CN108832641A - A kind of intelligent sub-controlling unit and control method of service power - Google Patents
A kind of intelligent sub-controlling unit and control method of service power Download PDFInfo
- Publication number
- CN108832641A CN108832641A CN201810575188.0A CN201810575188A CN108832641A CN 108832641 A CN108832641 A CN 108832641A CN 201810575188 A CN201810575188 A CN 201810575188A CN 108832641 A CN108832641 A CN 108832641A
- Authority
- CN
- China
- Prior art keywords
- module
- motor
- bus
- subsidiary engine
- decision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/26—Arrangements for eliminating or reducing asymmetry in polyphase networks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/50—Arrangements for eliminating or reducing asymmetry in polyphase networks
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Combined Controls Of Internal Combustion Engines (AREA)
- Control Of Vehicle Engines Or Engines For Specific Uses (AREA)
- Control Of Multiple Motors (AREA)
Abstract
Description
技术领域technical field
本发明属于电动机控制技术领域,具体涉及一种厂用电源的智能辅助控制装置。The invention belongs to the technical field of motor control, and in particular relates to an intelligent auxiliary control device for a plant power supply.
背景技术Background technique
厂用电系统给厂用负荷供电,如图2,它包含高压厂用电和低压厂用电,低压厂用电的电源经由厂低变连接至高压厂母线,高压厂用母线的电源来自厂高变。厂用负荷以辅助电动机(以下简称“辅机电机”)为主,低压辅机接入低压厂用电,高压辅机接入高压厂用电。为了确保机组运行的安全性,同一系统的互为备用的辅机电机通常接入不同的母线,并设置独立的辅控装置,在这些辅控装置的控制下,这些电机轮流启停、交替工作。The plant power system supplies power to plant loads, as shown in Figure 2. It includes high-voltage plant power and low-voltage plant power. The power supply of low-voltage plant power is connected to the high-voltage plant busbar through the plant-low transformer. high change. The plant load is dominated by auxiliary motors (hereinafter referred to as "auxiliary motors"), the low-voltage auxiliary machines are connected to the low-voltage plant power, and the high-voltage auxiliary machines are connected to the high-voltage plant power. In order to ensure the safety of the unit operation, the mutually standby auxiliary motors of the same system are usually connected to different buses, and independent auxiliary control devices are set up. Under the control of these auxiliary control devices, these motors start and stop in turn and work alternately. .
发明内容Contents of the invention
本发明的目的是要解决现有厂用电系统中,由于没有考虑各系统在电源方面的关联,当经历长时间运行后,会出现电动机由某几段母线集中供电的情况,造成厂用电母线的负荷分配严重不平衡,此时若电机从负荷较重的母线上自动启动,会对厂用电造成严重冲击,危及厂用电的供电安全,甚至可能导致机组发生事故的技术问题。The purpose of the present invention is to solve the problem that in the existing factory power system, because the relationship between the power sources of each system is not considered, after a long time of operation, the motor will be powered by some busbars in a centralized way, causing the factory power failure. The load distribution of the bus is seriously unbalanced. At this time, if the motor starts automatically from the bus with a heavy load, it will have a serious impact on the plant power supply, endanger the power supply safety of the plant power, and may even cause technical problems in the unit accident.
发明的目的是这样实现的:The purpose of invention is achieved like this:
一种厂用电源的智能辅助控制装置,它包括厂用电全景拓扑模块、厂用电运行状态分析模块、电机运行状态分析模块以及决策模块,厂用电全景拓扑模块的输出端分别与厂用电运行状态分析模块、电机运行状态分析模块以及决策模块的输入端连接,厂用电运行状态分析模块以及电机运行状态分析模块的输出端均与决策模块的输入端连接,厂用电运行状态分析模块的输出端与电机运行状态分析模块的输入端连接。An intelligent auxiliary control device for factory power supply, which includes a factory power panoramic topology module, a factory power running state analysis module, a motor running state analysis module, and a decision-making module. The output terminals of the factory power panoramic topology module are connected to the factory power The power operation state analysis module, the motor operation state analysis module and the input terminals of the decision-making module are connected, the output terminals of the plant power operation state analysis module and the motor operation state analysis module are connected to the input end of the decision The output end of the module is connected with the input end of the motor running state analysis module.
上述厂用电全景拓扑模块包括电机数据统计模块、全景拓扑结构以及母线负荷计算模块。The above-mentioned panoramic topology module of factory electricity includes a motor data statistics module, a panoramic topology structure and a bus load calculation module.
