CN203513077U - Lifting turnover tool for nonmetallic combustor - Google Patents

Lifting turnover tool for nonmetallic combustor Download PDF

Info

Publication number
CN203513077U
CN203513077U CN201320588653.7U CN201320588653U CN203513077U CN 203513077 U CN203513077 U CN 203513077U CN 201320588653 U CN201320588653 U CN 201320588653U CN 203513077 U CN203513077 U CN 203513077U
Authority
CN
China
Prior art keywords
chuck
combustion chamber
hanger
connecting cleat
pull bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320588653.7U
Other languages
Chinese (zh)
Inventor
梁晓东
杨阳
邓萍
王晗光
蒋积才
梁虎
刘克文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN AEROSPACE CHEMICAL PROPULTION PLANT
Original Assignee
XI'AN AEROSPACE CHEMICAL PROPULTION PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN AEROSPACE CHEMICAL PROPULTION PLANT filed Critical XI'AN AEROSPACE CHEMICAL PROPULTION PLANT
Priority to CN201320588653.7U priority Critical patent/CN203513077U/en
Application granted granted Critical
Publication of CN203513077U publication Critical patent/CN203513077U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a lifting turnover tool for a nonmetallic combustor. Two chucks are used for loading and clamping the combustor. A round surface of one side of the chuck is provided with a convex clamp ring, and the inner diameter of the clamp ring is equal to the external diameter of the lifted engine combustor. A rubber gasket is adhered on the round surface, with the clamp ring, of the chuck, and the rubber gasket is located in the clamp ring; the inner round surface of the clamp ring is also adhesively provided with the rubber gasket. Lifting lugs are fixed on the circumferential surface of the chuck; four penetrated draw bar through holes are formed in the surface of the chuck. The draw bars are telescopic, and two ends of each draw bar are provided with external threads. Two sets of turnover lifting appliances are respectively in fixed connections with the lifting lugs of the two chucks. The lifting turnover tool for the nonmetallic combustor eliminates potential quality hazard of scratches of a shell, avoids dumping of the combustor during the lifting process and eliminates safety hazard.

