CN206784374U - A kind of civil construction stake - Google Patents
A kind of civil construction stake Download PDFInfo
- Publication number
- CN206784374U CN206784374U CN201720443666.3U CN201720443666U CN206784374U CN 206784374 U CN206784374 U CN 206784374U CN 201720443666 U CN201720443666 U CN 201720443666U CN 206784374 U CN206784374 U CN 206784374U
- Authority
- CN
- China
- Prior art keywords
- pile body
- plate
- pile
- steel
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a kind of civil construction stake, including pile body, the pile body two bottom sides are provided with two symmetrical pile crowns, two symmetrical chutes are offered in the pile body internal side wall, the sliding block being slidably connected therewith is provided with the chute, it is connected between two sliding blocks by connecting plate, the connecting plate both ends are equipped with briquetting, the briquetting both sides are provided with side plate, the side plate opposite face is upward inclined plane, the side wall of the pile crown is provided with multiple side openings, side stake is equipped with each side opening, the pile body inner bottom and top are respectively equipped with the first steel plate and the second steel plate, more steel columns are provided between first steel plate and the second steel plate, pile body top center is provided with concrete pouring gate, multiple spout holes are offered in the pile body side wall.The utility model is simple in construction, easy to operate, can effectively reinforce whole building stake, and the intensity practicality for effectively improving building stake is stronger.
Description
Technical field
It the utility model is related to a kind of building stake, specifically a kind of civil construction stake.
Background technology
It is well known that building stake is a kind of building appliance, it is mainly used in squeezing into soil and carries out its upper building support
Base apparatus, therefore be widely used in building engineering field.Whether building stake can keep stablizing serious shadow in soil depths
The safety of this building is rung, and the stability for building stake has an effect on the development in city later stage, such as builds subway, if building
Stake, which occurs to loosen, to directly affect the life security of people.At present in construction site construction of buildings, it is required on soil
Piling however existing building pile foundation sheet is added the cylindrical body of concrete by steel wire, it is not firm enough.
Utility model content
The purpose of this utility model is to provide a kind of civil construction stake, asked with solve to propose in above-mentioned background technology
Topic.
To achieve the above object, the utility model provides following technical scheme:
A kind of civil construction stake, including pile body, the pile body two bottom sides are provided with two symmetrical pile crowns, two stakes
The inner chamber of head offers two symmetrical chutes, set in the chute with being connected inside pile body in the pile body internal side wall
The sliding block being slidably connected therewith is equipped with, is connected between two sliding blocks by connecting plate, the connecting plate both ends are equipped with
Briquetting, and two briquettings are respectively protruding into inside pile crown, the two sides of the briquetting are downward inclined plane, and the briquetting both sides are set
There is side plate, and side plate bottom is slidably connected with pile crown cavity bottom, the side plate opposite face is upward inclined plane, the pile crown
Side wall be provided with multiple side openings, be equipped with side stake in each side opening, described side stake one end with positioned at the side of the same side
Plate is connected, and connecting plate upper end both sides are equipped with two depression bars, and each depression bar upper end is through pile body top with setting
Pressing plate above pile body is connected, and the pile body inner bottom and top are respectively equipped with the first steel plate and the second steel plate, described
More steel columns are provided between first steel plate and the second steel plate, and steel column both ends are connected with the first steel plate and the second Interal fixation, institute
State pile body top center and be provided with concrete pouring gate, multiple spout holes are offered in the pile body side wall.
As further program of the utility model:The briquetting bottom is provided with guide pin, and the guide pin bottom is stretched into
It is arranged in the pilot hole of pile crown bottom.
As the utility model further scheme:Beam is provided between second steel plate and pile body, it is described to subtract
Shake pad is made by antiseptic rubber material.
As the utility model further scheme:The pile body both sides are provided with baffle plate, and being provided between two baffle plates will
The steel bar that two baffle plates are fixedly connected.
As the utility model further scheme:Each steel column upper and lower side is symmetrically arranged with two semicircle cones, and
It is connected between steel column by more steel bars.
Compared with prior art, the beneficial effects of the utility model are:Briquetting squeeze side stake is driven by the setting of pressing plate
Penetrate in soil, positioning and fixation can be so played to pile body, add the wedging function of pile body horizontal direction, load
Ability to bear is strengthened, and pile body is more stable, is connected by the setting pile body upper and lower ends of steel column, so as to which pile body is being driven piles
Shi Gengjia is stable, and the setting of overfall allows concrete to flow to pile body and soil gap so that whole building stake is more firm
Gu.The utility model is simple in construction, easy to operate, can effectively reinforce whole building stake, and the intensity for effectively improving building stake is real
It is stronger with property.
Brief description of the drawings
Fig. 1 is the structural representation of civil construction stake.
