CN203522182U - Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant - Google Patents

Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant Download PDF

Info

Publication number
CN203522182U
CN203522182U CN201320563757.2U CN201320563757U CN203522182U CN 203522182 U CN203522182 U CN 203522182U CN 201320563757 U CN201320563757 U CN 201320563757U CN 203522182 U CN203522182 U CN 203522182U
Authority
CN
China
Prior art keywords
bus
section
press
unit
medium voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320563757.2U
Other languages
Chinese (zh)
Inventor
彭哲
俞基安
刘晓鹏
郑相华
段宗周
王新宁
于杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUODIAN CONSTRUCTION INVESTMENT INNER MONGOLIA ENERGY Co Ltd
Hebei Electric Power Design and Research Institute
Original Assignee
GUODIAN CONSTRUCTION INVESTMENT INNER MONGOLIA ENERGY Co Ltd
Hebei Electric Power Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUODIAN CONSTRUCTION INVESTMENT INNER MONGOLIA ENERGY Co Ltd, Hebei Electric Power Design and Research Institute filed Critical GUODIAN CONSTRUCTION INVESTMENT INNER MONGOLIA ENERGY Co Ltd
Priority to CN201320563757.2U priority Critical patent/CN203522182U/en
Application granted granted Critical
Publication of CN203522182U publication Critical patent/CN203522182U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model relates to a medium voltage station service system in an auxiliary engine single-row configuration of two units in a thermal power plant. The medium voltage station service system includes a medium voltage bus and two unit loads. The medium bus includes a 1A-section medium voltage bus, a 1B-section medium voltage bus, a 2A-section medium voltage bus, a 2B-section medium voltage bus, a 12A shared-section medium voltage bus and a 12B shared-section medium voltage bus. One end of the 12A shared-section medium voltage bus is connected with a shared end of the 1B-section medium voltage bus while the other end of the 12A shared-section medium voltage bus is connected with one end of the 12B shared-section medium voltage bus. The other end of the 12B shared-section medium voltage bus is connected with a shared end of the 2B-section medium voltage bus. By applying the medium voltage station service system provided by the utility model, load balance of two low voltage split coils of a high voltage station transformer with split winding, so that power supply reliability of a main transformer and the medium voltage station service system and equipment operation safety and stability can be guaranteed further.

