CN203514310U CN201320661536.9U CN201320661536U CN203514310U CN 203514310 U CN203514310 U CN 203514310U CN 201320661536 U CN201320661536 U CN 201320661536U CN 203514310 U CN203514310 U CN 203514310U
Authority
CN
China
Prior art keywords
country rock
surrounding rock
rock
prestressed anchor
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320661536.9U
Other languages
Chinese (zh)
Inventor
胡林江
胡育林
杨军
文学军
康粉红
李国权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN201320661536.9U priority Critical patent/CN203514310U/en
Application granted granted Critical
Publication of CN203514310U publication Critical patent/CN203514310U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses surrounding rock of an underground plant. The surrounding rock comprises a plurality of mortar anchor rods and a plurality of prestressed anchor cables. The mortar anchor rods and the prestressed anchor cables penetrate a surrounding rock wall to be inserted into a surrounding rock body, a plurality of grouting holes are formed in the surrounding rock body, and cement slurry is filled in the grouting holes; a reinforcing mesh is laid on the surrounding rock wall and is fixed onto the surrounding rock wall by the aid of reinforcing arch ribs, prestressed anchor rods and the prestressed anchor cables, and the reinforcing arch ribs are fixed onto the surrounding rock wall by the aid of the prestressed anchor rods and the prestressed anchor cables. The surrounding rock has the advantages that the integrity of the surrounding rock can be improved, the surrounding rock is firm and reliable in structure, deformation of the surrounding rock can be effectively prevented, and accordingly problems of cracking and dropping of coatings of spandrel positions of an existing underground plant with broken surrounding rock can be solved.

Description

A kind of underground power house country rock
Technical field
The utility model relates to a kind of underground power house country rock.
Background technology
Underground power house main building spandrel position is the most concentrated region of stress.Because factory building downstream abutment wall has the caverns such as bus tunnel and draft tube tunnel, for the more broken underground power house of country rock, often there is spray-up cracking and obscission in its spandrel position, downstream spray-up after being excavated to III, IV layer.This is because stress is concentrated, and due to being out of shape after rock crusher.Existing processing method is generally Prestressing anchor cable in country rock, but the more broken underground power house of country rock, and this processing method can not prevent well spandrel position spray-up cracking and come off.
Summary of the invention
Technical problem to be solved in the utility model is, not enough for prior art, and a kind of underground power house country rock is provided, and prevents surrouding rock deformation, thereby prevents the spandrel position spray-up cracking of the underground power house that country rock is more broken and come off.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of underground power house country rock, comprise many grouting rock bolts and Duo Gen prestress anchorage cable, it is inner that described grouting rock bolt and prestress anchorage cable all insert country rock through country rock wall, on country rock, offer a plurality of grout holes, in described grout hole, be perfused with cement paste; On described country rock wall, be equipped with steel mesh reinforcement, described steel mesh reinforcement is fixed on described country rock wall by reinforcing bar arch rib, prestressed anchor, prestress anchorage cable, and described reinforcing bar arch rib is fixed on described country rock wall by described prestressed anchor and prestress anchorage cable.
Pneumatically placed concrete on steel mesh reinforcement, described many grouting rock bolts are divided into some rows and are arranged in described country rock, and described many prestressed anchors are divided into some rows and are arranged in described country rock, and described prestressed anchor and described grouting rock bolt interval layout; On country rock between each row grouting rock bolt and the row prestressed anchor that is adjacent, all offer described grout hole, make surrounding rock structure tightr.
Compared with prior art, the beneficial effect that the utility model has is: the utility model has strengthened country rock globality, make surrounding rock structure fastening reliable, can effectively prevent surrouding rock deformation, thereby prevent the spandrel position spray-up cracking of the underground power house that country rock is more broken and come off.
Accompanying drawing explanation
Fig. 1 is the utility model one embodiment front view;
Fig. 2 is the utility model one embodiment sectional view.
The specific embodiment
As depicted in figs. 1 and 2, the utility model one embodiment comprises many mortar dowels 6, prestressed anchor 4 and Duo Gen prestress anchorage cable 5, it is inner that described grouting rock bolt 6, prestressed anchor 4 and prestress anchorage cable 5 all insert country rock through country rock wall 7, on country rock, offer two row's grout holes 1, in described grout hole 1, be perfused with cement paste; On described country rock wall, be equipped with steel mesh reinforcement 2, described steel mesh reinforcement 2 is fixed on described country rock wall 7 by reinforcing bar arch rib 3, prestressed anchor 4 and prestress anchorage cable 5, and described reinforcing bar arch rib 3 is fixed on described country rock wall 7 by described prestress anchorage cable 5 and prestressed anchor 4; Sprayed mortar on steel mesh reinforcement 2.
As shown in Figure 1, sprayed mortar on steel mesh reinforcement, described many grouting rock bolts 6 are divided into four rows and are arranged in described country rock, and described many prestressed anchors are divided into three rows and are arranged in described country rock, and described prestressed anchor 4 is arranged with described grouting rock bolt 6 intervals; On country rock between each row grouting rock bolt 6 and the row prestressed anchor 4 that is adjacent, all offer described grout hole 1.
The utility model Specific construction process is as follows:
(1) country rock is first carried out to consolidation grouting processing, arrange the grout hole of 2 row's spacing 2.4m, grout hole diameter is 56mm, hole depth 5m, and single hole once pours into, grouting pressure 0.5~0.8MPa;
(2) consolidation grouting hangs the processing of steel mesh reinforcement pneumatically placed concrete after completing, before carrying out shotcrete with mesh, need cut totally cracking and the spray-up flaking, steel mesh reinforcement adopts the bar reinforcement net of 200mm * 200mm, and the rebar sizes in steel mesh reinforcement is φ 25;
(3) 1 row 1500kN, spacing 4.8m, length is prestress anchorage cable, the 3 row Φ 32 of 25m, spacing 2.4m, tonnage 200kN, the prestressed anchor that length is 12m, 4 row Φ 32 spacing 2.4m, the grouting rock bolt of length 9m, at prestress anchorage cable, prestressed anchor location arrangements reinforcing bar arch rib, reinforcing bar arch rib is fixed on country rock wall by prestress anchorage cable and prestressed anchor.

