CN203497883U - Safety lifting device convenient to use and used for operators of tower crane - Google Patents

Safety lifting device convenient to use and used for operators of tower crane Download PDF

Info

Publication number
CN203497883U
CN203497883U CN201320647087.2U CN201320647087U CN203497883U CN 203497883 U CN203497883 U CN 203497883U CN 201320647087 U CN201320647087 U CN 201320647087U CN 203497883 U CN203497883 U CN 203497883U
Authority
CN
China
Prior art keywords
hanging basket
tower
winch
safety
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320647087.2U
Other languages
Chinese (zh)
Inventor
赵琰森
张健
张天雨
焦婷婷
刘姝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd filed Critical GANSU CONSTRUCTION INVESTMENT EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201320647087.2U priority Critical patent/CN203497883U/en
Application granted granted Critical
Publication of CN203497883U publication Critical patent/CN203497883U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model belongs to the technical field of lifting devices, and particularly relates to a safety lifting device convenient to use and used for operators of a tower crane. The safety lifting device comprises a tower crane foundation (1), a tower body (2), a lifting unit, a hanging basket device and a safety protection device. The lifting unit is composed of a winch (3), a stroke limiting device (4), a steel wire rope (5) and a guide rail (6), the winch (3) provided with the stroke limiting device (4) is located at the top end of the tower body (2), the steel wire rope (5) is arranged on a roller of the winch (3), and the guide rail (6) is arranged on the inner wall of the tower body (2). The hanging basket device is composed of a hanging basket (7), a remote control device (8) and an inlet (9), a slide rail matched with the guide rail (6) is arranged on the outer side of the hanging basket (7), and the hanging basket (7) is connected with the winch (3) through the steel wire rope (5). The safety lifting device has the advantages that lifting is convenient, operation is safe, work efficiency is high, and cost is low.