Description

Middle pressure station service electrical system in the unit of two, thermal power plant under the single-row configuration of subsidiary engine
Technical field
The utility model relates to thermal power generation station service electrical system field, particularly a kind of middle pressure station service electrical system being applied under the single-row configuration of thermal power plant subsidiary engine.
Background technology
Thermal power plant is the factory that the chemical energy of the fuel storage such as coal, oil, natural gas is changed into heat energy, changes heat energy into mechanical energy again, finally sends electric energy, and its production process is mainly that the electric power system and the electrical system that boiler, steam turbine, generator and accessory machinery, consist of realize.The subsidiary engine of boiler comprises primary air fan, forced draft fan, induced draft fan, coal pulverizer etc.; Steam turbine subsidiary engine comprises electrically driven feed pump, condensate pump, enclosed cooling water circulating pump etc.; In thermal power plant, also comprise the public subsidiary engines such as circulating water pump, air compressor machine, rainwater pump, rubber conveyer.Subsidiary engine presses station service that electric power is provided in thermal power plant.
In domestic large-scale conventional thermal power plant, boiler accessory machinery is mostly the operational mode that biserial configures at present.When thermal power plant subsidiary engine adopts biserial operational mode, the configuration concrete configuration of subsidiary engine is: when built two units the same period, the boiler accessory machinery of every unit (primary air fan, forced draft fan and induced draft fan), steam turbine subsidiary engine (electrically driven feed pump, condensate pump and enclosed cooling water circulating pump) and public subsidiary engine (as circulating water pump, air compressor machine, rainwater pump, rubber conveyer) all should arrange in pairs.The allocation plan of the middle pressure station service electrical system during configuration of subsidiary engine biserial needs relative set to be: every unit is established a main transformer, a main transformer carries in two sections presses bus, and paired boiler accessory machinery, steam turbine subsidiary engine and public subsidiary engine average mark are connected in two sections presses on bus.Adopt the operational mode of subsidiary engine biserial configuration, not only can meet the normal operation of boiler accessory machinery in thermal power plant, accomplished the setting of normal operation and standby operation equipment, also met the load balancing of two low pressure division volumes of high-voltage Auxiliary transformer with split winding simultaneously, but because every unit all needs both to have arranged normal operational outfit, stand-by equipment is set again, has therefore greatly increased the investment of power plant, reduced the cost performance of unit.
In recent years, along with the progressively raising of major pant item availability factor, large-size thermal power plant starts progressively to adopt the operational mode of the single-row configuration of boiler accessory machinery, and primary air fan, forced draft fan, induced draft fan carry out the single-row configuration of full capacity, can greatly save power plant's investment, improve the cost performance of unit.After primary air fan, forced draft fan, the single-row configuration of induced draft fan, from technological process, during unit operation, three single-row large blower fans need overall startup, indispensable.For improving power supply reliability; must be by single-row boiler accessory machinery centralized arrangement on the same middle pressure bus of unit; while pressing the device fails on bus like this in another; the standby steam turbine load of one fortune one could not affect unit and generate electricity at full capacity, and boiler can not cause compressor emergency shutdown by the form of load shedding yet.Yet middle pressure bus adopts this kind of sharing of load scheme, the load balancing that two the low pressure divisions of high-voltage Auxiliary transformer with split winding that are easy to realize while just having broken subsidiary engine biserial are originally rolled up, therefore also just cannot guarantee the power supply reliability of main transformer and middle pressure station service electrical system, and the safety and stability of apparatus body operation.
Utility model content
The utility model technical issues that need to address are to provide the middle pressure station service electrical system under the single-row configuration of a kind of heat power plant boiler, for the load balancing of two low pressure division volumes of high-voltage Auxiliary transformer with split winding is given security, further guarantee the power supply reliability of main transformer and middle pressure station service electrical system, and the safety and stability of apparatus body operation.
For solving the problems of the technologies described above, technical solution adopted in the utility model is:
Middle pressure station service electrical system in the unit of two, thermal power plant under the single-row configuration of subsidiary engine, comprise pressure bus and be arranged on two unit loads on middle pressure bus, every unit load comprises single-row boiler accessory machinery and the steam turbine subsidiary engine arranging in pairs, and the public load of two units comprises the public subsidiary engine of paired setting, described middle pressure bus comprises in the 1A section that is used to First unit load that electric power is provided presses in bus and 1B section and presses bus, be used to second unit load to provide to press in the 2A section of electric power in bus and 2B section, to press bus and be used to two unit public loads to provide in the 12A common section of electric power and press in bus and 12B common section and press bus, in described 12A common section, press one end of bus to be connected with pressing the public end of bus in 1B section, in 12A common section, press the other end of bus to be connected with pressing one end of bus in 12B common section, in 12B common section, press the other end of bus to be connected with pressing the public end of bus in 2B section,
The single-row boiler accessory machinery of described First unit is arranged in 1A section presses on bus, and the steam turbine subsidiary engine that First unit arranges is in pairs separately positioned in 1A section presses in bus and 1B section and press on bus; The single-row boiler accessory machinery of second unit is arranged in 2A section presses on bus, and second paired steam turbine subsidiary engine arranging of unit is separately positioned in 2A section and presses in bus and 2B section and press on bus; The public load of two units is separately positioned in 12A common section and presses in bus and 12B common section and press on bus.
