CN203352172U - Auxiliary power wiring structure for large thermal power plant - Google Patents

Auxiliary power wiring structure for large thermal power plant Download PDF

Info

Publication number
CN203352172U
CN203352172U CN2013204478032U CN201320447803U CN203352172U CN 203352172 U CN203352172 U CN 203352172U CN 2013204478032 U CN2013204478032 U CN 2013204478032U CN 201320447803 U CN201320447803 U CN 201320447803U CN 203352172 U CN203352172 U CN 203352172U
Authority
CN
China
Prior art keywords
station
station service
section
segment
transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013204478032U
Other languages
Chinese (zh)
Inventor
张力
戴秋华
刘光华
胡军
刘晓莲
宁秀元
杨红
刘思佳
黄梅玲
张娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Hunan Electric Power Design Institute Co Ltd
Original Assignee
HUNAN ELECTRIC POWER PROSPECTING DESIGN INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ELECTRIC POWER PROSPECTING DESIGN INST filed Critical HUNAN ELECTRIC POWER PROSPECTING DESIGN INST
Priority to CN2013204478032U priority Critical patent/CN203352172U/en
Application granted granted Critical
Publication of CN203352172U publication Critical patent/CN203352172U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses an auxiliary power wiring structure for a large thermal power plant. The structure at least comprises an even number, no less than two, of generator sets. A generator outlet circuit breaker is arranged at each generator outlet. An enclosed busbar is connected between the circuit breaker of the generator set and a main transformer. The primary side of a high-voltage station service transformer is connected with the enclosed busbar. The secondary side of the high-voltage station service transformer is connected with a station service operation A segment and a station service operation B segment through a nonsegregated busbar. The station service operation A segment and the station service operation B segment of each generator set are connected with the station service operation A segment and the station service operation B segment of another generator set through a nonsegregated busbar, respectively. The joints of the station service operation A segment and the station service operation B segment of each generator set and the nonsegregated busbar are provided with circuit breakers. In this way, a hand-in-hand structure is formed between the station service operation segments of two generator sets. According to the utility model, the auxiliary power wiring is simplified, the floor space of the equipment and the initial investment of building a power plant are decreased, and the operation expense after the installation of the power plant is reduced.