Claims (3)

1. a underground power house country rock, comprise many grouting rock bolts (6) and many prestress anchorage cables (5), it is inner that described grouting rock bolt (6) and prestress anchorage cable (5) all insert country rock through country rock wall (7), it is characterized in that, on country rock wall, offer a plurality of grout holes (1), described grout hole is perfused with cement paste in (1); In described country rock, be fixed with many prestressed anchors (4); On described country rock wall (7), be equipped with steel mesh reinforcement (2), it is upper that described steel mesh reinforcement (2) is fixed on described country rock wall (7) by reinforcing bar arch rib (3), prestressed anchor (4), prestress anchorage cable (5), and described reinforcing bar arch rib (3) is fixed on described country rock wall (7) by described prestress anchorage cable (5) and prestressed anchor (4).
2. underground power house country rock according to claim 1, is characterized in that, described steel mesh reinforcement is sprayed with concrete on (2).
3. underground power house country rock according to claim 1 and 2, it is characterized in that, described many grouting rock bolts (6) are divided into some rows and are arranged in described country rock, described many prestressed anchors (4) are divided into some rows and are arranged in described country rock, and described prestressed anchor (4) is arranged with described grouting rock bolt (6) interval; On country rock between each row grouting rock bolt (6) and the row prestressed anchor (4) that is adjacent, all offer described grout hole (1).
CN201320661536.9U 2013-10-25 2013-10-25 Surrounding rock of underground plant Expired - Lifetime CN203514310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320661536.9U CN203514310U (en) 2013-10-25 2013-10-25 Surrounding rock of underground plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320661536.9U CN203514310U (en) 2013-10-25 2013-10-25 Surrounding rock of underground plant

Publications (1)

Publication Number Publication Date
CN203514310U true CN203514310U (en) 2014-04-02

Family

ID=50373265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320661536.9U Expired - Lifetime CN203514310U (en) 2013-10-25 2013-10-25 Surrounding rock of underground plant

Country Status (1)