Improvement of the present utility model is: in described 1A section, press to press in bus, 1B section and in bus, 2A section, press bus also by circuit breaker, to be connected same respectively with the end of incoming cables of pressing bus in 2B section to open standby change.
Owing to having adopted technique scheme, the technological progress that the utility model is obtained is:
The utility model is applied in thermal power plant to be built in two units in the middle pressure station service electrical system under the single-row configuration of boiler accessory machinery the same period, by arranging, in common section, press bus, be convenient to public load to manage concentratedly, both strengthened unit unit, make whole station service electrical system can not affect because of the fault of a unit the normal operation of other units, the load balancing that has kept again two low pressure division volumes of high-voltage Auxiliary transformer with split winding, further guarantee the power supply reliability of main transformer and middle pressure station service electrical system, and the safety and stability of apparatus body operation.
Accompanying drawing explanation
Fig. 1: winding diagram of the present utility model.
Embodiment
Below in conjunction with the drawings and the specific embodiments, the utility model is done further to describe in detail:
A middle pressure station service electrical system in the unit of two, thermal power plant under the single-row configuration of subsidiary engine, its winding diagram as shown in Figure 1.Middle pressure station service electrical system comprises middle pressure bus and is arranged on two unit loads on middle pressure bus.Every unit load comprises single-row boiler accessory machinery and the steam turbine subsidiary engine arranging in pairs, and the public load of two units comprises the public subsidiary engine of paired setting.
Middle pressure bus comprises in 1A section presses in bus, 1B section and presses in bus, 2A section and press in bus, 2B section and press in bus, 12A common section and press in bus and 12B common section and press bus.
Wherein: in 1A section, press in bus and 1B section and press bus to be used to First unit load that electric power is provided.In 1A section, press and in bus, 1B section, press the end of incoming cables of bus to be connected on two low pressure division volumes of No. 1 high factory change, in 1A section, press the leading-out terminal of bus to connect respectively the single-row boiler accessory machinery of First unit and one group of steam turbine subsidiary engine of First unit, in 1B section, press another group steam turbine subsidiary engine of the leading-out terminal connection First unit of bus, in 1A section, press in bus and 1B section and press two groups of steam turbine subsidiary engines on bus standby each other.
In 2A section, pressing in bus and 2B section presses bus to be used to second unit load that electric power is provided.In 2A section, press and in bus and 2B section, press the end of incoming cables of bus to be connected on two low pressure division volumes of No. 2 high factories change, in 2A section, press the leading-out terminal of bus to connect respectively the single-row boiler accessory machinery of second unit and one group of steam turbine subsidiary engine of second unit, in 2B section, press another group steam turbine subsidiary engine of second unit of leading-out terminal connection of bus, in 2A section, press in bus and 2B section and press two groups of steam turbine subsidiary engines on bus standby each other.
In 12A common section, pressing in bus and 12B common section presses bus to be used to two unit public loads that electric power is provided.In 12A common section, press one end of bus to be connected with pressing the public end of bus in 1B section, in 12A common section, press the other end of bus to be connected with pressing one end of bus in 12B common section, in 12B common section, press the other end of bus to be connected with pressing the public end of bus in 2B section.In 12A common section, press bus and the leading-out terminal of pressing bus in 12B common section to be connected respectively two groups of public subsidiary engines of two unit public loads.
In the present embodiment, in 1A section, press to press in bus, 1B section and in bus, 2A section, press bus also by circuit breaker, to be connected same respectively with the end of incoming cables of pressing bus in 2B section to open standby change, as No. 1 high factory, become and/or during No. 2 high factory accidents barriers, for power load provides electric power.
The utility model is applied in certain the first phase 2 * 660MW of Bu Lian power plant of Co., Ltd unit, presses the load calculating of bus as shown in table 1 in each, presses the load of bus to calculate as shown in table 2 in two common sections.
Table 1
Figure BDA0000380632220000041
Figure BDA0000380632220000051
Table 2
Figure BDA0000380632220000052
Figure BDA0000380632220000061
By table 1 and table 2, can be found out, in whole middle pressure station service electrical system, in common section, press bus to play vital effect, be embodied in following some:
1) unit keeps
In common section, press the setting of bus to be convenient to public load to manage concentratedly; the unit of strengthening unit; can be because of the normal operation of other unit of unit station service electrical system fault effects, to coordinating unit maintenance, shutdown and overhauling under this unit auxiliary switchgear etc. all more for convenience.
2) load balancing
In common section, press bus to play key effect to the load balancing after keeping subsidiary engine single-row.According to the connection type of example engineering, three single-row large blower fan unifications are connected to middle pressure bus A section, and common section is connected to middle pressure bus B section, and according to the whole computational methods of moving of all loads of not considering to connect this section of bus, the working capacity of getting every section of public bus is multiplied by 0.85 coefficient and counts in the middle of population size, as shown in table 1,2, substantially accomplished the load balancing of two low pressure division volumes of high-voltage Auxiliary transformer with split winding.
3) area reduces
Owing to pressing be arranged dividing of bus section, busbar section and public middle pressure bus section, busbar section in each unit, and according to common section load display case, can the public power distribution station of middle pressure be set separately outward at unit 0m or main power house, 30m2 left and right (adding up to according to two units) is reduced in the distribution board position that makes to be arranged in the pressure station-service work switchgear house in steam turbine building intermediate layer, floor space reduces greatly, makes division of room more reasonable.

