN201320587918 U CN 201320587918U CN 203530962 U CN203530962 U CN 203530962U
Authority
CN
China
Prior art keywords
pile
grouting pipe
stake
grouting
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320587918.1U
Other languages
Chinese (zh)
Inventor
薛叶飞
李海涛
侯静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd Shanghai Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd Shanghai Branch filed Critical China State Construction Engineering Corp Ltd Shanghai Branch
Priority to CN201320587918.1U priority Critical patent/CN203530962U/en
Application granted granted Critical
Publication of CN203530962U publication Critical patent/CN203530962U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a structure of a reinforcement cage of a bored pile. Pile end grouting pipes which extend from the top of the reinforcement cage and outside the bottom end of the reinforcement cage are prefabricated on the side of the reinforcement cage, the bottom end of each pile end grouting pipe is provided with a pile end single-way grouting valve, pile side grouting pipes which extend from the top of the reinforcement cage to different elevation positions of the side face of the reinforcement cage are further fabricated on the side of the reinforcement cage, the bottom end of each pile side grouting pipe is connected with an annular pile side grouting device surrounding the reinforcement cage, and pile side one-way grouting valves facing the outside of the pile are distributed on the annular pile side grouting devices. According to the structure of the reinforcement cage of the bored pile, both pile end grouting and pile side grouting can be carried out, so that pile bottom sediment and pile side slurry cakes are eliminated, and the strength of pile bottom and pile side soil is enhanced; thus, bonding force of pile periphery soil is improved, the strength of the pile body is reinforced, the load-bearing capability of the bored pile is improved finally, and the settlement amount of the pile body is reduced.

