CN203477412U - Coking-preventive back-pressure valve - Google Patents

Coking-preventive back-pressure valve Download PDF

Info

Publication number
CN203477412U
CN203477412U CN201320537836.6U CN201320537836U CN203477412U CN 203477412 U CN203477412 U CN 203477412U CN 201320537836 U CN201320537836 U CN 201320537836U CN 203477412 U CN203477412 U CN 203477412U
Authority
CN
China
Prior art keywords
valve
coking
pressure valve
valve rod
spheroid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320537836.6U
Other languages
Chinese (zh)
Inventor
吴建伟
卓育成
何伟华
梁连金
吴益标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shk Valve Group Co ltd
Original Assignee
Shanghai Shk Valve Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shk Valve Group Co Ltd filed Critical Shanghai Shk Valve Group Co Ltd
Priority to CN201320537836.6U priority Critical patent/CN203477412U/en
Application granted granted Critical
Publication of CN203477412U publication Critical patent/CN203477412U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift Valve (AREA)

Abstract

The utility model discloses a coking-preventive back-pressure valve. The coking-preventive back-pressure valve is characterized in that a main valve body and an auxiliary valve body are connected with each other to form a valve cavity, a ball is arranged in the cavity, an upper valve stem and a lower valve stem are respectively arranged on the upper side and the lower side of the ball and are connected with the ball by flat keys, and two steam blowing devices are respectively arranged on the left side and the right side of the valve cavity, the upper valve stem and the lower valve stem are respectively provided with other steam blowing devices which are communicated with packing, and the steam blowing devices blow steam to clean the inside of the valve. The coking-preventive back-pressure valve has the advantages that the coking-preventive back-pressure valve is simple in structure, low in opening torque and reliable in performance, is low in flow resistance when fully opened, and is scouring-resistant and corrosion-resistant; coking and deposition of residual oil can be prevented, accordingly, the problem that an existing valve cannot be opened due to the fact that all moving parts in the existing valve are adhered by residual oil can be effectively solved, and the coking-preventive back-pressure valve is safe and reliable in performance and long in service life.