Claims (2)

1. the middle pressure station service electrical system under the single-row configuration of subsidiary engine in the unit of two, thermal power plant, comprise pressure bus and be arranged on two unit loads on middle pressure bus, every unit load comprises single-row boiler accessory machinery and the steam turbine subsidiary engine arranging in pairs, and the public load of two units comprises the public subsidiary engine of paired setting, it is characterized in that: described middle pressure bus comprises in the 1A section that is used to First unit load that electric power is provided presses in bus and 1B section and press bus, be used to second unit load to provide to press in the 2A section of electric power in bus and 2B section, to press bus and be used to two unit public loads to provide in the 12A common section of electric power and press in bus and 12B common section and press bus, in described 12A common section, press one end of bus to be connected with pressing the public end of bus in 1B section, in 12A common section, press the other end of bus to be connected with pressing one end of bus in 12B common section, in 12B common section, press the other end of bus to be connected with pressing the public end of bus in 2B section,
The single-row boiler accessory machinery of described First unit is arranged in 1A section presses on bus, and the steam turbine subsidiary engine that First unit arranges is in pairs separately positioned in 1A section presses in bus and 1B section and press on bus; The single-row boiler accessory machinery of second unit is arranged in 2A section presses on bus, and second paired steam turbine subsidiary engine arranging of unit is separately positioned in 2A section and presses in bus and 2B section and press on bus; The public load of two units is separately positioned in 12A common section and presses in bus and 12B common section and press on bus.
2. the middle pressure station service electrical system under the single-row configuration of subsidiary engine in the unit of two, thermal power plant according to claim 1, is characterized in that: in described 1A section, press to press in bus, 1B section and in bus, 2A section, press bus also by circuit breaker, to be connected same respectively with the end of incoming cables of pressing bus in 2B section to open standby change.
CN201320563757.2U 2013-09-11 2013-09-11 Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant Expired - Fee Related CN203522182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320563757.2U CN203522182U (en) 2013-09-11 2013-09-11 Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320563757.2U CN203522182U (en) 2013-09-11 2013-09-11 Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant

Publications (1)

Publication Number Publication Date
CN203522182U true CN203522182U (en) 2014-04-02

Family

ID=50381057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320563757.2U Expired - Fee Related CN203522182U (en) 2013-09-11 2013-09-11 Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant

Country Status (1)

Country Link
CN (1) CN203522182U (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105762804A (en) * 2016-05-06 2016-07-13 中国能源建设集团湖南省电力设计院有限公司 Direct drop 10-kV power supply wiring structure for 110-kV high-capacity transformer with split windings
CN105762805A (en) * 2016-05-06 2016-07-13 中国能源建设集团湖南省电力设计院有限公司 Direct drop 10-kV power supply wiring structure for 220-kV high-capacity transformer with split windings
CN106208153A (en) * 2016-07-27 2016-12-07 西安西热节能技术有限公司 A kind of power plant subsidiary engine tracking power source system
CN108418215A (en) * 2018-04-13 2018-08-17 国电建投内蒙古能源有限公司 Auxiliary single-line diagram method
CN108418217A (en) * 2018-04-16 2018-08-17 国电建投内蒙古能源有限公司 The configuration method of station service electrical system
CN108418216A (en) * 2018-04-16 2018-08-17 国电建投内蒙古能源有限公司 Station service load distribution method
CN108494086A (en) * 2018-04-18 2018-09-04 国电建投内蒙古能源有限公司 Service power voltage hierarchical selection method, equipment and medium
CN108536110A (en) * 2018-06-30 2018-09-14 神华国华广投(柳州)发电有限责任公司 A kind of single-row unit of subsidiary engine from start-stop control system
CN108832641A (en) * 2018-06-06 2018-11-16 三峡大学 A kind of intelligent sub-controlling unit and control method of service power
CN108879703A (en) * 2018-07-24 2018-11-23 成都市兴蓉再生能源有限公司 A kind of house transformer operation method
CN108964112A (en) * 2017-05-19 2018-12-07 中国电力工程顾问集团华东电力设计院有限公司 The wiring construction and its operation method of small steam turbine generator access high-voltage Auxiliary electric system
CN109066960A (en) * 2018-08-22 2018-12-21 江苏核电有限公司 A kind of nuclear power unit standby power supply device and its control method
CN110071508A (en) * 2018-04-11 2019-07-30 国电建投内蒙古能源有限公司 Middle pressure station service electrical system
CN110071509A (en) * 2018-04-13 2019-07-30 国电建投内蒙古能源有限公司 Middle pressure auxiliary single-line diagram circuit
CN110601235A (en) * 2019-10-15 2019-12-20 西安热工研究院有限公司 Super capacitor auxiliary frequency modulation system suitable for multiple units of thermal power plant
CN114156918A (en) * 2021-11-25 2022-03-08 中盐华能储能科技有限公司 Transformer of salt cavern compressed air energy storage power station and low-voltage station service configuration method
CN114825483A (en) * 2022-06-29 2022-07-29 西安热工研究院有限公司 Thermal power generating unit frequency modulation system, method and device