Description

Tower-type crane operation personnel are with convenient and safe type jacking system
Technical field
The utility model belongs to jacking system technical field, is specifically related to tower-type crane operation personnel with convenient and safe type jacking system.
Background technology
The working space of tower crane is large, be mainly used in the installation of vertical and horizontal feed and the building element of material in housing construction, because it has played the part of very important role in building operation and code in all in all capital construction, and then make suitable frequent of its use.
Because tower crane volume is tall and big, at present, known driver down from tower crane is all by the cat ladder in the middle of tower machine, to climb driver's cab to operate, and after reaching certain height to floor, is to take after engineering elevator rises to corresponding height by the attached wall of tower machine, to go to driver operation chamber again.Due in climbing process without safety measure, to driver muscle power and caused great pressure mentally, directly caused the rising of potential safety hazard.
Summary of the invention
The purpose of this utility model will provide a kind of lifting convenience, safe in operation, tower-type crane operation personnel jacking system that work efficiency is high, with low cost exactly.
The utility model is achieved through the following technical solutions:
Tower-type crane operation personnel are with convenient and safe type jacking system, comprise foundation for tower crane 1, tower body 2, bont, nacelle device and safety device, it is characterized in that: described tower body 2 is arranged on foundation for tower crane 1, bont is located thereon, nacelle device is located at its inside, and safety device is positioned at foundation for tower crane 1 below.
Described bont is comprised of winch 3, distance caging device 4, steel rope 5 and guide rail 6, and the described winch that is provided with distance caging device 43 is positioned at tower body 2 tops, and steel rope 5 is located on the cylinder of winch 3, and guide rail 6 is located on tower body 2 inwalls.
Described nacelle device is comprised of hanging basket 7, remote control equipment (RCE) 8 and entrance 9, and described hanging basket 7 outsides are provided with the slide rail matching with guide rail 6, and hanging basket 7 is connected with winch 3 by steel rope 5.
Described safety device forms by being positioned at the safety hole 10 of hanging basket 7 belows and being positioned at the elastic protection device 11 in hole 10 safely, and described safety hole 10 sidewalls are for being obliquely installed, and elastic protection device 11 is located at safety and cheats 10 bottoms.
Compared with prior art, the beneficial effects of the utility model are:
1) by the bont being formed by winch 3, distance caging device 4, steel rope 5 and guide rail 6, make the arrival engineering elevator place of overhauling or tower crane operating personal can be convenient and safe, and exempted maintenance or operating personal in the problem of tower body 2 climbings, and work efficiency is high, cost is low.
2) utilize the guide rail 6 being arranged on tower body 2 inwalls and be located at the slide rail matching with guide rail 6 on hanging basket 7, make in the rail groove of guide rail 6, to move all the time in the upper and lower process of hanging basket 7, safety and the traveling comfort of hanging basket 7 operations have been improved, when meeting accident, hanging basket 7, under the effect of the friction force of guide rail 6, can play buffer action.
3) by the safety device being arranged in hanging basket 7 below foundation for tower crane 1, make hanging basket 7 when meeting accident, play the effect of safety precaution, elastic protection device 11 can play buffer action to greatest extent, and the safety control that provides that operating personal maximum in hanging basket 7 seems is provided.
Accompanying drawing explanation
Fig. 1 is integral structure schematic diagram of the present utility model.
In figure: foundation for tower crane 1, tower body 2, winch 3, distance caging device 4, steel rope 5, guide rail 6, hanging basket 7, remote control equipment (RCE) 8, entrance 9, safety hole 10, elastic protection device 11.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further:
Tower-type crane operation personnel, with convenient and safe type jacking system, comprise foundation for tower crane 1, tower body 2, winch 3, distance caging device 4, steel rope 5, guide rail 6, hanging basket 7, remote control equipment (RCE) 8, entrance 9, safety hole 10 and elastic protection device 11.
As shown in Figure 1, wherein tower body 2 is arranged on foundation for tower crane 1, the bont being comprised of winch 3, distance caging device 4, steel rope 5 and guide rail 6 is positioned on tower body 2, the nacelle device being comprised of hanging basket 7, remote control equipment (RCE) 8 and entrance 9 is located at tower body 2 inside, by being positioned at the safety hole 10 of hanging basket 7 belows and being positioned at the safety device that the elastic protection device 11 in hole 10 forms safely, is positioned at foundation for tower crane 1 below.
The winch 3 that is wherein provided with distance caging device 4 is positioned at tower body 2 tops, and steel rope 5 is located on the cylinder of winch 3, and guide rail 6 is located on tower body 2 inwalls.
Wherein hanging basket 7 outsides are provided with the slide rail matching with guide rail 6, and hanging basket 7 is connected with winch 3 by steel rope 5.
Wherein safety hole 10 sidewalls are for being obliquely installed, and elastic protection device 11 is located at 10 bottoms, safety hole.
The utility model is when concrete use, operator enters into hanging basket 7 by entrance 9, operator starts by remote control equipment (RCE) 8 winch 3 that is provided with distance caging device 4, make winch 3 start hanging basket 7 to carry out lift work by steel rope 5, guide rail 6 and be located at hanging basket 7 on the slide rail that matches, make in the rail groove of guide rail 6, to move all the time in the upper and lower process of hanging basket 7, safety and the traveling comfort of hanging basket 7 operations have been improved, when meeting accident, hanging basket 7, under the effect of the friction force of guide rail 6, can play buffer action.
By the safety device being arranged in hanging basket 7 below foundation for tower crane 1, make hanging basket 7 when meeting accident, play the effect of safety precaution, elastic protection device 11 can play buffer action to greatest extent, and the safety control that provides that operating personal maximum in hanging basket 7 seems is provided.

Claims (4)

1. tower-type crane operation personnel are with convenient and safe type jacking system, comprise foundation for tower crane (1), tower body (2), bont, nacelle device and safety device, it is characterized in that: described tower body (2) is arranged on foundation for tower crane (1), bont is located thereon, nacelle device is located at its inside, and safety device is positioned at foundation for tower crane (1) below.
2. tower-type crane operation personnel as claimed in claim 1 are with convenient and safe type jacking system, it is characterized in that: described bont is comprised of winch (3), distance caging device (4), steel rope (5) and guide rail (6), the described winch that is provided with distance caging device (4) (3) is positioned at tower body (2) top, steel rope (5) is located on the cylinder of winch (3), and guide rail (6) is located on tower body (2) inwall.
3. tower-type crane operation personnel as claimed in claim 2 are with convenient and safe type jacking system, it is characterized in that: described nacelle device is comprised of hanging basket (7), remote control equipment (RCE) (8) and entrance (9), described hanging basket (7) outside is provided with the slide rail matching with guide rail (6), and hanging basket (7) is connected with winch (3) by steel rope (5).
4. tower-type crane operation personnel as claimed in claim 3 are with convenient and safe type jacking system, it is characterized in that: described safety device is comprised of the elastic protection device (11) that is positioned at the safety hole (10) of hanging basket (7) below and is positioned at safe hole (10), described safety hole (10) sidewall is for being obliquely installed, and elastic protection device (11) is located at bottom, safe hole (10).
CN201320647087.2U 2013-10-21 2013-10-21 Safety lifting device convenient to use and used for operators of tower crane Expired - Fee Related CN203497883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320647087.2U CN203497883U (en) 2013-10-21 2013-10-21 Safety lifting device convenient to use and used for operators of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320647087.2U CN203497883U (en) 2013-10-21 2013-10-21 Safety lifting device convenient to use and used for operators of tower crane

