CN203498741U - Bridge-building-integrated T-shaped station bridge structure - Google Patents
Bridge-building-integrated T-shaped station bridge structure Download PDFInfo
- Publication number
- CN203498741U CN203498741U CN201320409371.6U CN201320409371U CN203498741U CN 203498741 U CN203498741 U CN 203498741U CN 201320409371 U CN201320409371 U CN 201320409371U CN 203498741 U CN203498741 U CN 203498741U
- Authority
- CN
- China
- Prior art keywords
- bridge
- unification
- top board
- coxostermum
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a bridge-building-integrated T-shaped station bridge structure, which comprises a bridge pier, a canopy, track beams and station beams, wherein the station beams are arranged on both sides of the track beams; each station beam further comprises a top plate, and an inner side web plate, a middle web plate and an outer side web plate arranged under the top plate along a track. The bridge-building-integrated T-shaped station bridge structure is characterized in that the top plates over the outer side web plates are provided with canopy columns. The T-shaped station bridge structure disclosed by the utility model meets the erecting construction requirement of the canopy columns, can bear load effects of structural dead weight, wind, temperature, earthquake and the like transmitted down by the canopy columns, and meets the requirement of stress.
Description
Technical field
The utility model relates to bridge construction technical field, is specifically related to the T shape platform bridge construction that a kind of bridge is built unification.
Background technology
It is the new structure system occurring in railway construction that bridge is built unification station.It is neither single building structure, and bridge construction that neither be single, but the structural system combining is built in a kind of bridge and room is station building structure and the Station Bridge girder construction common stressed a kind of station structure pattern that combines.Bridge is built in combined structure system, and platform beams must offer building structure awning and effectively support.
Conventional T beam refers to that cross-sectional form is T-shaped beam, and both sides are chosen part and are called the edge of a wing, and intermediate portion is called web.This structure is the equal of in rectangular beam, the inoperative concrete in tension zone of flexural strength to be cut out to rear formation.Outside identical with original rectangle flexural strength, but both can save concrete, alleviate again the deadweight of member, improve span ability.But conventional T beam be take and born deadweight, two perseverances, vehicular load as main, and its load form all can be considered as the evenly distributed load in certain limit, therefore the web of general T-shaped beam section and edge of a wing size are all less.
Bridge is built vertically on the overhead platform beams of combined structure has an awning post, and platform girder construction transmits by bearing by awning post the loads such as dead load, wind, temperature and geological process that get off, thereby produces huge moment of flexure, shear and torsion.Existing structure cannot be born the internal force (moment of flexure, shearing, moment of torsion) of awning, the outer frange plate of conventional T beam is thinner, and awning post suspension column size is generally larger, also can not meet the structure requirement of pre-buried awning suspension column, therefore existing conventional T beam cannot meet the column requirement of " taking root ".
Summary of the invention
The purpose of this utility model is for the deficiencies in the prior art, the T shape platform bridge construction that has been to provide a kind of bridge to build unification, and this structure meets the column requirement that bridge is built unification, guarantees the reliable form of structure of structural safety simultaneously.
For solving the problems of the technologies described above, the designed a kind of bridge of the utility model is built the T shape platform bridge construction of unification, comprises the platform beams of bridge pier, awning, rail beam and rail beam both sides; Each platform beams also comprise top board and top board under direction along ng a path interior coxostermum, middle pectoral plate and outer coxostermum are set; On top board directly over described outer coxostermum, be provided with awning post.
Further, between described outer coxostermum and top board, be provided with special-shaped piece, the footnote of described awning post is by inserting on top board in special-shaped piece.
Again further, between described interior coxostermum, middle pectoral plate and outer coxostermum, direction along ng a path is provided with diaphragm.
Again further, the spacing of described awning post direction along ng a path on top board is 10~15m.
Again further, the spacing of described diaphragm is 10~15m, and thickness is 0.5~1.0m.
Again further, described in, being provided with the thickness at web position outside special-shaped piece is 0.6~1.8m.
Again further, the thickness of described special-shaped piece is 1.0~1.8m.
The utility model has the advantage of:
1, T-shaped girder construction of the present utility model meets the structure requirement set up awning post, and can bear by awning post and transmit the load effects such as dead load, wind, temperature and earthquake that get off, meets stressed needs.