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105762804A (en) * 2016-05-06 2016-07-13 中国能源建设集团湖南省电力设计院有限公司 Direct drop 10-kV power supply wiring structure for 110-kV high-capacity transformer with split windings
CN105762805A (en) * 2016-05-06 2016-07-13 中国能源建设集团湖南省电力设计院有限公司 Direct drop 10-kV power supply wiring structure for 220-kV high-capacity transformer with split windings
CN106208153A (en) * 2016-07-27 2016-12-07 西安西热节能技术有限公司 A kind of power plant subsidiary engine tracking power source system
CN106208153B (en) * 2016-07-27 2018-09-18 西安西热节能技术有限公司 A kind of power generation station-service subsidiary engine system tune power source system
CN108964112A (en) * 2017-05-19 2018-12-07 中国电力工程顾问集团华东电力设计院有限公司 The wiring construction and its operation method of small steam turbine generator access high-voltage Auxiliary electric system
CN110071508A (en) * 2018-04-11 2019-07-30 国电建投内蒙古能源有限公司 Middle pressure station service electrical system
CN108418215A (en) * 2018-04-13 2018-08-17 国电建投内蒙古能源有限公司 Auxiliary single-line diagram method
CN110071509A (en) * 2018-04-13 2019-07-30 国电建投内蒙古能源有限公司 Middle pressure auxiliary single-line diagram circuit
CN108418217A (en) * 2018-04-16 2018-08-17 国电建投内蒙古能源有限公司 The configuration method of station service electrical system
CN108418216A (en) * 2018-04-16 2018-08-17 国电建投内蒙古能源有限公司 Station service load distribution method
CN108494086A (en) * 2018-04-18 2018-09-04 国电建投内蒙古能源有限公司 Service power voltage hierarchical selection method, equipment and medium
CN108832641A (en) * 2018-06-06 2018-11-16 三峡大学 A kind of intelligent sub-controlling unit and control method of service power
CN108832641B (en) * 2018-06-06 2021-05-14 三峡大学 Intelligent auxiliary control device and control method for station service power supply
CN108536110B (en) * 2018-06-30 2024-02-20 国能广投柳州发电有限公司 Automatic start-stop control system of auxiliary unit single-row unit
CN108536110A (en) * 2018-06-30 2018-09-14 神华国华广投(柳州)发电有限责任公司 A kind of single-row unit of subsidiary engine from start-stop control system
CN108879703A (en) * 2018-07-24 2018-11-23 成都市兴蓉再生能源有限公司 A kind of house transformer operation method
CN109066960A (en) * 2018-08-22 2018-12-21 江苏核电有限公司 A kind of nuclear power unit standby power supply device and its control method
CN110601235A (en) * 2019-10-15 2019-12-20 西安热工研究院有限公司 Super capacitor auxiliary frequency modulation system suitable for multiple units of thermal power plant
CN114156918A (en) * 2021-11-25 2022-03-08 中盐华能储能科技有限公司 Transformer of salt cavern compressed air energy storage power station and low-voltage station service configuration method
CN114825483A (en) * 2022-06-29 2022-07-29 西安热工研究院有限公司 Thermal power generating unit frequency modulation system, method and device

Similar Documents

Publication Publication Date Title
CN203522182U (en) Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant
Marvik et al. Electrification of offshore petroleum installations with offshore wind integration
CN104466987B (en) Novel intelligent dynamic hybrid reactive power compensation device
CN102957105A (en) Novel intelligent substation on basis of application of clean energy
CN204349309U (en) Photovoltaic inversion boosting integrated box type transformer station
CN203352172U (en) Auxiliary power wiring structure for large thermal power plant
CN104078970B (en) The network-building method of dual power supply commutation system DC side networking operation
CN202178507U (en) Connecting structure of service-power main lead of power station
CN108418217A (en) The configuration method of station service electrical system
CN205986141U (en) Power supply circuit of air conditioning unit
CN208971145U (en) Middle pressure auxiliary single-line diagram circuit
CN204347168U (en) A kind of 10KV power supply grid analogue means
CN205071588U (en) Quick nimble energy -saving data center device
CN208986677U (en) A kind of high pressure online UPS device
CN204349456U (en) A kind of novel intelligent dynamically blendes together reactive power compensator
CN103580060B (en) A kind ofly be applicable to the controller of combining inverter and the method for supplying power to of electrical secondary system
CN203481825U (en) Optimized natural gas distribution-type energy main wiring circuit
CN209786794U (en) improved power plant power utilization system
CN209642325U (en) DC power-supply system
CN203491718U (en) Multi-voltage source multi-microgrid system framework
CN201601529U (en) Power supply system for electric power communication computer room
CN201868747U (en) General power distribution cabinet with automatic reactive power compensation
CN205945072U (en) Intelligence reactive power compensation device
CN204391746U (en) A kind of electric block electric power-feeding structure
CN204794107U (en) Compound on -off control of single group is apotype intelligence condenser altogether

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402