Description

A kind of large thermal power plant station service wiring construction
Technical field
The utility model belongs to the Power Station Design field, relates to a kind of large thermal power plant station service wiring construction.
Background technology
Station service refers to that power plant is starting, turn round, stop labour, in maintenance process, drags the required electricity consumption of the power consumption equipments such as operation, operation, test, maintenance, illumination of the motor of station-service plant equipment and full factory.Visible, the reliability service of power plant be unable to do without reliable station service.Yet the wiring construction of station service is closely related with the station service power supply again, therefore, the station service wiring need meet reliability, the flexibility of operation and the requirement of economic rationality to power supply.When the research wiring construction, for clear, convenient, usually three-phase circuit figure is reduced to line chart and is described.
The station service wiring not only requires to meet power plant's reliability service, also meet the flexibility of operation and the economy of building power plant simultaneously, particularly requiring to build under the environment of life cycle management maximizing the benefits power plant at present, the wiring of appropriate design station service, the initial investment of minimizing power plant reaches operation and maintenance cost in the future becomes focus.
Large thermal power plant when generator outlet circuit breaker (Generator Circuit-Breakers, GCB) is set, shutdown transformer of operated by rotary motion or have the spare transformer of stopping function concurrently.The power supply of shutting down transformer draws and is connected to two kinds of structures: do not establish high voltage bus in factory 1., electric energy adopts generator-circuit breaker-transformer-sets of lines form directly to send, now set shutdown transformer need to arrange special circuit and draws and connect from electrical network, build special circuit and will increase certain investment cost, simultaneously, " separating the factory and network, surf the Net at a competitive price " today, it is inevitable collecting " basic charge as per installed capacity ", take and build 2 * 1000MW unit as example, press the basic charge as per installed capacity 20 yuan/kVA month, 30 years meters of economical operation, the basic charge as per installed capacity of paying in the life cycle management domestic demand is converted present worth: 21,075 ten thousand yuan, 2. while in factory, high voltage bus being set, electric energy is sent via high voltage distribution installation again, now shuts down transformer and generally from power distribution equipment in power plant, draws and connect, and saves the expense and the basic charge as per installed capacity that set up special circuit, reach increase equipment in power distribution equipment but the shutdown transformer will be set, increased investment.Therefore, during new power plant construction, under the prerequisite that guarantees station service reliability and operational flexibility, how evading " basic charge as per installed capacity " and reduce cost becomes the problem that the large thermal power plant design needs emphasis to consider.
The utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned existence, and the station service wiring construction that in a kind of power reliable, flexible operation and life cycle management, investment and operating cost economize most is provided.
A kind of large thermal power plant station service wiring construction, at least comprise two and above even number platform generating set, every generator outlet is equipped with generator outlet circuit breaker GCB, and every generating set all adopts the wiring construction of generator-circuit breaker-transformer, be connected with enclosed busbar between the circuit breaker of described generating set and main transformer, the former limit of HV Auxiliary Transformer is connected with enclosed busbar; The secondary of HV Auxiliary Transformer is connected with station-service work B section with station-service work A section by common box bus; The station-service work A section of every generating set is connected with station-service work B section with the station-service work A section of another generating set respectively by common box bus with station-service work B section;
Every generating set station-service work A section and station-service work B section and common box bus junction are equipped with circuit breaker.
The large electric power plant unit refers to 600MW level and above thermal power generation unit;
Station-service active section electric pressure adopts 6kV or 10kV.
Beneficial effect
The utility model provides a kind of large thermal power plant station service wiring construction, at least comprise two and above even number platform generating set, every generator outlet is equipped with the generator outlet circuit breaker, and every generating set all adopts the wiring construction of generator-circuit breaker-transformer, be connected with enclosed busbar between the circuit breaker of described generating set and main transformer, the former limit of HV Auxiliary Transformer is connected with enclosed busbar; The secondary of HV Auxiliary Transformer is connected with station-service work B section with station-service work A section by common box bus; The station-service work A section of every generating set is connected with station-service work B section with the station-service work A section of another generating set respectively by common box bus with station-service work B section; Every generating set station-service work A section and station-service work B section and common box bus junction are equipped with circuit breaker.Adopt wiring construction described in the utility model greatly to simplify the station service wiring; Between two units, the station-service active section is connected to each other; having formed HV Auxiliary Transformer shuts down standby each other; save to arrange and shut down transformer or spare transformer; not only reduced the initial investment of occupation area of equipment and new power plant construction; and avoided power plant to build up rear produced basic charge as per installed capacity problem, make power plant reach maximizing the benefits in life cycle.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Figure 1, for structural representation of the present utility model, a kind of large thermal power plant station service wiring construction, at least comprise two and above even number platform generating set, every generator outlet is equipped with the generator outlet circuit breaker, and every generating set all adopts the wiring construction of generator-circuit breaker-transformer, be connected with enclosed busbar between the circuit breaker of described generating set and main transformer, the former limit of HV Auxiliary Transformer is connected with enclosed busbar; The secondary of HV Auxiliary Transformer is connected with station-service work B section with station-service work A section by common box bus; The station-service work A section of every generating set is connected with station-service work B section with the station-service work A section of another generating set respectively by common box bus with station-service work B section;
Every generating set station-service work A section and station-service work B section and common box bus junction are equipped with circuit breaker.
The large electric power plant unit refers to 600MW level and above thermal power generation unit;
Station-service active section electric pressure adopts 6kV or 10kV.
Shut down transformer or spare transformer in the situation that do not establish, the station-service active section between two units is connected to each other and forms the station service wiring of " handing in hand ".
The wiring of " handing in hand " of above-mentioned station service at least includes two generating sets, and it can extend to four units or multicomputer more, but is connected to each other for the station-service active section between every two units, forms " handing in hand " wiring.
It is standby each other that the station-service active section of above-mentioned every unit is connected to each other by common box bus the high-voltage Auxiliary Working transformer that refers to two units; when a unit need to be shut down stand-by power supply, by another unit HV Auxiliary Transformer, to it, provide and shut down required power supply.Compare with traditional design method to save the shutdown transformer is set, reduce the new power plant construction initial investment, the basic charge as per installed capacity that need to pay while saving operation has reduced the equipment land area simultaneously.

Claims (1)

1. a large thermal power plant station service wiring construction, it is characterized in that, at least comprise two and above even number platform generating set, every generator outlet is equipped with the generator outlet circuit breaker, and every generating set all adopts the wiring construction of generator-circuit breaker-transformer, be connected with enclosed busbar between the circuit breaker of described generating set and main transformer, the former limit of HV Auxiliary Transformer is connected with this enclosed busbar; The secondary of HV Auxiliary Transformer is connected with station-service work B section with station-service work A section by common box bus; The station-service work A section of every generating set is connected with station-service work B section with the station-service work A section of another generating set respectively by common box bus with station-service work B section;
Every generating set station-service work A section and station-service work B section and common box bus junction are equipped with circuit breaker.
CN2013204478032U 2013-07-25 2013-07-25 Auxiliary power wiring structure for large thermal power plant Expired - Fee Related CN203352172U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013204478032U CN203352172U (en) 2013-07-25 2013-07-25 Auxiliary power wiring structure for large thermal power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013204478032U CN203352172U (en) 2013-07-25 2013-07-25 Auxiliary power wiring structure for large thermal power plant

Publications (1)

Publication Number Publication Date
CN203352172U true CN203352172U (en) 2013-12-18