上述厂用电运行状态分析模块包括母线安全裕度判定模块、形成待停辅机表模块,厂用电运行状态分析模块计算母线负荷、评估母线的安全裕度,确定需要调整的母线,并对调整的效果进行评估。The analysis module of the above-mentioned plant power operation status includes a busbar safety margin judgment module and a module for forming a list of auxiliary machines to be stopped. Evaluate the effects of adjustments.
上述电机运行状态分析模块包括电机安全裕度判定模块、形成待开辅机表,电机运行状态分析模块保存了辅助电机的分类信息表与状态评估模型,对辅助电机的工作状态进行评估,确定调整哪些辅机电机,电机运行状态分析模块从厂用电运行状态分析模块接收到待停的辅机电机信息,将待停和待开电机信息传至决策模块。The above-mentioned motor running state analysis module includes a motor safety margin judgment module and forms a list of auxiliary machines to be opened. The motor running state analysis module saves the classification information table and state evaluation model of the auxiliary motor, evaluates the working state of the auxiliary motor, and determines the adjustment Which auxiliary motors, the motor running state analysis module receives the information of the auxiliary motors to be stopped from the plant power running state analysis module, and transmits the information of the motors to be stopped and to be started to the decision module.
上述决策模块包括模拟启停模块以及形成启停方案模块,模拟电机的投、退,评估投退后母线的安全裕度,确定电机的投、退方案。The above-mentioned decision-making module includes a simulation start-stop module and a start-stop scheme module, which simulates the switching on and off of the motor, evaluates the safety margin of the bus after switching on and off, and determines the switching on and off scheme of the motor.
在使用时,采用以下步骤:When using it, take the following steps:
1)当厂用电的运行方式变化后,首先由厂用电全景拓扑模块统计辅机电机的数据、对厂用电全景拓扑进行分析,将分析结果传递至厂用电运行状态分析模块、电机运行状态分析模块以及决策模块,同时将母线信息发送至厂用电运行状态分析模块、电机信息传给电机运行状态分析模块;1) When the operation mode of plant power changes, first, the plant power panoramic topology module counts the data of auxiliary motors, analyzes the plant power panoramic topology, and transmits the analysis results to the plant power operation status analysis module, motor The running status analysis module and the decision-making module simultaneously send the busbar information to the plant power running status analysis module, and the motor information to the motor running status analysis module;
2)厂用电运行状态分析模块对母线的安全裕度进行评估,如需调整,确定待调整的电机,并将信息传至电机运行状态分析模块,同时将母线数据传至决策模块;2) The analysis module of plant power operation status evaluates the safety margin of the busbar. If adjustment is required, the motor to be adjusted is determined, and the information is transmitted to the motor operation status analysis module, and the busbar data is transmitted to the decision-making module;
3)电机运行状态分析模块按待停电机确定待开电机,形成待调整辅机的次序表,并传至决策模块;3) The motor running state analysis module determines the motor to be turned on according to the motor to be stopped, forms a sequence table of auxiliary machines to be adjusted, and transmits it to the decision-making module;
4)在决策模块中,决策模块模拟停机和开机的过程,并评估启停完成后,母线的安全裕度,确定最终的调整方案。4) In the decision-making module, the decision-making module simulates the process of stopping and starting, and evaluates the safety margin of the bus after the start-stop is completed, and determines the final adjustment plan.
在步骤1)中,当厂用电的运行方式变化考虑4种方式:母线联络开关合闸,母线进线开关合闸。厂用电全景拓扑分析统计的辅机电机数据包括:当前辅机电机的连续运行时间、总的运行时间和总的启、停次数;按照厂高变——厂用高压母线——高压辅机—厂低变——低压辅机的分析结构,形成全景拓扑的连通关系表。In step 1), four modes are considered when the operation mode of plant power is changed: closing of the bus tie switch and closing of the bus incoming switch. Auxiliary motor data collected by panoramic topology analysis of factory power includes: current continuous running time of auxiliary motors, total running time and total number of starts and stops; -The analysis structure of the low-voltage substation of the factory-the low-voltage auxiliary machine, forming a connection relation table of the panoramic topology.