Description

A kind of borehole filling pile cage of reinforcement structure
Technical field
The utility model belongs to building pile foundation technical field, relates in particular to a kind of borehole filling pile cage of reinforcement structure.
Background technology
The bored pile of single technique, due to the inherent shortcoming of pore-forming technique, easily causes the hidden danger such as pile bottom sediment and all mud films of stake.For this reason, there is afterwards human hair to understand the pile end grouting construction method of bored pile, when this construction method is pile at the bottom of stake preset grouting pipeline and grouting device, after pile body reaches some strength, by grouting pipeline, utilize high-pressure injection pump pressure injection to take the slurries that cement is host, sediment at the bottom of hole is cured, thereby eliminate traditional construction process of bored concrete pile inherent shortcoming, reach the bearing capacity, the minimizing settling amount that improve stake.But the reinforcement cage structure of this construction method application only can carry out slip casting at stake end, cannot eliminate a side mud film, the intensity of the stake side soil body cannot improve.
Utility model content
Technical problem to be solved in the utility model is to provide the borehole filling pile cage of reinforcement structure that can eliminate a side mud film, improve stake side soil strength, the deficiency existing to overcome prior art.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of borehole filling pile cage of reinforcement structure, in reinforcing cage side, be prefabricated with the pile end grouting pipe that extends beyond reinforcing cage bottom from top, the bottom of pile end grouting pipe is provided with stake end unidirectional grout valve, it is characterized in that: described reinforcing cage side is also prefabricated with the stake side Grouting Pipe that extends to different level position, reinforcing cage side from top, described stake side Grouting Pipe bottom is connected with the ring-like stake side slurry casting machine around reinforcing cage, is distributed with the stake side unidirectional grout valve of direction outside stake on described ring-like stake side slurry casting machine.
Described stake end unidirectional grout valve is for process four groups of spray-holes in pile end grouting pipe bottom, and every group at four spray-holes of same cross-sectional distribution, cross section spacing 100mm, and described spray-hole in advance pipe dresses outside shutoff.
In the utility model specific embodiment, pile end grouting pipe has two, is arranged symmetrically on reinforcing cage.
Described pile end grouting pipe and stake side Grouting Pipe are iron pipe; Described ring-like stake side slurry casting machine is ring-like high pressure resistant flexible pipe.
Adopt technique scheme, borehole filling pile cage of reinforcement structure of the present utility model not only can pile end grouting but also can the slip casting of stake side, pile bottom sediment and stake side mud skin are eliminated, at the bottom of making, the intensity of the stake side soil body is all improved, thereby improve the adhesion stress of stake week soil, make pile strength obtain reinforcement, finally improved the bearing capacity of bored pile and reduced the settling amount of pile body.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated:
Fig. 1 is that pile end grouting pipe and stake side Grouting Pipe are arranged schematic diagram at reinforcing cage in reinforcing cage short transverse;
Fig. 2 is for being pile end grouting pipe and stake side Grouting Pipe layout schematic diagram at circumferencial direction on reinforcing cage.
The specific embodiment
As depicted in figs. 1 and 2, borehole filling pile cage of reinforcement structure of the present utility model, reinforcing cage 100 sides are prefabricated with the pile end grouting pipe 200 that extends beyond reinforcing cage bottom from top, the end unidirectional grout valve that lays out pile is divided in the bottom of pile end grouting pipe 200, and the stake side Grouting Pipe 300 that extends to reinforcing cage 200 different level positions, side from top, stake side Grouting Pipe bottom is connected with the ring-like stake side slurry casting machine around reinforcing cage, is distributed with the stake side unidirectional grout valve of direction outside stake on ring-like stake side slurry casting machine.Pile end grouting pipe 200 exceeds position, A place in reinforcing cage 100 bottom 400mm(figure).
In the present embodiment, pile end grouting pipe 100 has two, is arranged symmetrically on reinforcing cage 100.Stake side Grouting Pipe 300 also has two, an extend to-30m absolute altitude position (position, B place in Fig. 1), another root extend to-21mm absolute altitude position (position, C place in Fig. 1).
Stake holds unidirectional grout valve for to process four groups of spray-holes in pile end grouting pipe bottom, every group of spray-hole at four diameter 8mm of same cross-sectional distribution, and cross section spacing 100mm, carries out pipe with film in advance to spray-hole and dresses outside, and blocks described spray-hole.Ring-like stake side slurry casting machine is ring-like high pressure resistant flexible pipe, is distributed with 3 stake side unidirectional grout valves on high-pressure hose.
Apply the borehole filling pile cage of reinforcement structure of the present utility model filling post construction of holing as follows:
Reinforcing cage is inserted after soil body boring, reinforcing cage is carried out to concreting; Build and pile end grouting pipe and a stake side Grouting Pipe were carried out respectively to clear water splitting in rear 7-8 hour pile end grouting pipe and a stake side Grouting Pipe are connected.
When hand-hole is interior under Grouting Pipe, should in Grouting Pipe, carry out water filling test, in pipe, pour into after water, upwards more than hoisting grouting pipe 5m, in pipe, 5 minutes kind left and right of water level do not decline, illustrate that its sealing performance can reach requirement, otherwise, should check in time joint sealing, what sealing performance was not met the demands does over again in time.To being exposed at the madjack pipe in aperture (position, D place in Fig. 1), must tighten with plug, prevent that foreign material and mud from falling in madjack pipe, guarantee that pipeline is unimpeded.During descending reinforcing cage, must slowly transfer, forbid brute force to be impacted.
The water yield of clear water splitting is unsuitable excessive, and pressure is controlled at 1.5-2MPa, and splitting stops water filling after connecting.
3-7 days after concreting, after concrete setting, utilizes mudjack first to stake side Grouting Pipe injected water mud, then carries out cement injection slurry to pile end grouting pipe.Grouting pressure is controlled at 1.5-1.8MPa, and flow rate of grouting is controlled at 30-40L/min, and cement paste is infiltrated in surrounding soil naturally, when the pump pressure value of mudjack reaches 2Mpa and holds lotus 3min, stops injected water mud.
Wherein, to stake side Grouting Pipe injected water mud, be first to the stake side Grouting Pipe injected water mud that extends to low absolute altitude position (30m absolute altitude position), then to the stake side Grouting Pipe injected water mud that extends to high standard high position (21m absolute altitude position).
The water/binder ratio of controlling cement paste is 0.55, and cement paste mixing time is no less than 2 minutes, and cement paste re-uses after must using the filter screen of 3mm * 3mm to filter.
Mud jacking is controlled and is adopted dual control standard: the grouting amount (cement consumption) of take is controlled as main, and it is auxiliary that grouting pressure is controlled.When reaching design grouting amount, mud jacking amount stops mud jacking; When reaching 2Mpa and hold lotus 3min, pump pressure value stops mud jacking.
By above-mentioned detailed introduction, can find out, borehole filling pile cage of reinforcement structure of the present utility model not only can pile end grouting but also can the slip casting of stake side, pile bottom sediment and stake side mud skin are eliminated, at the bottom of making, the intensity of the stake side soil body is all improved, thereby an adhesion stress that improves stake week soil, makes pile strength obtain reinforcement, finally improved the bearing capacity of bored pile and reduced the settling amount of pile body.
But; those skilled in the art will recognize that; the above-mentioned specific embodiment is exemplary; in order better to make those skilled in the art can understand this patent; can not be interpreted as it is the restriction to this patent protection domain; so long as according to spirit that this patent discloses do be anyly equal to change or modify, all fall into the scope of this patent protection.

