CN203498856U - Whole slab foundation of power transmission tower - Google Patents

Whole slab foundation of power transmission tower Download PDF

Info

Publication number
CN203498856U
CN203498856U CN201320595362.0U CN201320595362U CN203498856U CN 203498856 U CN203498856 U CN 203498856U CN 201320595362 U CN201320595362 U CN 201320595362U CN 203498856 U CN203498856 U CN 203498856U
Authority
CN
China
Prior art keywords
power transmission
bottom plate
transmission tower
foundation
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320595362.0U
Other languages
Chinese (zh)
Inventor
沈培锋
陈楷
龙禹
漆炜之
王展
刘春江
王迎春
谢恺
谈磊
朱轶
龙海波
赵建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co, Jiangsu Electric Power Design Institute filed Critical State Grid Corp of China SGCC
Priority to CN201320595362.0U priority Critical patent/CN203498856U/en
Application granted granted Critical
Publication of CN203498856U publication Critical patent/CN203498856U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a whole slab foundation of a power transmission tower. The whole slab foundation of the power transmission tower is characterized in that the whole slab foundation comprises a bottom plate and four uprights evenly distributed on the bottom plate and penetrating through the bottom plate, the four uprights and the bottom plate are integrally formed in a cast mode, multiple transverse bottom plate main ribs and multiple longitudinal bottom plate hooping ribs are arranged on the bottom plate, each upright is provided with multiple longitudinal upright main ribs and multiple transverse upright hooping ribs, and the top of each upright is provided with foundation bolts used for fixing a device. According to the whole slab foundation of the power transmission tower, the four uprights are arranged on the bottom plate and each upright is provided with the foundation bolts so that four devices can be fixed simultaneously, four portions of one device can be fixed to the foundation bolts as well, force can be received in a more balanced mode, the settling volume can be small and even, the capacity of adjustment of differential settlement of the foundation can be strong, and stability can be higher. The main ribs and the corresponding hooping ribs are arranged on the bottom plate and the uprights at the same time, so that the anti-shearing performance of the whole slab foundation of the power transmission tower is enhanced.

Description

The whole slab foundation of power transmission tower
Technical field
The utility model relates to a kind of basis, relates in particular to the whole slab foundation of a kind of power transmission tower.
Background technology
Basis is the supporting member that construction bottom contacts with ground, and its effect is that the load on building top is passed to ground, is the important component part of house, bridge, harbour and other structure.Power transmission tower is the tall and slender structure that a kind of engineering quantity is huge and very important.As the electric power facility of important lifeline engineering, power transmission tower is to be transferred the load in ground and gone by basis, and no matter which partly goes wrong or destroys ground or basis, all will top power transmission tower be made a very bad impression and even be caused a serious accident.Complexity due to foundation condition, the particularity of the physico-mechanical properties of soil, people are also exploring and are going deep into its understanding so far, therefore, the design on basis occupies very consequence in super-pressure Design Transmission Line, and the selection of basic pattern is to affect one of Engineering Overall cost principal element.The selection of basis pattern, should be determined in conjunction with each section of landform, hydrogeological situation, execution conditions and power transmission tower pattern, and should, meeting under the prerequisite of rules, standard, be reduced as much as possible construction costs.
Utility model content
The purpose of this utility model is to provide a kind of power transmission tower whole slab foundation, foundation structure is succinct, save material, easy construction, settling amount is little and even, shear behavior good.
For realizing above-mentioned technical purpose, reach above-mentioned technique effect, the utility model is achieved through the following technical solutions: the whole slab foundation of power transmission tower, it is characterized in that, comprise a base plate, be evenly distributed on base plate and run through four columns of base plate, described four columns and base plate are one cast moldings, on described base plate, be provided with some the main muscle of transverse bottom plate and some longitudinal base plate stirrups, on described each column, be provided with some the main muscle of longitudinal column and some transverse upright stirrups, described each column top is provided with the stone bolt of fixed equipment.
Four columns are set on base plate, on each column, be equipped with stone bolt, can fix four equipment simultaneously, also can be by four partial fixings of an equipment on stone bolt, make stressed more balancedly, settling amount is little and even, the ability of adjusting uneven settlement of foundation is more intense, stability is higher, by corresponding main muscle and stirrup are set on base plate and column simultaneously, has strengthened the shear behavior of the whole slab foundation of power transmission tower.
Further, to be positioned at the height of base plate two side portions identical for each column.
Further, the thickness of described base plate be column height 1/5th to 1/3rd between.
The beneficial effects of the utility model are: the whole slab foundation of power transmission tower can be fixed four equipment simultaneously, also can be by four partial fixings of an equipment on stone bolt, make stressed more balanced, settling amount is little and even, the ability of adjusting uneven settlement of foundation is more intense, stability is higher, by corresponding main muscle and stirrup are set on base plate and column simultaneously, has strengthened the shear behavior of the whole slab foundation of power transmission tower.
Accompanying drawing explanation
Fig. 1 is the structural representation of the whole slab foundation of the utility model power transmission tower;
Fig. 2 is the sectional view of the whole slab foundation of the utility model power transmission tower;
Fig. 3 is the top view of the whole slab foundation of the utility model power transmission tower;
The mark implication of accompanying drawing is as follows:
1: base plate; 2: column; 3: the main muscle of column; 4: column stirrup; 5: ground; 6: stone bolt; 7: the main muscle of base plate; 8: base plate stirrup.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment, technical solutions of the utility model are described in further detail, so that those skilled in the art can better understand the utility model being implemented, but illustrated embodiment is not as to restriction of the present utility model.
Fig. 1 is the overall structure figure of the whole slab foundation of power transmission tower, it comprises a base plate 1, be evenly distributed on base plate 1 and run through four columns 2 of base plate 1, wherein four columns 2 and base plate 1 are one cast moldings, the height that preferred each column 2 is positioned at base plate 1 two side portions is identical, be that each column 2 is that horizontal direction about base plate 1 is symmetrical in short transverse, prevent the whole discontinuity of column 2, affect the application life of the whole slab foundation of power transmission tower.Preferably the thickness of base plate 1 be column 2 height 1/5th to 1/3rd between, reach whole performance and the balance of structure, save material.
Fig. 2 is the sectional view of Fig. 1, and each column 2 tops are provided with the stone bolt 6 of fixed equipment, is provided with some the main muscle 3 of longitudinal column and some transverse upright stirrups 4 on each column 2.Corresponding, on base plate 1, be provided with some the main muscle 7 of transverse bottom plate and some longitudinal base plate stirrups 8, as shown in Figure 3, succinct for picture, has only shown the main muscle 7 of part base plate and base plate stirrup 8.During use, the whole slab foundation of whole power transmission tower is except the top of column 2, all be arranged in the foundation ditch under ground 5, only the top of column 2 elevates above the soil 5, four columns 2 are set on base plate 1, on each column 2, be equipped with stone bolt 6, can fix four equipment simultaneously, also can be by four partial fixings of an equipment on stone bolt 6, make stressed more balanced, settling amount is little and even, the ability of adjusting uneven settlement of foundation is more intense, stability is higher, by corresponding main muscle and stirrup are set on base plate 1 and column 2 simultaneously, strengthened the shear behavior of the whole slab foundation of power transmission tower.
These are only preferred embodiment of the present utility model; not thereby limit the scope of the claims of the present utility model; every equivalent structure or conversion of equivalent flow process that utilizes the utility model manual and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.