在步骤2)中安全裕度通过以下方式分析:In step 2) the safety margin is analyzed by:
计算高压母线的负荷,根据母线负荷计算并判定母线的安全裕度:负荷裕度=启动允许的最大容量-当前的负荷;安全裕度=(负荷裕度-启动电动机的容量)/自启动允许的最大容量,当安全裕度小于标准时,认为当前的母线需要进行调整。当安全裕度小于标准时,确定待停的辅机电机。Calculate the load of the high-voltage bus, and calculate and determine the safety margin of the bus according to the bus load: load margin = maximum capacity allowed for starting - current load; safety margin = (load margin - capacity of the starting motor) / self-starting allowable The maximum capacity of , when the safety margin is less than the standard, it is considered that the current bus needs to be adjusted. When the safety margin is less than the standard, determine the auxiliary motor to be stopped.
在步骤3)按照如下方式确定待开辅机In step 3) determine the auxiliary machine to be turned on in the following manner
对待停的辅机进行分类,分类的标准如下:“机组——辅机子系统——辅机电机——属性”、“公用——辅机子系统——辅机电机——属性”进行分类;“属性”表示辅机电源的来源,包括:来自不同母线和同一母线。Classify the auxiliary machines to be stopped, and the classification criteria are as follows: "unit—auxiliary subsystem—auxiliary motor—attribute", "public—auxiliary subsystem—auxiliary motor—attribute" ; "Property" indicates the source of auxiliary power supply, including: from different busbars and the same busbar.
按照辅机的分类选择同一系统的其它辅机为待开辅机,确定待调整辅机的优先级:1)计算辅机电机的总运行时间差和连续运行时间差;2)启、停次数按照一定的比例核算为总运行时间;3按事先设定的优先级标准对辅机进行评判,并按优先级排序:在同一等级下,优先调整连续运行时间差超限的电机;在高一个等级下,优先调整等级高的电机。According to the classification of auxiliary machines, select other auxiliary machines in the same system as the auxiliary machines to be turned on, and determine the priority of the auxiliary machines to be adjusted: 1) Calculate the total running time difference and continuous running time difference of the auxiliary machine motor; 2) Start and stop times according to a certain 3. Judge the auxiliary machine according to the priority standard set in advance, and sort according to the priority: at the same level, the motor whose continuous running time difference exceeds the limit is given priority; at a higher level, Prioritize the adjustment of motors with higher grades.
在步骤4)按照如下方式确定需要调整的辅机:In step 4) determine the auxiliary machine to be adjusted as follows:
(1)根据厂用电全景拓扑模块的信息,确定待调整的母线;(1) Determine the busbar to be adjusted according to the information of the utility power panoramic topology module;
(2)根据电机运行状态分析模块的信息,制定辅机投、退的模拟方案;(2) According to the information of the motor operating state analysis module, formulate the simulation scheme of auxiliary machine switching on and off;
(3)模拟电机的投、退,并评估投退后的母线安全裕度;(3) Simulate the switching on and off of the motor, and evaluate the safety margin of the busbar after switching on and off;
(4)确定最后的调整方案。(4) Determine the final adjustment plan.
采用上述技术方案,能带来以下技术效果:Adopting the above-mentioned technical scheme can bring the following technical effects:
1.能根据厂用电的状态进行电动机的启停控制,在保留原有的自动化操控的同时,提升了装置的智能性;1. The start-stop control of the motor can be carried out according to the state of power consumption of the factory, which improves the intelligence of the device while retaining the original automatic control;
2.装置模块可分、可合,即可以作为整体同时使用,也可以单独抽出厂用电状态分析模块,加入到现有的辅控装置中,对装置进行改造;2. The device modules can be separated and combined, that is, they can be used as a whole at the same time, or the factory power status analysis module can be extracted separately, added to the existing auxiliary control device, and the device can be modified;
3.提升厂用电的安全性。3. Improve the safety of factory electricity.
附图说明Description of drawings
下面结合附图和实施例对本发明作进一步说明:Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
图1是本发明中控制装置的结构示意图。Fig. 1 is a structural schematic diagram of the control device in the present invention.
图2是厂用电拓扑结构示意图。Figure 2 is a schematic diagram of the plant power topology.
具体实施方式Detailed ways
如图1所示,一种厂用电源的智能辅助控制装置,它包括厂用电全景拓扑模块1、厂用电运行状态分析模块2、电机运行状态分析模块3以及决策模块4,厂用电全景拓扑模块1的输出端分别与厂用电运行状态分析模块2、电机运行状态分析模块3以及决策模块4的输入端连接,厂用电运行状态分析模块2以及电机运行状态分析模块3的输出端均与决策模块4的输入端连接,厂用电运行状态分析模块2的输出端与电机运行状态分析模块3的输入端连接。As shown in Figure 1, an intelligent auxiliary control device for a plant power supply, which includes a plant power panoramic topology module 1, a plant power running state analysis module 2, a motor running state analysis module 3, and a decision-making module 4. The output of the panorama topology module 1 is respectively connected to the input of the plant power running state analysis module 2, the motor running state analysis module 3, and the decision-making module 4, and the output of the plant power running state analysis module 2 and the motor running state analysis module 3 Both terminals are connected to the input terminal of the decision-making module 4, and the output terminal of the utility power operation status analysis module 2 is connected to the input terminal of the motor operation status analysis module 3.