Claims (4)

1. a borehole filling pile cage of reinforcement structure, in reinforcing cage side, be prefabricated with the pile end grouting pipe that extends beyond reinforcing cage bottom from top, the bottom of pile end grouting pipe is provided with stake end unidirectional grout valve, it is characterized in that: described reinforcing cage side is also prefabricated with the stake side Grouting Pipe that extends to different level position, reinforcing cage side from top, described stake side Grouting Pipe bottom is connected with the ring-like stake side slurry casting machine around reinforcing cage, is distributed with the stake side unidirectional grout valve of direction outside stake on described ring-like stake side slurry casting machine.
2. borehole filling pile cage of reinforcement structure according to claim 1, it is characterized in that: described stake end unidirectional grout valve is for processing four groups of spray-holes in pile end grouting pipe bottom, every group at four spray-holes of same cross-sectional distribution, cross section spacing 100mm, and described spray-hole in advance pipe dresses outside shutoff.
3. borehole filling pile cage of reinforcement structure according to claim 1, is characterized in that: pile end grouting pipe has two, is arranged symmetrically on reinforcing cage.
4. borehole filling pile cage of reinforcement structure according to claim 1, is characterized in that: described pile end grouting pipe and stake side Grouting Pipe are iron pipe; Described ring-like stake side slurry casting machine is ring-like high pressure resistant flexible pipe.
CN201320587918.1U 2013-09-23 2013-09-23 Structure of reinforcement cage of bored pile Expired - Fee Related CN203530962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320587918.1U CN203530962U (en) 2013-09-23 2013-09-23 Structure of reinforcement cage of bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320587918.1U CN203530962U (en) 2013-09-23 2013-09-23 Structure of reinforcement cage of bored pile

Publications (1)

Publication Number Publication Date
CN203530962U true CN203530962U (en) 2014-04-09

Family

ID=50417187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320587918.1U Expired - Fee Related CN203530962U (en) 2013-09-23 2013-09-23 Structure of reinforcement cage of bored pile

Country Status (1)

Country Link
CN (1) CN203530962U (en)

Similar Documents

Publication Publication Date Title
CN101333812B (en) Grouter for back side grouting and its construction method
CN103866762A (en) Pile body longitudinal multipoint grouting device
CN204662431U (en) A kind of filling pile ' s after grouting control valve with backstop structure
CN201554493U (en) Quick water-retaining wall in mine
CN102644284A (en) Method and device for post grouting in pile bottom
CN206396742U (en) A kind of prefabricated pile
CN103031835B (en) Method for increasing foundation bearing capacity
CN205205793U (en) Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously
CN106869154A (en) The flow control system and method for the dynamic water karst of closure high speed, big flow
CN104452746A (en) Construction method for bored pile
CN203977368U (en) Pressure-bearing reinforced concrete structure leakage repair device
CN204152530U (en) Water burst tunnel tunnel face seepproof screen
CN103469797B (en) A kind of PHC pile tube preparation joint grouting behind shaft or drift lining construction technology
CN104712145A (en) Grouting method for middle embedded grouting water stop belt
CN204311454U (en) A kind of pile end concrete placing device for foundation construction
CN203530962U (en) Structure of reinforcement cage of bored pile
CN204282360U (en) A kind of covering layer prestressed anchor fixing structure
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN208685596U (en) A kind of prefabricated pouring mortar pile
CN105332716A (en) Adaptive lining structure capable of bearing simultaneous actions of high internal and external water
CN204343286U (en) A kind of steel pipe pile support
CN202730792U (en) Uplift pressure regulating and controlling device for dam foundation
CN205100992U (en) Self -adaptation lining cutting structure for can bear high interior extra income does simultaneously
CN202577307U (en) Post grouting device of pile foundation
CN203668938U (en) Post grouting side wall grouting and guniting annular valve structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: SHANGHAI BRANCH OF CHINESE ARCHITECTURE CO., LTD.

Effective date: 20140403

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200434 YANGPU, SHANGHAI TO: 200120 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20140403

Address after: 200120 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

Address before: 200434 Shanghai city Yangpu District binlu No. 18 room 2201

Patentee before: Shanghai Branch, China State Construction Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20210923