2, platform beams of the present utility model outside is set up awning post and will be formed larger moment of torsion to platform beams structure, by thickening dividing plate is set, form good torsional property, makes it have more advantage on stressed.
3, of the present utility model by special-shaped piece is set, met the structure requirement of awning suspension column, make suspension column fixing on platform beams reliably.
Accompanying drawing explanation
Fig. 1 is the T shape platform bridge construction schematic diagram that the utility model bridge is built unification;
Fig. 2 is the plan view of platform beams in figure;
Fig. 3 is the cross-sectional view of platform beams in figure;
In figure, 1. bridge pier, 2. rail beam, 3. platform beams, 4. top board, 5. interior coxostermum, 6. middle pectoral plate, 7. outer coxostermum, 8. special-shaped piece, 9. awning post, 10. footnote, 11. diaphragms, 12. awnings.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail, so that those skilled in the art understand.
As shown in the figure: a kind of bridge is built the T shape platform bridge construction of unification, comprise the platform beams 3 of bridge pier 1, awning 12, rail beam 2 and rail beam 2 both sides; The span of platform beams 3 is 32.7m, and the spacing of platform beams bridge pier is 32.7m, each platform beams 3 also comprise top board 4 and top board 4 under direction along ng a path interior coxostermum 5, middle pectoral plate 6 and outer coxostermum 7 are set; On top board 4 directly over outer coxostermum 7, be provided with awning post 9.Between outer coxostermum 7 and top board 4, be provided with special-shaped piece 8, the footnote 10 of described awning post 9 is by inserting on top board 4 in special-shaped piece 8.
Between interior coxostermum 5, middle pectoral plate 6 and outer coxostermum 7, direction along ng a path is provided with diaphragm 11, and the spacing of awning post 9 direction along ng a path on top board 4 is 10~15m.
The spacing of diaphragm is 10~15m, and thickness is 0.5~1.0m.The thickness that is provided with the outer coxostermum of special-shaped piece 87 positions is 0.6~1.8m.The thickness of special-shaped piece 8 is 1.0~1.8m.
In the present embodiment, execution conditions will be according to self actual conditions, and the feature of analysis rationally adopts, to give full play to the superiority of this structure.
Although above-described embodiment has been made detailed description to the utility model; but it is only the utility model part embodiment; rather than whole embodiment; people can also obtain other embodiment according to the present embodiment under without creative prerequisite, and these embodiment belong to the utility model protection domain.
Claims (7)
1. bridge is built a T shape platform bridge construction for unification, comprises the platform beams (3) of bridge pier (1), awning (12), rail beam (2) and rail beam (2) both sides; Each platform beams (3) also comprise top board (4) and top board (4) under direction along ng a path interior coxostermum (5), middle pectoral plate (6) and outer coxostermum (7) are set; It is characterized in that: on the top board (4) directly over described outer coxostermum (7), be provided with awning post (9).
2. bridge according to claim 1 is built the T shape platform bridge construction of unification, it is characterized in that: between described outer coxostermum (7) and top board (4), be provided with special-shaped piece (8), the footnote (10) of described awning post (9) inserts in special-shaped piece (8) by top board (4) is upper.
3. bridge according to claim 1 is built the T shape platform bridge construction of unification, it is characterized in that: between described interior coxostermum (5), middle pectoral plate (6) and outer coxostermum (7), direction along ng a path is provided with diaphragm (11).
4. bridge according to claim 1 is built the T shape platform bridge construction of unification, it is characterized in that: described awning post (9) is 10 ~ 15m in the spacing of the upper direction along ng a path of top board (4).
5. bridge according to claim 3 is built the T shape platform bridge construction of unification, it is characterized in that: the spacing of described diaphragm is 10 ~ 15m, and thickness is 0.5 ~ 1.0m.
6. according to the bridge described in claim 1 or 2 or 3, build the T shape platform bridge construction of unification, it is characterized in that: described in be provided with the outer coxostermum of special-shaped piece (8) (7) position thickness be 0.6 ~ 1.8m.