厂用电全景拓扑模块1包括电机数据统计模块5、全景拓扑结构6以及母线负荷计算模块7。The factory power panoramic topology module 1 includes a motor data statistics module 5 , a panoramic topology structure 6 and a bus load calculation module 7 .
具体的,厂用电全景拓扑模块1的功能如下:Specifically, the functions of the utility power panoramic topology module 1 are as follows:
1)统计当前辅机电机的连续运行时间、总的运行时间和总的启、停次数。1) Count the continuous running time, total running time and total start and stop times of the current auxiliary motor.
2)拓扑分析形成“母线——辅机”的连通关系,根据连通关系,按照“厂高变——厂用高压母线——高压辅机—厂低变——低压辅机”的结构,形成全景拓扑的连通关系表。2) Topological analysis forms the connection relationship of "busbar-auxiliary machine". Connectivity table of panorama topology.
所述厂用电运行状态分析模块2包括母线安全裕度判定模块8、形成待停辅机表模块9,厂用电运行状态分析模块2根据计算母线负荷、评估母线的安全裕度,确定需要调整的母线,并对调整的效果进行评估。The analysis module 2 of the operation status of the utility power includes a bus safety margin judgment module 8 and a module 9 for forming a table of auxiliary machines to be stopped. Adjusted bus, and evaluate the effect of the adjustment.
具体的,厂用电运行状态分析模块2的功能如下:Specifically, the functions of the factory electricity running state analysis module 2 are as follows:
1)模块计算高压母线的负荷。负荷计算从低压母线开始,首先根据低压母线上工作的电动机数量多少,统计低压母线的负荷大小;再根据低压母线的负荷估算厂低变的损耗,损耗加上低压母线的负荷得到高压母线的厂低变回路的总负荷;高压母线上所有厂低变回路的负荷加上运行的高压辅机负荷,得到高压母线的负荷。1) The module calculates the load of the high-voltage bus. The load calculation starts from the low-voltage bus, first counts the load of the low-voltage bus according to the number of motors working on the low-voltage bus; then estimates the loss of the low-voltage transformer according to the load of the low-voltage bus, and adds the loss to the load of the low-voltage bus to obtain the plant of the high-voltage bus The total load of the low-voltage transformer circuit; the load of all low-voltage transformer circuits on the high-voltage bus plus the load of the operating high-voltage auxiliary machine is obtained to obtain the load of the high-voltage bus.
2)母线安全裕度的计算及判定:2) Calculation and judgment of busbar safety margin:
负荷裕度=(启动允许的最大容量-当前的负荷)Load margin = (maximum capacity allowed to start - current load)
安全裕度=(负荷裕度-启动电动机的容量)/启动允许的最大容量Safety margin = (load margin - starting motor capacity) / maximum capacity allowed for starting
当安全裕度<标准时,认为当前的母线需要进行调整;When the safety margin is less than the standard, it is considered that the current bus needs to be adjusted;
启动允许的最大容量和安全裕度的标准由电厂根据其实际需要定义。The standard of the maximum capacity and safety margin allowed for start-up is defined by the power plant according to its actual needs.
3)当一台厂用变带两条母线时,母线的启动允许最大容量减半。3) When one plant uses two busbars, the allowable maximum capacity of the busbars is halved.
4)确定待停辅机电机信息。4) Determine the motor information of the auxiliary machine to be stopped.
所述电机运行状态分析模块3包括电机安全裕度判定模块10、形成待开辅机表11,电机运行状态分析模块3保存了辅助电机的分类信息表与状态评估模型,对辅助电机的工作状态进行评估,确定调整哪些辅机电机,电机运行状态分析模块3从厂用电运行状态分析模块2接收到待停的辅机电机信息,将待停和待开电机信息传至决策模块4。Described motor running status analysis module 3 comprises motor safety margin judging module 10, forms the auxiliary machine table 11 to be opened, and motor running status analysis module 3 has saved the classification information table and state evaluation model of auxiliary motor, and the working status of auxiliary motor To evaluate and determine which auxiliary motors to adjust, the motor running state analysis module 3 receives the information of the auxiliary motors to be stopped from the factory power running state analysis module 2, and transmits the information of the motors to be stopped and powered on to the decision-making module 4.