Family

ID=49752023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013204478032U Expired - Fee Related CN203352172U (en) 2013-07-25 2013-07-25 Auxiliary power wiring structure for large thermal power plant

Country Status (1)

Country Link
CN (1) CN203352172U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107612137A (en) * 2017-11-06 2018-01-19 国网福建省电力有限公司 A kind of high reliability pressurized-water reactor nuclear power plant station service electric power system
CN110601235A (en) * 2019-10-15 2019-12-20 西安热工研究院有限公司 Super capacitor auxiliary frequency modulation system suitable for multiple units of thermal power plant
CN112865077A (en) * 2021-01-13 2021-05-28 西安热工研究院有限公司 Locking method for factory power supply system switch in hand-pulling mode
CN114156918A (en) * 2021-11-25 2022-03-08 中盐华能储能科技有限公司 Transformer of salt cavern compressed air energy storage power station and low-voltage station service configuration method
CN114336617A (en) * 2022-01-12 2022-04-12 中国核电工程有限公司 Power supply system of nuclear energy heat supply plant

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107612137A (en) * 2017-11-06 2018-01-19 国网福建省电力有限公司 A kind of high reliability pressurized-water reactor nuclear power plant station service electric power system
CN110601235A (en) * 2019-10-15 2019-12-20 西安热工研究院有限公司 Super capacitor auxiliary frequency modulation system suitable for multiple units of thermal power plant
CN112865077A (en) * 2021-01-13 2021-05-28 西安热工研究院有限公司 Locking method for factory power supply system switch in hand-pulling mode
CN112865077B (en) * 2021-01-13 2023-08-08 西安热工研究院有限公司 Locking method of factory power system switch in hand-in-hand mode
CN114156918A (en) * 2021-11-25 2022-03-08 中盐华能储能科技有限公司 Transformer of salt cavern compressed air energy storage power station and low-voltage station service configuration method
CN114336617A (en) * 2022-01-12 2022-04-12 中国核电工程有限公司 Power supply system of nuclear energy heat supply plant
CN114336617B (en) * 2022-01-12 2024-02-02 中国核电工程有限公司 Power supply system of nuclear energy heat supply plant

Similar Documents

Publication Publication Date Title
CN203352172U (en) Auxiliary power wiring structure for large thermal power plant
CN102545200A (en) Multi-port direct-current distribution network system based on voltage source converter
CN203747504U (en) New-energy AC-DC integrated station power system used for transformer station
CN102957105B (en) A kind of intelligent substation based on clean energy resource application
CN204349309U (en) Photovoltaic inversion boosting integrated box type transformer station
CN104953613A (en) Intelligent building micro-grid system and control method
CN103117555A (en) Novel integrated device of solar energy assisted thermal power station
CN202749891U (en) Alternating current-direct current integrated power supply apparatus
CN202495699U (en) Photovoltaic grid-connected power generation voltage-boosting intelligent box-type transformer substation
CN204992581U (en) Apply to electric main wiring of two electric pressure intermediate pressure sections of wind -powered electricity generation field
CN203722249U (en) Distributed photovoltaic grid-connected power generation system
CN108879945A (en) A kind of auxiliary single-line diagram structure of garbage incinerating power plant
CN215772551U (en) Photovoltaic-based alternating current-direct current power supply system for long-distance water delivery main channel engineering
CN202049382U (en) Electric power system for pulp mill owned critical power plant black-start
CN212486196U (en) Power supply system is synthesized to inside of large-scale coal-electricity integration power station
CN203481825U (en) Optimized natural gas distribution-type energy main wiring circuit
CN108418217A (en) The configuration method of station service electrical system
CN115102226A (en) Offshore wind power low frequency conveying system
CN201298734Y (en) Main electrical wiring for starting fuel gas and steam combined cycle generator set in two-drive-one mode with variable frequency
CN111342549A (en) Power supply system is synthesized to inside of large-scale coal-electricity integration power station
CN207910471U (en) A kind of hybrid AC/DC power transmission systems containing specific load
CN206807137U (en) A kind of station electricity consumption connection circuit of wind power plant
CN105470822A (en) Power supply and distribution system for organic amine desulfurization and acid making process
CN105914790A (en) Low power factor resistant distributed photovoltaic power station
CN106411144B (en) A kind of railway traction power supply system based on photovoltaic generation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP HUNAN ELECTRIC POWE

Free format text: FORMER NAME: HUNAN ELECTRIC POWER PROSPECTING DESIGN INST.

CP03 Change of name, title or address

Address after: 410007 No. 471 West labour Road, Hunan, Changsha

Patentee after: HUNAN ELECTRIC POWER DESIGN INSTITUTE OF CHINA ENERGY EGINEERING Corp.,Ltd.

Address before: The 410000 West Hunan province Changsha Yuhua District No. 471

Patentee before: Hunan Electric Power Design Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131218

CF01 Termination of patent right due to non-payment of annual fee