Description

A kind of for non-metal combustion chamber lifting upset frock
Technical field
The invention belongs to Solid Rocket Motor Technology field, relate to a kind of large-scale non-metal combustion chamber overturning and hoisting and upset frock.
Background technology
Non-metal shell combustion chamber, after the demoulding completes, needs entrucking and turns shaping, general assembly operation, and prior art is that the demoulding finishes rear use band non-metal combustion chamber is risen and winches to transfer car(buggy), is then transported to trimming.In band lifting process because band directly contacts with non-metal shell, in lifting process, easily surface of shell is rubbed to wound, cause hidden danger of quality, while lifting by crane, be not easy to judge the lifting position of band simultaneously, easily cause toppling over of in lifting process non-metal combustion chamber, cause potential safety hazard.Through retrieval, do not find the technology close with the present invention.
Summary of the invention
In order to overcome, rubbing of existing in prior art hindered housing and combustion chamber is toppled over the potential safety hazard of bringing, and the present invention proposes a kind of for non-metal combustion chamber upset frock.
The present invention includes two chucks, chuck hanger, pull bar and reversal hanger.Two chucks are used for the combustion chamber that is installed.One side circular surfaces of this chuck has the snap ring of protrusion, and the internal diameter of this snap ring is identical with the external diameter of the engine chamber being lifted.At described chuck, there is the circular surfaces of snap ring to be pasted with rubber pad, and make described rubber pad in snap ring; Internal circular surfaces at described snap ring is also pasted with rubber pad.Circumferential surface at chuck is fixed with hanger; The pull bar via hole that has four perforations on the surface of chuck.Described pull bar is telescopic for adopting, and at the two ends of pull bar, has outside thread.Two cover reversal hangers are connected with the hanger of two chucks respectively.
Described hanger comprises clamping plate and suspension rod.End face center, suspension rod one end have a screw, the suspension rod other end and clamping plate are connected.In the two side wall panels of described U-shaped clamping plate, there is concentric tapped bore.
Described pull bar via hole is divided into two groups, respectively in the clamping plate inner side being fixed on chuck.
Reversal hanger is two covers, and every cover reversal hanger comprises two attaching partss and three steel ropes.The lower end of described each attaching parts is connected with the upper end of steel cable respectively, and the upper end of described each attaching parts is connected with the two ends with steel cable.The lower end of the steel rope that described and lower end each attaching parts is connected is all connected with transition piece.
Described transition piece is U-shaped part, and at the bottom of this transition piece U-lag, there is the contiguous block of protrusion one end, has the connecting bore of perforation on this contiguous block.The line of centers of described connecting bore is perpendicular to the side surface of contiguous block.
Described attaching parts comprises two connecting cleats and pipe link.The plank of described each connecting cleat is two-layer.All there is screw at two ends at each connecting cleat, at the middle part of each connecting cleat, have pin-and-hole.All there is pin-and-hole at the two ends of described pipe link.The two ends of described pipe link pack in connecting cleat, and by pin, one end of this pipe link and connecting cleat middle part are linked.
When each attaching parts is connected with each steel rope, the two ends of steel cable are tied respectively and encircled and pack between the two-layer plank of described connecting cleat upper end, bolt is packed into the screw of this end connecting cleat and tightens up; The upper end knot ring of two steel ropes is packed between the two-layer plank of connecting cleat lower end, bolt is packed into the screw of this end connecting cleat and tightens up.
Need to be equipped with special tooling and the step that has potential safety hazard, the present invention proposes a kind of for large-scale non-metal combustion chamber lifting upset frock.
In order to solve the problems of the technologies described above, the present embodiment utilizes 2 chucks, scuffing of cylinder bore that non-metal combustion chamber is stuck between two chucks, by the major and minor hook of crane, hung respectively two width suspenders and the suspender other end be connected on the hanger of chuck, the lifting of controlling crane major-minor hook realizes the starting point upset of non-metal combustion chamber.So just do not need the band contacting with housing, the position that chuck inner side contacts with non-metal shell is used Rubber washer to protect, and in lifting process, other frock does not contact with housing, can eliminate the hidden danger of quality that housing rubs wound; Because combustion chamber is installed by chuck, pull bar, in lifting process, two ends are all connected with suspender, can avoid toppling over of in lifting combustion chamber, can eliminate safe hidden trouble.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the lateral plan of Fig. 1.
Fig. 3 is the structural representation of chuck.
Fig. 4 is the structural representation of pull bar.
Fig. 5 is the structural representation of reversal hanger.
Fig. 6 is the structural representation of attaching parts.
Fig. 7 is the connection diagram of transition piece.In figure:
1. non-metal burning chamber shell; 2. pull bar; 3. chuck hanger; 4. attaching parts; 5. reversal hanger; 6. chuck; 7. transition piece.
The specific embodiment
The present embodiment is a kind of for large-scale non-metal combustion chamber lifting upset frock, comprises chuck, chuck hanger 3, pull bar and reversal hanger 5.
Chuck 6 has two, is annular arrangement, for the combustion chamber that is installed.One side circular surfaces of this chuck 6 has the snap ring of protrusion, and the internal diameter of this snap ring is identical with the external diameter of the engine chamber being lifted.At described chuck 6, there is the circular surfaces of snap ring to be pasted with rubber pad, and make described rubber pad in snap ring; Internal circular surfaces at described snap ring is also pasted with rubber pad.
Circumferential surface at chuck is fixed with hanger 3, and hanger is for lifting and upset engine chamber.Described hanger comprises clamping plate and suspension rod.End face center, suspension rod one end have a screw, the suspension rod other end and clamping plate are connected.In the two side wall panels of described U-shaped clamping plate, there is concentric tapped bore.
The pull bar via hole that has four perforations on the surface of chuck.Described pull bar via hole is divided into two groups, is distributed in the clamping plate inner side being fixed on chuck.
Pull bar is telescopic for adopting.There is outside thread at two ends at pull bar.During use, the two ends end face of engine chamber is installed on respectively in the snap ring of a chuck circular surfaces protrusion, the two ends of pull bar is penetrated respectively in a pull bar via hole on chuck, and tighten up with nut at the two ends of described pull bar.The length of adjusting yoke, closely cooperates the panel surface of two chucks and the two ends end face of described engine chamber, and engine chamber is stuck between two chucks and is tightened up.
Reversal hanger 5 is two covers, and every cover reversal hanger 5 comprises two attaching partss 4 and three steel ropes.The lower end of described each attaching parts 4 is connected with the upper end of steel cable respectively, and the upper end of described each attaching parts 4 is connected with the two ends with steel cable.The lower end of the steel rope that described and lower end each attaching parts 4 is connected is all connected with transition piece.
Described transition piece is U-shaped part, and at the bottom of this transition piece U-lag, there is the contiguous block of protrusion one end, has the connecting bore of perforation on this contiguous block.The line of centers of described connecting bore is perpendicular to the side surface of contiguous block.
Described attaching parts 4 comprises two connecting cleats and pipe link.The plank of described each connecting cleat is two-layer.All there is screw at two ends at each connecting cleat, at the middle part of each connecting cleat, have pin-and-hole.All there is pin-and-hole at the two ends of described pipe link.The two ends of described pipe link pack in connecting cleat, and by pin, one end of this pipe link and connecting cleat middle part are linked.When each attaching parts 4 is connected with each steel rope, the two ends of steel cable are tied respectively and encircled and pack between the two-layer plank of described connecting cleat upper end, bolt is packed into the screw of this end connecting cleat and tightens up; The upper end knot ring of two steel ropes is packed between the two-layer plank of connecting cleat lower end, bolt is packed into the screw of this end connecting cleat and tightens up.
While carrying out the upset of non-metal combustion chamber, two chucks are contained in respectively to non-metal burner ends, pass through pull bar, through the screw rod via hole on the chuck of two ends, by nut, four pull bars are strained, thereby combustion chamber is fixed between chuck, two cover suspenders are connected with the hanger of two chucks respectively, by catch and bolt 2, suspender is fixed on hanger.Start crane, two width suspenders are hung on the major-minor hook of crane, the lifting of controlling crane major-minor hook realizes the starting point upset operation of non-metal combustion chamber.