Claims (3)

1. the whole slab foundation of power transmission tower, it is characterized in that, comprise a base plate, be evenly distributed on base plate and run through four columns of base plate, described four columns and base plate are one cast moldings, on described base plate, be provided with some the main muscle of transverse bottom plate and some longitudinal base plate stirrups, be provided with some the main muscle of longitudinal column and some transverse upright stirrups on described each column, described each column top is provided with the stone bolt of fixed equipment.
2. the whole slab foundation of power transmission tower according to claim 1, is characterized in that, the height that each column is positioned at base plate two side portions is identical.
3. the whole slab foundation of power transmission tower according to claim 1, is characterized in that, the thickness of described base plate be column height 1/5th to 1/3rd between.
CN201320595362.0U 2013-09-26 2013-09-26 Whole slab foundation of power transmission tower Expired - Fee Related CN203498856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320595362.0U CN203498856U (en) 2013-09-26 2013-09-26 Whole slab foundation of power transmission tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320595362.0U CN203498856U (en) 2013-09-26 2013-09-26 Whole slab foundation of power transmission tower

Publications (1)

Publication Number Publication Date
CN203498856U true CN203498856U (en) 2014-03-26

Family

ID=50329848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320595362.0U Expired - Fee Related CN203498856U (en) 2013-09-26 2013-09-26 Whole slab foundation of power transmission tower

Country Status (1)

Country Link
CN (1) CN203498856U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469809A (en) * 2013-09-26 2013-12-25 国家电网公司 Complete board type foundation of power transmission tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469809A (en) * 2013-09-26 2013-12-25 国家电网公司 Complete board type foundation of power transmission tower

Similar Documents

Publication Publication Date Title
CN105401592B (en) A kind of shock insulation-vibration-free tables and its construction method
CN202138969U (en) Tower crane wall-attaching device used in cast-in-place concrete structure
CN203498856U (en) Whole slab foundation of power transmission tower
CN203768788U (en) Tool type foundation pit soil conveying trestle bridge
CN201310102Y (en) Static load test conversion beam
CN103469809A (en) Complete board type foundation of power transmission tower
CN103469810A (en) Independent foundation of power transmission tower
CN206784374U (en) A kind of civil construction stake
CN203361183U (en) Power transmission tower foundation
CN202466651U (en) Loading device for axial force test of prestressed pipe pile
CN203239028U (en) Asphalt-sand cushion layer and rubber rod energy dissipation shock reduction building
CN105908770B (en) A kind of novel building shock insulating foundation
CN207633527U (en) A kind of drag-line earthquake isolating equipment
CN205894344U (en) Vibration isolating device
CN213978546U (en) Assembled bridge abutment structure and assembled bridge abutment using same
CN205975370U (en) Overline bridge handling frame crosses river
CN201106231Y (en) Shock insulation apparatus for steel tube concrete column
CN203498857U (en) Reverse-wing-shaped foundation of power transmission tower
CN208792356U (en) Pile group foundation with star-shaped through holes
CN103469811B (en) Inverted wing-shaped foundation of power transmission tower
CN202108260U (en) Guardrail used in construction engineering
CN206787785U (en) A kind of isolation structure simulating vibration table tests protection device
CN106731089A (en) A kind of supporting construction of sewage filter net
CN205576729U (en) Bridge is with subtracting isolation bearing
CN206279844U (en) A kind of antidetonation formed steel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Patentee after: State Grid Corporation of China

Patentee after: Nanjing Power Supply Co., Jiangsu Prov. Power Co.

Patentee after: Jiangsu Electric Power Company

Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Address before: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Patentee before: State Grid Corporation of China

Patentee before: Nanjing Power Supply Co., Jiangsu Prov. Power Co.

Patentee before: Jiangsu Electric Power Company

Patentee before: Jiangsu Electric Power Designing Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326

Termination date: 20200926