电机运行状态分析模块3功能如下:The functions of the motor running state analysis module 3 are as follows:
1)辅机电机的分类信息表按照“机组——辅机子系统——辅机电机——属性”、“公用——辅机子系统——辅机电机——属性”进行分类;“属性”表示辅机电源的来源,包括:来自不同母线和同一母线;1) The classification information table of auxiliary motors is classified according to "unit—auxiliary subsystem—auxiliary motor—attribute", "public—auxiliary subsystem—auxiliary motor—attribute"; "attribute "Indicates the source of auxiliary power supply, including: from different busbars and the same busbar;
2)按照辅机的分类选择同一系统的其它辅机为待开辅机;2) According to the classification of auxiliary machines, select other auxiliary machines of the same system as auxiliary machines to be turned on;
3)确定待调整辅机的优先级,对同一子系统的电机按照总的运行时间、连续运行时间和启、停次数进行评估,其规则如下:3) Determine the priority of the auxiliary machine to be adjusted, and evaluate the motors of the same subsystem according to the total running time, continuous running time and the number of starts and stops. The rules are as follows:
1)计算辅机电机的总运行时间差和连续运行时间差;1) Calculate the total running time difference and continuous running time difference of the auxiliary motor;
2)启、停次数按照一定的比例核算为总运行时间;2) The number of starts and stops is calculated as the total running time according to a certain ratio;
3)按照事先设定的优先级标准进行评判,并按优先级排序:3) Judging according to the priority criteria set in advance, and sorting by priority:
在同一等级下,优先调整连续运行时间差超限的电机;At the same level, give priority to adjusting the motor whose continuous running time difference exceeds the limit;
在高一个等级下,优先调整等级高的电机;At a higher level, the motor with a higher level will be adjusted first;
所述决策模块4包括模拟启停模块12以及形成启停方案模块13,模拟电机的投、退,评估投退后母线的安全裕度,确定电机的投、退方案。The decision-making module 4 includes a simulation start-stop module 12 and a start-stop scheme module 13, which simulates the switching on and off of the motor, evaluates the safety margin of the bus after switching on and off, and determines the switching on and off scheme of the motor.
决策模块4的功能如下:The functions of the decision-making module 4 are as follows:
(1)根据厂用电全景拓扑模块的信息,确定待调整的母线;(1) Determine the busbar to be adjusted according to the information of the utility power panoramic topology module;
(2)根据电机运行状态分析模块的信息,制定辅机投、退的模拟方案;(2) According to the information of the motor operating state analysis module, formulate the simulation scheme of auxiliary machine switching on and off;
(3)模拟电机的投、退,并评估投退后的母线安全裕度;(3) Simulate the switching on and off of the motor, and evaluate the safety margin of the busbar after switching on and off;
(4)确定最后的调整方案。(4) Determine the final adjustment plan.
具体的,在使用时,采用以下流程:Specifically, when in use, the following process is adopted:
(1)当厂用电运行方式变化后,厂用电全景拓扑模块1启动统计电机的运行数据。方式变化仅考虑4种方式:母线联络开关合闸,母线进线开关合闸,辅机电机启、停;(1) When the plant power operation mode changes, the plant power panorama topology module 1 starts to count the operating data of the motor. Only 4 modes are considered for mode change: closing of the bus tie switch, closing of the bus incoming switch, starting and stopping of the auxiliary motor;
(2)更新全景拓扑,确定“母线——辅机电机”的联通关系,形成连通关系表;(2) Update the panoramic topology, determine the connection relationship of "busbar-auxiliary machine motor", and form a connection relationship table;
(3)将步骤(1)的电机的运行数据传至电机运行状态分析模块3;(3) the running data of the motor of step (1) is transmitted to the motor running status analysis module 3;
(4)将步骤(2)的连通关系传至至厂用电运行状态分析模块2、电机运行状态分析模块3以及决策模块4;(4) Pass the connection relationship of step (2) to the factory electricity running state analysis module 2, the motor running state analysis module 3 and the decision-making module 4;
(5)若方式变化不是由辅机电机停止引起,则进入步骤(6);否则退出;(5) If the mode change is not caused by the auxiliary machine motor stopping, enter step (6); otherwise exit;
(6)厂用电运行状态分析模块2启动,计算母线负荷、安全裕度;(6) The factory electricity running status analysis module 2 is started, and the bus load and safety margin are calculated;
(7)对安全裕度进行评估,若存在母线的安全裕度超限,进入步骤(8);否则退出。(7) Evaluate the safety margin, if the safety margin of the bus exceeds the limit, go to step (8); otherwise, exit.