Wherein:Pile body 1, pile crown 2, the first steel plate 3, the second steel plate 4, steel column 5, beam 6, pressing plate 7, depression bar 8, connecting plate
9th, sliding block 10, chute 11, column 12, side plate 13, side opening 14, side stake 15, pilot hole 16, guide pin 17, baffle plate 18, steel bar 19,
Semicircle cone 20, concrete pouring gate 21, spout hole 22.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, in the utility model embodiment, a kind of civil construction stake, including pile body 1, the bottom two of pile body 1
Side is provided with two symmetrical pile crowns 2, and the inner chamber of two pile crowns 2 inside pile body 1 with being connected, the internal side wall of pile body 1
On offer two symmetrical chutes 11, be provided with the sliding block 10 being slidably connected therewith, two sliding blocks in the chute 11
It is connected between 10 by connecting plate 9, the both ends of connecting plate 9 are equipped with briquetting 12, and two briquettings 12 are respectively protruding into pile crown
Inside 2, the two sides of the briquetting 12 are downward inclined plane, and the both sides of briquetting 12 are provided with side plate 13, and the bottom of side plate 13
It is slidably connected with the cavity bottom of pile crown 2, the opposite face of side plate 13 is upward inclined plane, and the side wall of the pile crown 2 is provided with
Multiple side openings 14, side stake 15 each is equipped with the side opening 14, positioned at side of the one end of side stake 15 of the same side with phase homonymy
Plate 13 is connected, and the upper end both sides of connecting plate 9 are equipped with two depression bars 8, and each upper end of depression bar 8 passes through the top of pile body 1
It is connected with the pressing plate 7 for being arranged on the top of pile body 1, the bottom of briquetting 12 is provided with guide pin 17, and the bottom of guide pin 17 is stretched
In the pilot hole 16 for entering to be arranged on the bottom of pile crown 2, guide effect is played when moving down to briquetting 12, inside the pile body 1
Bottom and top are respectively equipped with the first steel plate 3 and the second steel plate 4, and more steel are provided between the steel plate 4 of the first steel plate 3 and second
Post 5, and the both ends of steel column 5 are fixedly connected with the first steel plate 3 and the second steel plate 4, each upper and lower side of steel column 5 is symmetrically arranged with two and half
Cone 20, it is connected by more steel bars between the steel column 5, beam is provided between second steel plate 4 and pile body 1
6, the beam 6 is made by antiseptic rubber material, and the setting of beam 6 in piling, can effectively mitigate the shake of pile body 1
Dynamic, the top center of pile body 1 is provided with concrete pouring gate 21, can be by concreting in pile body 1, the side of pile body 1
Multiple spout holes 22 are offered on wall, to prevent pile body 1 from sinking, are provided with baffle plate 18 in the both sides of pile body 1, two baffle plates 18 it
Between be provided with the steel bar 19 that is fixedly connected with two baffle plates 18.
Operation principle of the present utility model is:Apply downward power to pressing plate 7 first so that pressing plate 7 is by depression bar 5 to even
Fishplate bar 9 pushes down on, and connecting plate 9 moves down along chute 11, so as to promote the briquetting 12 at the both ends of connecting plate 9, the both sides of briquetting 12
Face extrudes side plate 13 and moved to the two side of pile crown 2, is penetrated so that side stake 15 is moved diagonally downward along side opening 14 in soil, right
Pile body 1 plays positioning and fixation, then pours into concrete in pile body 1 from concrete pouring gate 21, concrete fills up stake
Inside body 1, gap between pile body 1 and soil is flowed to by overfall 22 so that whole building stake is firmer, and steel column 5 is set
Put so that the upper and lower ends of pile body 1 connect so that pile body 1 is more stable.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (5)
1. a kind of civil construction stake, including pile body (1), pile body (1) two bottom sides are provided with two symmetrical pile crowns (2), two
The inner chamber of the individual pile crown (2) inside pile body (1) with being connected, it is characterised in that is offered in pile body (1) internal side wall
Two symmetrical chutes (11), the chute (11) is interior to be provided with the sliding block (10) being slidably connected therewith, two sliding blocks
(10) it is connected between by connecting plate (9), connecting plate (9) both ends are equipped with briquetting (12), and two briquettings (12) point
It is internal that pile crown (2) is not stretched into, and the two sides of the briquetting (12) are downward inclined plane, and briquetting (12) both sides are provided with side plate
(13), and side plate (13) bottom is slidably connected with pile crown (2) cavity bottom, and side plate (13) opposite face is upward inclination
Face, the side wall of the pile crown (2) are provided with multiple side openings (14), and side stake (15) is equipped with each side opening (14), described
Side stake (15) one end is connected with the side plate (13) positioned at the same side, and connecting plate (9) the upper end both sides are equipped with two pressures
Bar (8), each depression bar (8) upper end are connected through pile body (1) top with the pressing plate (7) being arranged on above pile body (1), institute
State pile body (1) inner bottom and top is respectively equipped with the first steel plate (3) and the second steel plate (4), first steel plate (3) and second
More steel columns (5) are provided between steel plate (4), and steel column (5) both ends are fixedly connected with the first steel plate (3) and the second steel plate (4), institute
State pile body (1) top center and be provided with concrete pouring gate (21), multiple spout holes (22) are offered in pile body (1) side wall.