Country Link
CN (1) CN203514310U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032749A (en) * 2014-06-20 2014-09-10 中国水电顾问集团华东勘测设计研究院有限公司 Excavation supporting method for foundations high in ground stress and easy to loose
CN105275486A (en) * 2015-11-09 2016-01-27 中国矿业大学(北京) Anchor pole and rope combined strutted structure and construction method thereof
CN106089261A (en) * 2016-07-28 2016-11-09 中国电建集团成都勘测设计研究院有限公司 The forward supporting construction of tunnel abutment wall and method for protecting support in steep dip thin layer country rock
CN107905805A (en) * 2017-11-15 2018-04-13 中国电建集团华东勘测设计研究院有限公司 One kind ensures that underground power house machine hole dividing pier excavates molding strengthening supporting method and underground power house machine hole dividing pier structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032749A (en) * 2014-06-20 2014-09-10 中国水电顾问集团华东勘测设计研究院有限公司 Excavation supporting method for foundations high in ground stress and easy to loose
CN104032749B (en) * 2014-06-20 2016-05-04 中国水电顾问集团华东勘测设计研究院有限公司 A kind of high-ground stress, easy lax foundation excavation method for protecting support
CN105275486A (en) * 2015-11-09 2016-01-27 中国矿业大学(北京) Anchor pole and rope combined strutted structure and construction method thereof
CN105275486B (en) * 2015-11-09 2017-12-22 中国矿业大学(北京) A kind of anchor shaft anchor cable combined support structure and its construction method
CN106089261A (en) * 2016-07-28 2016-11-09 中国电建集团成都勘测设计研究院有限公司 The forward supporting construction of tunnel abutment wall and method for protecting support in steep dip thin layer country rock
CN107905805A (en) * 2017-11-15 2018-04-13 中国电建集团华东勘测设计研究院有限公司 One kind ensures that underground power house machine hole dividing pier excavates molding strengthening supporting method and underground power house machine hole dividing pier structure
CN107905805B (en) * 2017-11-15 2024-04-26 中国电建集团华东勘测设计研究院有限公司 Reinforced supporting method for guaranteeing excavation molding of machine pit partition piers of underground powerhouse and machine pit partition pier structure of underground powerhouse

Similar Documents

Publication Publication Date Title
CN103527219B (en) For the construction of the tunnel support structure on large deformation stratum
CN102852528A (en) Method for controlling floor heave through inverted arch anchoring beam
CN104074529B (en) A kind of cave continuous bivalve, lane, deep reinforcement means
CN203515604U (en) Tunnel Support structure for schist layer in deformation
CN203514310U (en) Surrounding rock of underground plant
CN102140924B (en) Double-shell coupling supporting method of deep soft rock tunnel
CN102493821B (en) Support method for high stress roadway coal-rock mass
CN203603930U (en) Device for preventing tunnel secondary lining vault from disengaging
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN104989421A (en) Support structure for preventing settlement deformation of tunnels and construction method thereof
CN203049591U (en) Reinforced structure of fractured rock mass and high oriented side slope
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN104746517A (en) Anchor rod retaining and protecting system with overall length below pressure-bearing water head
CN202194129U (en) Composite prestress soil-blocking pile
CN106677192A (en) Row pile anchoring cement soil pile continuous wall supporting structure and construction process thereof
CN204960946U (en) Prevention tunnel subsides supporting construction of deformation
CN205024710U (en) Adopt raft foundation structure of anti prestressed anchorage of floating cable
CN105156137B (en) Tunnel side wall preliminary bracing method in V~VI grade of country rock
CN106120820A (en) The anchoring process of a kind of rock side slope and structure
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN205100993U (en) Ore removal level drift section supporting construction
CN204266216U (en) A kind of bamboo beam anchoring support structure of side slope
CN105350993A (en) Tunnel full-section anchor cable and beam injection combined supporting technology
CN201896623U (en) Pipe curtain device for penetration of deep lane of coal mine through fault and fracture zone
CN105201525A (en) Repairable bottom heave control method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp.

CX01 Expiry of patent term

Granted publication date: 20140402

CX01 Expiry of patent term