7. according to the bridge described in claim 1 or 2 or 3, build the T shape platform bridge construction of unification, it is characterized in that: the thickness of described special-shaped piece (8) is 1.0 ~ 1.8m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320409371.6U CN203498741U (en) | 2013-07-10 | 2013-07-10 | Bridge-building-integrated T-shaped station bridge structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320409371.6U CN203498741U (en) | 2013-07-10 | 2013-07-10 | Bridge-building-integrated T-shaped station bridge structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203498741U true CN203498741U (en) | 2014-03-26 |
Family
ID=50329733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320409371.6U Expired - Lifetime CN203498741U (en) | 2013-07-10 | 2013-07-10 | Bridge-building-integrated T-shaped station bridge structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203498741U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104477170A (en) * | 2014-12-19 | 2015-04-01 | 湖北工业大学 | Standard bridge type elevated station |
CN106004885A (en) * | 2016-07-22 | 2016-10-12 | 铁道第三勘察设计院集团有限公司 | Light rail assembled type elevated railway station for high intensity area |
CN106677330A (en) * | 2016-12-16 | 2017-05-17 | 中铁第四勘察设计院集团有限公司 | Underground station structure of beam column hinge system |
CN109778679A (en) * | 2019-02-26 | 2019-05-21 | 中铁第四勘察设计院集团有限公司 | A kind of overhead station structure suitable for straddle-type monorail |
CN111472254A (en) * | 2020-04-29 | 2020-07-31 | 中铁二院工程集团有限责任公司 | Bridge loading station structure of deck type railway steel truss arch bridge |
-
2013
- 2013-07-10 CN CN201320409371.6U patent/CN203498741U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104477170A (en) * | 2014-12-19 | 2015-04-01 | 湖北工业大学 | Standard bridge type elevated station |
CN106004885A (en) * | 2016-07-22 | 2016-10-12 | 铁道第三勘察设计院集团有限公司 | Light rail assembled type elevated railway station for high intensity area |
CN106004885B (en) * | 2016-07-22 | 2018-04-06 | 中国铁路设计集团有限公司 | Light rail assembled overhead station for highly seismic region |
CN106677330A (en) * | 2016-12-16 | 2017-05-17 | 中铁第四勘察设计院集团有限公司 | Underground station structure of beam column hinge system |
CN109778679A (en) * | 2019-02-26 | 2019-05-21 | 中铁第四勘察设计院集团有限公司 | A kind of overhead station structure suitable for straddle-type monorail |
CN111472254A (en) * | 2020-04-29 | 2020-07-31 | 中铁二院工程集团有限责任公司 | Bridge loading station structure of deck type railway steel truss arch bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203498741U (en) | Bridge-building-integrated T-shaped station bridge structure | |
CN103422423B (en) | The quick spelling bridge of sectional type modularization | |
CN101245618A (en) | Two-side-connection combined steel plate shearing force wall | |
CN105544372A (en) | Magnetic levitation encircled track traffic double-line track beam | |
CN101858053A (en) | Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower | |
CN205637214U (en) | Prefabricated assembled concrete column - concrete beam prevents bucking power consumption node entirely | |
CN203320737U (en) | X-type shear wall structure | |
CN203334170U (en) | Platform box girder structure used for erecting canopy columns | |
CN103410082A (en) | Double-layer bridge floor cable-stayed bridge | |
CN203334542U (en) | Floor slab steel truss structure | |
CN210420862U (en) | Stay cable tower end anchoring device | |
KR101198911B1 (en) | Construction technique of concrete box girder and this | |
CN104452568A (en) | Steel plate girder pedestrian overbridge | |
CN110130202A (en) | The flexible system railroad bridge vertically bent and its construction method are stabilized using arch rib | |
CN103603264A (en) | Beam end joint structure for long-span structural railway bridge deck system auxiliary projects | |
CN205276115U (en) | Two line track roof beams of rail formula track traffic are embraced in magnetic suspension | |
CN111827079A (en) | Combined beam bridge with cantilever arms for highway and railway dual-purpose box girders | |
CN205276073U (en) | Two line track roof beams of rail formula track traffic are embraced in magnetic suspension | |
CN201738238U (en) | Cable stayed anchor plate type anchor of cable stayed bridge cable tower | |
CN107386444A (en) | More Pin space trusses transformational structures | |
CN205000463U (en) | Long cantilever disjunctor structure of large -span | |
CN105568789A (en) | Two-line rail girder of maglev rail-holding rail transit | |
CN202730633U (en) | Self-anchored suspension bridge for main cables in parallel spaces of one-column tower | |
CN207452680U (en) | A kind of curve chord steel truss is put more energy into continuous beam | |
CN202644379U (en) | Segment-type modular rapidly-assembled bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140326 |
|
CX01 | Expiry of patent term |