(8)根据步骤(4)的连通关系,搜索由超限母线供电的辅机电机;(8) according to the connection relationship of step (4), search for the auxiliary machine motor powered by the overrun busbar;
(9)确定这些电机为待停电机;(9) determine that these motors are motors to be stopped;
(10)将步骤(6)的母线负荷发给决策模块4;(10) send the busbar load of step (6) to decision-making module 4;
(11)将步骤(9)的待停电机信息发送给电机运行状态分析模块3;(11) the motor information to be stopped in step (9) is sent to the motor running status analysis module 3;
(12)电机运行状态分析模块3接收到步骤(11)的待停电机信息,确定电机所属的系统;(12) The motor running state analysis module 3 receives the motor information to be stopped in step (11), and determines the system to which the motor belongs;
(13)根据步骤(12)确定的系统,搜索待开电机;(13) according to the system determined in step (12), search for the motor to be turned on;
(14)评估电机的优先级,并按优先级排序;(14) Evaluate the priority of the motor and sort by priority;
(15)将步骤(14)形成的优先级发送至决策模块4;(15) send the priority that step (14) forms to decision-making module 4;
(16)决策模块4根据步骤(15)的优先级确定电机的启停方案;(16) decision-making module 4 determines the start-stop scheme of motor according to the priority of step (15);
(17)按照步骤(16)的方案,按照排序进行启停模拟;(17) According to the scheme of step (16), carry out the start-stop simulation according to the sorting;
(18)按照步骤(4)的连通关系,分别计算停机的母线和开机的母线的安全裕度(18) According to the connection relationship in step (4), calculate the safety margins of the busbars of the shutdown and the busbars of the startup
(19)评估安全裕度,若不超限,进入下一步;否则进入步骤(17)。(19) Evaluate the safety margin, if it does not exceed the limit, go to the next step; otherwise go to step (17).
(20)确定启停的电机,并制定启停的方案。(20) Determine the motor to start and stop, and formulate a plan for starting and stopping.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810575188.0A CN108832641B (en) | 2018-06-06 | 2018-06-06 | Intelligent auxiliary control device and control method for station service power supply |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810575188.0A CN108832641B (en) | 2018-06-06 | 2018-06-06 | Intelligent auxiliary control device and control method for station service power supply |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108832641A true CN108832641A (en) | 2018-11-16 |
| CN108832641B CN108832641B (en) | 2021-05-14 |
Family
ID=64144051
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810575188.0A Active CN108832641B (en) | 2018-06-06 | 2018-06-06 | Intelligent auxiliary control device and control method for station service power supply |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108832641B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108900116B (en) * | 2018-06-06 | 2020-06-09 | 三峡大学 | Auxiliary control device and control method for power plant motor |
| CN119742865A (en) * | 2024-12-10 | 2025-04-01 | 三峡大学 | A method for assisting decision-making in the startup process of giant hydropower units |
Citations (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6443033A (en) * | 1987-08-05 | 1989-02-15 | Toshiba Corp | Power source system in power generation plant |
| JPH03276099A (en) * | 1990-03-27 | 1991-12-06 | Toshiba Corp | Auxiliary power unit |
| JPH05244737A (en) * | 1992-02-27 | 1993-09-21 | Toshiba Corp | Domestic power supply switching controller for power generating plant |
| CN101436788A (en) * | 2008-12-17 | 2009-05-20 | 江西柘林水电开发有限责任公司 | Black startup method for non standby station service supply hydroelectric station hydro-turbo generator set |
| CN102637222A (en) * | 2012-03-13 | 2012-08-15 | 中国海洋石油总公司 | Method for simulating interconnection of turbine unit and grid system |
| CN102694369A (en) * | 2011-03-23 | 2012-09-26 | 宝山钢铁股份有限公司 | Method for preventing low-voltage protection misoperation of motor caused by PT disconnection |
| CN202503358U (en) * | 2011-12-13 | 2012-10-24 | 河南省电力勘测设计院 | High-voltage auxiliary power system |
| CN103337904A (en) * | 2013-04-24 | 2013-10-02 | 南京南瑞集团公司 | Emergency control method for power grid voltage out-of-limit and equipment overload based on multi-source data |
| CN203522182U (en) * | 2013-09-11 | 2014-04-02 | 河北省电力勘测设计研究院 | Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant |
| CN103997277A (en) * | 2014-02-24 | 2014-08-20 | 冯伟忠 | Novel frequency conversion system for thermal power plant |