Claims (7)

1. for a non-metal combustion chamber lifting upset frock, it is characterized in that, comprise two chucks, chuck hanger, pull bar and reversal hanger; Two chucks are used for the combustion chamber that is installed; One side circular surfaces of this chuck has the snap ring of protrusion, and the internal diameter of this snap ring is identical with the external diameter of the engine chamber being lifted; At described chuck, there is the circular surfaces of snap ring to be pasted with rubber pad, and make described rubber pad in snap ring; Internal circular surfaces at described snap ring is also pasted with rubber pad; Circumferential surface at chuck is fixed with hanger; The pull bar via hole that has four perforations on the surface of chuck; Described pull bar is telescopic for adopting, and has outside thread at the two ends of pull bar; Two cover reversal hangers are connected with the hanger of two chucks respectively.
2. a kind ofly as claimed in claim 1 for non-metal combustion chamber lifting upset frock, it is characterized in that, described hanger comprises clamping plate and suspension rod; End face center, suspension rod one end have a screw, the suspension rod other end and clamping plate are connected; In the two side wall panels of described clamping plate, there is concentric tapped bore.
3. a kind ofly as claimed in claim 1 for non-metal combustion chamber lifting upset frock, it is characterized in that, described pull bar via hole is divided into two groups, respectively in the clamping plate inner side being fixed on chuck.
4. a kind ofly as claimed in claim 1 for non-metal combustion chamber lifting upset frock, it is characterized in that, reversal hanger is two covers, and every cover reversal hanger comprises two attaching partss and three steel ropes; The lower end of described each attaching parts is connected with the upper end of steel cable respectively, and the upper end of described each attaching parts is connected with the two ends with steel cable; The lower end of the steel rope that described and lower end each attaching parts is connected is all connected with transition piece.
5. a kind ofly as claimed in claim 4 for non-metal combustion chamber lifting upset frock, it is characterized in that, described transition piece is U-shaped part, and at the bottom of this transition piece U-lag, there is the contiguous block of protrusion one end, has the connecting bore of perforation on this contiguous block; The line of centers of described connecting bore is perpendicular to the side surface of contiguous block.
6. a kind ofly as claimed in claim 4 for non-metal combustion chamber lifting upset frock, it is characterized in that, described attaching parts comprises two connecting cleats and pipe link; The plank of described each connecting cleat is two-layer; All there is screw at two ends at each connecting cleat, at the middle part of each connecting cleat, have pin-and-hole; All there is pin-and-hole at the two ends of described pipe link; The two ends of described pipe link pack in connecting cleat, and by pin, one end of this pipe link and connecting cleat middle part are linked.
7. a kind of for non-metal combustion chamber lifting upset frock as claimed in claim 4, it is characterized in that, when each attaching parts is connected with each steel rope, the two ends of steel cable are tied respectively and encircled and pack between the two-layer plank of described connecting cleat upper end, bolt is packed into the screw of this end connecting cleat and tightens up; The upper end knot ring of two steel ropes is packed between the two-layer plank of connecting cleat lower end, bolt is packed into the screw of this end connecting cleat and tightens up.
CN201320588653.7U 2013-09-22 2013-09-22 Lifting turnover tool for nonmetallic combustor Expired - Fee Related CN203513077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320588653.7U CN203513077U (en) 2013-09-22 2013-09-22 Lifting turnover tool for nonmetallic combustor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320588653.7U CN203513077U (en) 2013-09-22 2013-09-22 Lifting turnover tool for nonmetallic combustor

Publications (1)

Publication Number Publication Date
CN203513077U true CN203513077U (en) 2014-04-02

Family

ID=50372036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320588653.7U Expired - Fee Related CN203513077U (en) 2013-09-22 2013-09-22 Lifting turnover tool for nonmetallic combustor

Country Status (1)