Description

Anti-coking back pressure valve
Technical field
The utility model relates to a kind of high temperature back pressure valve, particularly a kind of anti-coking back pressure valve.
Background technique
In petroleum refining industry, along with the development of crude oil deep process technology, oil refinery employing delayed coking unit is that raw material carries out thermal cracking and the condensation reaction of the degree of depth, process gas, gasoline, diesel oil, wax oil and coke at high temperature (approximately 510 ℃) by the heavy oil of poor hydrogen mostly.Existing delayed coking unit is all generally a stove (oven) two towers (coking tower) or two stove four towers, oven continuous feed, coking tower alternate operation.An online green coke of tower, another tower cooler, decoking and warm tower.Coke drum is before the new charging of switching, must carry out oil gas preheating, its main purpose is to make tower body pre-heating temperature elevation gradually, prevents that tower body from producing softer coke because the temperature difference is too large, minimizing fatigue life makes deformation of the body of coke drum and prevent due to huge tower body heat absorption, reduce initial reaction temperature.The preheating of coke drum need to be opened overhead oil gas barrier valve and be drawn high-temperature oil gas and enter coke drum, preheating speed's backrest pressure valve of coke drum regulates, because back pressure valve can be set up a Pressure Drop by this valve time, so just can increase the gas phase flow rate that returns and pass through new coking tower, thereby shorten the coking tower needed time of preheating.
Back pressure valve is arranged on coke drum tower top In Oil-gas Line, and medium temperature is high, contain tar, tar viscosity is large, the problem that existing back pressure valve exists:
While 1, using gate valve, by flashboard, open the Pressure Drop when diverse location is set up by this valve, the oil gas on coke drum tower top In Oil-gas Line can return to and pass through new coking tower, and STRENGTH ON COKE tower carries out preheating, and the preheat time of coke drum is relevant with the aperture of flashboard; But there is the depression runner of irregularity in gate valve itself, large the mobile of tar gas that affect of flow resistance during valve wide open; Easily coking on the depression runner of irregularity simultaneously, the activity matching gap of valve rod also can exist the carbonizing matter and the residual carbon that are constantly accumulated to make mutually to solidify between part, causes dyskinesia, even cannot move, and makes valve total failure.
While 2, using stop valve, by flap, open the Pressure Drop when diverse location is set up by this valve, the oil gas on coke drum tower top In Oil-gas Line can return to and pass through new coking tower, and STRENGTH ON COKE tower carries out preheating, and the preheat time of coke drum is relevant with the aperture of flap; Stop valve runner is S-type, and flow channel shape is complicated, and flow resistance is large, affects flowing of tar gas; The activity matching gap of valve rod also can exist the carbonizing matter and the residual carbon that are constantly accumulated to make mutually to solidify between part, causes dyskinesia, even cannot move, and makes valve total failure.
Model utility content
Technical problem to be solved in the utility model is to provide a kind of simple in structure, and flow resistance is little, is conducive to the circulation of tar gas, and can stop the anti-coking back pressure valve of residual oil coking and deposition.
In order to solve above technical problem, the utility model provides a kind of anti-coking back pressure valve, comprise main valve body, auxiliary valve body, spheroid, valve rod, flat key, filler, gasket seal, steam blowing equipment and Electric actuator, main valve body and auxiliary valve body are connected to form valve body body cavity, spheroid is housed in body cavity, upper valve rod and lower valve rod are respectively equipped with in the both sides up and down of spheroid, spheroid and upper valve rod, lower valve rod connects with flat key, valve body body cavity each side have a steam blowing equipment, simultaneously at upper valve rod, lower valve rod is respectively provided with the steam blowing equipment being connected with filler, valve internal is purged, can stop residual oil coking and deposition, effectively solve the problem that in valve, all movement parts are caused valve to open by residual oil bonding
Described spherome surface and internal channel adopt spraying corrosion and wear resistant alloy, effectively solve washing away and etching problem of spheroid.
Described main valve body and auxiliary valve body junction surface are provided with gasket seal.
The gap of described valve rod is by packing seal.
The upper valve rod of anti-coking back pressure valve, lower valve rod are connected with Electric actuator, by Electric actuator actuate valve stem, open spheroid, the different opening of spheroid regulates by Electric actuator, thereby realize Pressure Drop when setting up by this valve, reach and increase the gas phase flow rate that returns to and pass through new coking tower, coking tower is effectively regulated preheat time.
The beneficial effects of the utility model:
1, adopt stationary structure to open moment of torsion little;
2, runner adopts full-bore design, and negotiability is strong, the little circulation that is conducive to tar gas of flow resistance;
3, spherome surface and internal channel adopt spraying corrosion and wear resistant alloy, effectively solve washing away and etching problem of spheroid;
4, adopt steam blowing equipment to purge and can stop residual oil coking and deposition valve internal, effectively solve the problem that in valve, all movement parts are caused valve to open by residual oil bonding.
Accompanying drawing explanation
Fig. 1 is internal structure schematic diagram of the present utility model;
Fig. 2 is the side view of Fig. 1;
Number in the figure explanation
1-main valve body; 2-spheroid;
31-valve rod; 32-lower valve rod;
4-flat key; 5-filler;
6-Electric actuator; 7-gasket seal;
8-auxiliary valve body; 9-purge vapor device
101-valve handle activity gap; 102-body cavity;
103-spherome surface; 104-spheroid internal channel.
Embodiment
Refer to shown in accompanying drawing, the utility model will be further described:
As Figure 1-Figure 2, the utility model provides a kind of anti-coking back pressure valve, comprises main valve body 1, auxiliary valve body 8, spheroid 2, upper valve rod 31, lower valve rod 32, flat key 4, filler 5, gasket seal 7, steam blowing equipment 9 and Electric actuator 6.Main valve body 1 and auxiliary valve body 8 junction surfaces are by gasket seal 7 sealings, after being connected with auxiliary valve body 8, main valve body 1 forms valve body body cavity 102, spheroid 2 is housed in body cavity 102, upper valve rod 31 and lower valve rod 32 are equipped with in the both sides up and down of spheroid 2, spheroid 2 and upper valve rod 31, lower valve rod 32 use flat keys 4 connect, the sealing of upper valve rod 31 and lower valve rod 32 is by filler 5 sealings, on main valve body 1, be provided with four steam blowing equipments 9 respectively: body cavity each side have a steam blowing equipment 9, at upper lower valve rod 3, be respectively provided with the steam blowing equipment 9 being connected with filler 5 simultaneously, adopt steam blowing equipment to purge and can stop residual oil coking and deposition valve internal, effectively solve the problem that in valve, all movement parts are caused valve to open by residual oil bonding, spherome surface 103 and internal channel 104 adopt spraying corrosion and wear resistant alloy, effectively solve washing away and etching problem of spheroid 2,
Anti-coking back pressure valve comes actuate valve stem 3 to open spheroid 2 by Electric actuator 6, the different opening of spheroid 2 regulates by Electric actuator 6, realize Pressure Drop when setting up by this valve, reach to increase and return to and pass through the gas phase flow rate of new coking tower, thereby coking tower is effectively regulated preheat time.