| CN203871919U (en) * | 2013-12-12 | 2014-10-08 | 大唐阳城发电有限责任公司 | Fast switching system of power sources |
| CN104333120A (en) * | 2014-11-11 | 2015-02-04 | 国家电网公司 | Improved 3D power switching device |
| CN104410159A (en) * | 2014-11-24 | 2015-03-11 | 国家电网公司 | Power grid black start overall process checking method based on real-time digital simulation |
| CN104882863A (en) * | 2015-06-15 | 2015-09-02 | 神华集团有限责任公司 | Relay protection configuration integrated equipment for power-plant electric auxiliary system |
| CN105281375A (en) * | 2015-11-26 | 2016-01-27 | 江苏方天电力技术有限公司 | Power matching method in power grid black start involving wind power station |
| CN105470996A (en) * | 2016-01-19 | 2016-04-06 | 鞍钢集团工程技术有限公司 | Method for ensuring access stability of surplus energy generator set |
| CN106849089A (en) * | 2017-03-24 | 2017-06-13 | 上海申能电力科技有限公司 | A kind of electric energy conversion and switching system, method and its application |
| CN106887992A (en) * | 2017-03-24 | 2017-06-23 | 上海申能电力科技有限公司 | A kind of electric energy conversion of many buses and switching system |
-
2018
- 2018-06-06 CN CN201810575188.0A patent/CN108832641B/en active Active
Patent Citations (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6443033A (en) * | 1987-08-05 | 1989-02-15 | Toshiba Corp | Power source system in power generation plant |
| JPH03276099A (en) * | 1990-03-27 | 1991-12-06 | Toshiba Corp | Auxiliary power unit |
| JPH05244737A (en) * | 1992-02-27 | 1993-09-21 | Toshiba Corp | Domestic power supply switching controller for power generating plant |
| CN101436788A (en) * | 2008-12-17 | 2009-05-20 | 江西柘林水电开发有限责任公司 | Black startup method for non standby station service supply hydroelectric station hydro-turbo generator set |
| CN102694369A (en) * | 2011-03-23 | 2012-09-26 | 宝山钢铁股份有限公司 | Method for preventing low-voltage protection misoperation of motor caused by PT disconnection |
| CN202503358U (en) * | 2011-12-13 | 2012-10-24 | 河南省电力勘测设计院 | High-voltage auxiliary power system |
| CN102637222A (en) * | 2012-03-13 | 2012-08-15 | 中国海洋石油总公司 | Method for simulating interconnection of turbine unit and grid system |
| CN103337904A (en) * | 2013-04-24 | 2013-10-02 | 南京南瑞集团公司 | Emergency control method for power grid voltage out-of-limit and equipment overload based on multi-source data |
| CN203522182U (en) * | 2013-09-11 | 2014-04-02 | 河北省电力勘测设计研究院 | Medium voltage station service system in auxiliary engine single-row configuration of two units in thermal power plant |
| CN203871919U (en) * | 2013-12-12 | 2014-10-08 | 大唐阳城发电有限责任公司 | Fast switching system of power sources |
| CN103997277A (en) * | 2014-02-24 | 2014-08-20 | 冯伟忠 | Novel frequency conversion system for thermal power plant |
| CN104333120A (en) * | 2014-11-11 | 2015-02-04 | 国家电网公司 | Improved 3D power switching device |
| CN104410159A (en) * | 2014-11-24 | 2015-03-11 | 国家电网公司 | Power grid black start overall process checking method based on real-time digital simulation |
| CN104882863A (en) * | 2015-06-15 | 2015-09-02 | 神华集团有限责任公司 | Relay protection configuration integrated equipment for power-plant electric auxiliary system |
| CN105281375A (en) * | 2015-11-26 | 2016-01-27 | 江苏方天电力技术有限公司 | Power matching method in power grid black start involving wind power station |
| CN105470996A (en) * | 2016-01-19 | 2016-04-06 | 鞍钢集团工程技术有限公司 | Method for ensuring access stability of surplus energy generator set |
| CN106849089A (en) * | 2017-03-24 | 2017-06-13 | 上海申能电力科技有限公司 | A kind of electric energy conversion and switching system, method and its application |
| CN106887992A (en) * | 2017-03-24 | 2017-06-23 | 上海申能电力科技有限公司 | A kind of electric energy conversion of many buses and switching system |
Non-Patent Citations (3)
| Title |
|---|
| HAIBIN DUAN AND LU GAN: "Orthogonal Multiobjective Chemical Reaction Optimization Approach for the Brushless DC Motor Design", 《IEEE TRANSACTIONS ON MAGNETICS》 * |
| 华东箭 等: "大金坪水电站"远动控制及少人值守"模式研究", 《四川水力》 * |
| 陈铁 等: "面向设备的水电站辅机系统建模方法研究", 《水电能源科学》 * |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108900116B (en) * | 2018-06-06 | 2020-06-09 | 三峡大学 | Auxiliary control device and control method for power plant motor |