Country Link
CN (1) CN203513077U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105384050A (en) * 2015-11-30 2016-03-09 西安航天动力机械厂 Overturning device for large metal shell
CN105417373A (en) * 2015-11-23 2016-03-23 西安航天化学动力厂 Auxiliary overturning device for small solid rocket engine
CN106429827A (en) * 2016-11-23 2017-02-22 沈阳黎明航空发动机(集团)有限责任公司 Rotor overturning and hoisting device
CN106429789A (en) * 2016-12-15 2017-02-22 南通华夏飞机工程技术股份有限公司 Lifting sling for engine beam
CN106644488A (en) * 2016-09-20 2017-05-10 天津航天瑞莱科技有限公司 Large rocket engine and support integral overturn fixture
CN107188020A (en) * 2017-05-18 2017-09-22 四川森洁燃气设备有限公司 Based on carrying efficient gas pipeline Lift-on/Lift-off System
CN108069333A (en) * 2017-12-11 2018-05-25 中国航发沈阳发动机研究所 Aero-engine spray pipe lifting device
CN109552981A (en) * 2017-09-25 2019-04-02 中石化重型起重运输工程有限责任公司 The hanging method and system of thin-walled tower class equipment
CN112573358A (en) * 2020-12-21 2021-03-30 西安航天动力机械有限公司 Device for vertically lifting slender thin-wall metal shell

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417373A (en) * 2015-11-23 2016-03-23 西安航天化学动力厂 Auxiliary overturning device for small solid rocket engine
CN105384050A (en) * 2015-11-30 2016-03-09 西安航天动力机械厂 Overturning device for large metal shell
CN105384050B (en) * 2015-11-30 2017-03-29 西安航天动力机械厂 It is a kind of to be used for band large-scale metal housing turning device
CN106644488A (en) * 2016-09-20 2017-05-10 天津航天瑞莱科技有限公司 Large rocket engine and support integral overturn fixture
CN106644488B (en) * 2016-09-20 2020-03-10 天津航天瑞莱科技有限公司 Large rocket engine and support integral overturning clamp
CN106429827A (en) * 2016-11-23 2017-02-22 沈阳黎明航空发动机(集团)有限责任公司 Rotor overturning and hoisting device
CN106429789A (en) * 2016-12-15 2017-02-22 南通华夏飞机工程技术股份有限公司 Lifting sling for engine beam
CN107188020A (en) * 2017-05-18 2017-09-22 四川森洁燃气设备有限公司 Based on carrying efficient gas pipeline Lift-on/Lift-off System
CN109552981A (en) * 2017-09-25 2019-04-02 中石化重型起重运输工程有限责任公司 The hanging method and system of thin-walled tower class equipment
CN108069333A (en) * 2017-12-11 2018-05-25 中国航发沈阳发动机研究所 Aero-engine spray pipe lifting device
CN112573358A (en) * 2020-12-21 2021-03-30 西安航天动力机械有限公司 Device for vertically lifting slender thin-wall metal shell

Similar Documents

Publication Publication Date Title
CN203513077U (en) Lifting turnover tool for nonmetallic combustor
CN102358563B (en) Sling
CN203428736U (en) Electrode hoisting fixture of electric melting furnace
CN201825640U (en) Iron hoop device
CN203095401U (en) Clasp type rolling-over hoisting tail lug fixture
CN201047059Y (en) Suspension structure of rope-suspension bridge and rope clip thereof
CN203545473U (en) Brick clamping lifting tool of truck with crane
CN201180371Y (en) Steel pipe fast chucking buckle
CN202558461U (en) Double-beam crane hook anti-off device
CN105347184A (en) Clamp for hoisting internal tooth shaft sleeve in cog-wheel coupler
CN203006739U (en) Tire overturning rigging
CN105347185A (en) Clamp for hoisting outer gear shaft sleeve in gear-type coupling
CN202744187U (en) Lifting hook for lifting vehicle wheel
CN204922310U (en) Quick rotation type rubber tube checkpost
CN205239847U (en) Lever ship dress car fastener
CN205200931U (en) Thin wall major diameter tower drum festival strutting arrangement
CN203754214U (en) Horizontal fitting-hoisting device for shaft coupling
CN105515303A (en) Stator winding hoisting device
CN203545456U (en) Movable elevator
CN202116190U (en) Hoisting tool of oversized casting
CN210366603U (en) Diesel engine frame monolithic upset auxiliary fixtures and turning device
CN204454240U (en) A kind of hanger structure for aluminum alloy ring lifting
CN204125012U (en) A kind of fork truck mounting hanger
CN203486771U (en) Rolling-over and hanging clamp of steel structure
CN205855783U (en) A kind of coil of strip special hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20190922