Publications (1)

Publication Number Publication Date
CN203497883U true CN203497883U (en) 2014-03-26

Family

ID=50328881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320647087.2U Expired - Fee Related CN203497883U (en) 2013-10-21 2013-10-21 Safety lifting device convenient to use and used for operators of tower crane

Country Status (1)

Country Link
CN (1) CN203497883U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800428A (en) * 2016-05-27 2016-07-27 芜湖金欧机械制造有限公司 Safety house and safety lifting device
CN106115417A (en) * 2014-08-14 2016-11-16 中国建筑第八工程局有限公司 The attachment structure that in lowering or hoisting gear, elevator is basic with attachment
CN106542469A (en) * 2015-09-18 2017-03-29 中国电力科学研究院 A kind of insulated elevating platform
CN112978577A (en) * 2021-01-20 2021-06-18 四川建筑职业技术学院 System and method for facilitating driver to enter tower crane cab

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115417A (en) * 2014-08-14 2016-11-16 中国建筑第八工程局有限公司 The attachment structure that in lowering or hoisting gear, elevator is basic with attachment
CN106185543A (en) * 2014-08-14 2016-12-07 中国建筑第八工程局有限公司 In lowering or hoisting gear, attachment basis supports, with section, the construction method being connected
CN106115417B (en) * 2014-08-14 2018-07-27 中国建筑第八工程局有限公司 The connection structure of elevator and attached base in lifting gear
CN106185543B (en) * 2014-08-14 2018-07-31 中国建筑第八工程局有限公司 The construction method of attached base and section support connection in lifting gear
CN106542469A (en) * 2015-09-18 2017-03-29 中国电力科学研究院 A kind of insulated elevating platform
CN105800428A (en) * 2016-05-27 2016-07-27 芜湖金欧机械制造有限公司 Safety house and safety lifting device
CN112978577A (en) * 2021-01-20 2021-06-18 四川建筑职业技术学院 System and method for facilitating driver to enter tower crane cab

Similar Documents

Publication Publication Date Title
CN203497883U (en) Safety lifting device convenient to use and used for operators of tower crane
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN201433031Y (en) Shaft overhead operation lifting basket
CN203584461U (en) Multifunctional downhole rescue cabin
CN203159151U (en) Cover plate lifting tool
CN202508723U (en) Novel construction lifter
CN201793300U (en) Elevator
CN205894715U (en) Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs
CN203555689U (en) Electric hanging basket for vertical shaft
CN204643664U (en) A kind of building tower crane
CN201801267U (en) Simple passenger carrying device for large-sized hoisting facility
CN206202477U (en) A kind of crawler type sprays anchor operation mobile platform
CN202744956U (en) Movable protection platform for bridge construction
CN102976183A (en) Construction lift for building under construction
CN203158956U (en) Building for preventing ladder cage of construction lift from falling
CN203158962U (en) Anti-falling system of construction elevator
CN203064928U (en) Anti-falling system of construction elevator
CN203805768U (en) Vehicle with construction protective shed
CN105197725A (en) Building tower crane manned lifting basket
CN203946738U (en) A kind of building tower crane manned lift hanging basket
CN204690719U (en) Inland river ship lock horizontal pulled gate maintenance Door propping device
CN203701551U (en) Detachable tower crane personnel channel
CN203345888U (en) Hydraulic jacking device for high-rise reinforced concrete building house
CN203064943U (en) Construction elevator for building under construction
CN203064938U (en) Construction elevator of building under construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326

Termination date: 20201021