2. civil construction stake according to claim 1, it is characterised in that briquetting (12) bottom is provided with guide pin
(17), guide pin (17) bottom, which is stretched into, is arranged in the pilot hole (16) of pile crown (2) bottom.
3. civil construction stake according to claim 1, it is characterised in that set between second steel plate (4) and pile body (1)
There is beam (6), the beam (6) is made by antiseptic rubber material.
4. civil construction stake according to claim 1, it is characterised in that pile body (1) both sides are provided with baffle plate (18), and two
The steel bar (19) for being fixedly connected with two baffle plates (18) is provided between individual baffle plate (18).
5. civil construction stake according to claim 1, it is characterised in that steel column (5) upper and lower side is symmetrically arranged with two
Individual semicircle cone (20), and be connected between steel column (5) by more steel bars.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720443666.3U CN206784374U (en) | 2017-04-25 | 2017-04-25 | A kind of civil construction stake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720443666.3U CN206784374U (en) | 2017-04-25 | 2017-04-25 | A kind of civil construction stake |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206784374U true CN206784374U (en) | 2017-12-22 |
Family
ID=60708709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720443666.3U Expired - Fee Related CN206784374U (en) | 2017-04-25 | 2017-04-25 | A kind of civil construction stake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206784374U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108223460A (en) * | 2018-01-09 | 2018-06-29 | 江苏绩优机电科技有限公司 | Submerged axial-flow propeller pump |
CN111458062A (en) * | 2020-04-10 | 2020-07-28 | 水利部交通运输部国家能源局南京水利科学研究院 | Instrument for automatically measuring three-dimensional frost heaving force of channel and measuring and mounting method thereof |
CN114809055A (en) * | 2022-05-25 | 2022-07-29 | 湖南梅溪湖建设有限公司 | Prefabricated spliced open caisson structure and construction method |
-
2017
- 2017-04-25 CN CN201720443666.3U patent/CN206784374U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108223460A (en) * | 2018-01-09 | 2018-06-29 | 江苏绩优机电科技有限公司 | Submerged axial-flow propeller pump |
CN111458062A (en) * | 2020-04-10 | 2020-07-28 | 水利部交通运输部国家能源局南京水利科学研究院 | Instrument for automatically measuring three-dimensional frost heaving force of channel and measuring and mounting method thereof |
CN111458062B (en) * | 2020-04-10 | 2022-03-04 | 水利部交通运输部国家能源局南京水利科学研究院 | Instrument for automatically measuring three-dimensional frost heaving force of channel and measuring and mounting method thereof |
CN114809055A (en) * | 2022-05-25 | 2022-07-29 | 湖南梅溪湖建设有限公司 | Prefabricated spliced open caisson structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206784374U (en) | A kind of civil construction stake | |
CN205530247U (en) | Prebored hole bag slip casting stock structure | |
CN205134327U (en) | Concrete diclinic props row -pile support system | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN206829148U (en) | A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure | |
CN204875495U (en) | No abutment body seat formula abutment | |
CN206667240U (en) | A kind of civil construction stake | |
CN203361182U (en) | Unequal-length bottom-expanded rock anchor pile of power transmission pole tower | |
CN207193967U (en) | A kind of prestressed concrete pipe pile end plate | |
CN207121940U (en) | A kind of rectifying of leaned building structure for stake end sandy soil supporting course | |
CN105113626B (en) | Cast-in-place post precast beam construction method | |
CN206655209U (en) | A kind of construction assistance platform of rivers pile foundation | |
CN204645025U (en) | A kind of device utilizing soil bearing capacity between grout pile | |
CN207047868U (en) | A kind of pattern foundation pit supporting structure barricade | |
CN207512774U (en) | Adjacent foundation pits connecting structure of bottom plate | |
CN203256771U (en) | Semi-gravity type column and board combined retaining wall structure | |
CN207959245U (en) | A kind of load-bearing pile foundation structure | |
CN208379606U (en) | Half gravity dam formula foundation pit enclosure structure | |
CN106522210A (en) | Pile bottom anchoring structure for bare rock geological stressed steel pipe pile | |
CN103866686A (en) | Key-joint bearing platform and landscape pier comprising same and being used for karst geology | |
CN203755140U (en) | Key joint bearing platform and landscape bridge pier used for karst geology and including the bearing platform | |
CN202247881U (en) | Static pressure pile structure for anchor group | |
CN207295706U (en) | A kind of Pile feeder suitable for engineering method pile-type steel | |
CN110778111A (en) | Fixed template structure of pouring frame for civil construction engineering construction | |
CN110387869A (en) | A kind of high plasticity index Soft Soil Ground And Foundation processing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20180425 |