| CN119742865A (en) * | 2024-12-10 | 2025-04-01 | 三峡大学 | A method for assisting decision-making in the startup process of giant hydropower units |
| CN119742865B (en) * | 2024-12-10 | 2025-08-29 | 三峡大学 | A decision-making aid method for the startup process of giant hydropower units |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108832641B (en) | 2021-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103928926B (en) | Load transfer plan system and method during distribution network failure | |
| CN107662499B (en) | Control method and system for power-off of pure electric vehicle | |
| CN110674282B (en) | Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method | |
| CN109066659B (en) | Microgrid island operation reliability assessment method and terminal equipment | |
| CN103762715B (en) | Parallel operation and load switching control method of 10kV generator set | |
| CN101826752A (en) | Backup power automatic switching device action simulation method in self-adaptive electric network operation mode | |
| CN111835002A (en) | A distribution network reliability assessment method, device and storage medium | |
| CN103414169B (en) | Based on relaying protection anti-error system and the method for work of automation system for the power network dispatching | |
| CN108233536A (en) | A kind of intelligent program remote handling system | |
| CN113793039B (en) | A Reliability Assessment Method for Medium and Low Voltage Distribution Networks Considering Multiple Types of Terminals | |
| CN107565581B (en) | Reactive power compensation device parallel operation system and reactive power compensation control method | |
| CN104091289A (en) | Large-scale power distribution network N-1 rapid verification method based on wiring mode rules | |
| CN103529708A (en) | Pre-operation simulation system for power distribution network and simulation analysis method | |
| CN108832695A (en) | DC microgrid system, charging loop circuit and control method thereof | |
| CN104485732B (en) | In-put control method for standby powers of transformer substations | |
| CN104158178A (en) | Smart distribution grid power supply zone recovery and whole optimization method based on reliability | |
| CN107275963B (en) | A method for automatic generation of safety measures for secondary maintenance of intelligent substation | |
| CN114239195B (en) | Electrical simulation automatic modeling method and device and readable storage medium | |
| CN120073743A (en) | Flexible interconnection power distribution network fault recovery method and system based on mobile energy storage cooperation | |
| CN108832641B (en) | Intelligent auxiliary control device and control method for station service power supply | |
| CN114221326A (en) | Segmented transfer strategy when the centralized self-healing function transfer capability is insufficient | |
| CN114094594B (en) | Hierarchical control method and device for direct current load of transformer substation and terminal equipment | |
| CN107681652A (en) | A kind of feeder line N 1 for considering distributed power source can fill calculation of capacity model | |
| CN106026047A (en) | Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation | |
| CN206272248U (en) | High-power high voltage and machine diesel generating set |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20240814 Address after: 518000 1104, Building A, Zhiyun Industrial Park, No. 13, Huaxing Road, Henglang Community, Longhua District, Shenzhen, Guangdong Province Patentee after: Shenzhen Hongyue Information Technology Co.,Ltd. Country or region after: China Address before: 443002 No. 8, University Road, Xiling District, Yichang, Hubei Patentee before: CHINA THREE GORGES University Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241224 Address after: 517000 West of Yuewang Avenue and North of Yongxiang Road, 14th Floor, Building A, Huijing International Business Center, Heyuan City, Guangdong Province Patentee after: Guangdong Jintai Power Group Co.,Ltd. Country or region after: China Address before: 518000 1104, Building A, Zhiyun Industrial Park, No. 13, Huaxing Road, Henglang Community, Longhua District, Shenzhen, Guangdong Province Patentee before: Shenzhen Hongyue Information Technology Co.,Ltd. Country or region before: China |