Claims (4)

1. an anti-coking back pressure valve, it is characterized in that: main valve body and auxiliary valve body are connected to form valve body body cavity, spheroid is housed in body cavity, upper valve rod and lower valve rod are respectively equipped with in the both sides up and down of spheroid, spheroid is connected with flat key with upper valve rod, lower valve rod, valve body body cavity each side have a steam blowing equipment, at upper valve rod, lower valve rod, be respectively provided with the steam blowing equipment being connected with filler simultaneously, valve internal is purged.
2. anti-coking back pressure valve according to claim 1, is characterized in that: described spherome surface and internal channel adopt spraying corrosion and wear resistant alloy.
3. anti-coking back pressure valve according to claim 1, is characterized in that: described main valve body and auxiliary valve body junction surface are provided with gasket seal.
4. anti-coking back pressure valve according to claim 1, is characterized in that: the gap of described valve rod is by packing seal.
CN201320537836.6U 2013-09-02 2013-09-02 Coking-preventive back-pressure valve Expired - Fee Related CN203477412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320537836.6U CN203477412U (en) 2013-09-02 2013-09-02 Coking-preventive back-pressure valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320537836.6U CN203477412U (en) 2013-09-02 2013-09-02 Coking-preventive back-pressure valve

Publications (1)

Publication Number Publication Date
CN203477412U true CN203477412U (en) 2014-03-12

Family

ID=50225743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320537836.6U Expired - Fee Related CN203477412U (en) 2013-09-02 2013-09-02 Coking-preventive back-pressure valve

Country Status (1)

Country Link
CN (1) CN203477412U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108916414A (en) * 2018-09-11 2018-11-30 山东沃克控制阀有限公司 A kind of ball valve that can clean spherome surface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108916414A (en) * 2018-09-11 2018-11-30 山东沃克控制阀有限公司 A kind of ball valve that can clean spherome surface

Similar Documents

Publication Publication Date Title
CN202203431U (en) Anti-coking ball valve
CN201589000U (en) Pneumatic lifting-revolving cock valve with functions of high temperature, high pressure and abrasion resistance
CN103756692B (en) Riser waste heat recovery device for coke oven
CN102295943B (en) Method for coking needle coke by large recycle ratio oil system
CN104194826B (en) A kind of processing method reducing delayed coking reaction dry gas yied
CN204328022U (en) Heat recovery rack-type electric brake plate valve
WO2016192307A1 (en) Novel heating furnace having multi-hearth structure, and design method and use thereof
CN203477412U (en) Coking-preventive back-pressure valve
CN103215062A (en) Delay coking processing method of inferior residual oil
CN201269316Y (en) Metal sealing plate sluice valve for ethylene cracking furnace
CN208594843U (en) Go up and down sealing device
CN203176360U (en) Novel dynamic seal structure for drill rod driving assembly
CN104694139A (en) Coke oven raw gas heat exchanger with flow guide device
CN104595512A (en) Water-cooled double-valve-plate high-temperature gate valve
CN107956901A (en) A kind of electric four passes plug valve
CN104073268A (en) Coking-preventing raw coke oven gas waste heat recycling device for heat-conduction oil coke oven
CN201462048U (en) Extrahigh pressure jacket thermal insulation ball valve for thermal insulation pipeline
CN202868292U (en) Throttling type drain valve
CN201339009Y (en) Totally sealed switching flue gas lower water-sealed valve for carbonization stove
CN204509190U (en) Equipment derived by a kind of new Type Coke Oven raw gas
CN201723750U (en) High-temperature valve for retort furnace
CN208294492U (en) Superhigh-pressure high-temp well head flap type
CN101648188B (en) Method for cleaning add-substract cock, exchange cock and branch pipe
CN206488287U (en) One kind connection A seating rises heat exchange of heat pipe
CN205420275U (en) Automatic water jet equipment of steam quenching in blue charcoal production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 201416 Shanghai city Fengxian District Zhelin Town Village Road No. 199

Patentee after: SHK VALVE GROUP Co.,Ltd.

Address before: 201416 Shanghai city Fengxian District Zhelin Town Village Road No. 199

Patentee before: SHK Valve Group Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170424

Address after: 201416 Shanghai city Fengxian District Zhelin Town Village Road No. 138 building 4

Patentee after: SHK VALVE GROUP CO.,LTD.

Address before: 201416 Shanghai city Fengxian District Zhelin Town Village Road No. 199

Patentee before: SHK VALVE GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181011

Address after: 201416 199 North Village Road, Zhelin Town, Fengxian District, Shanghai

Patentee after: SHK VALVE GROUP Co.,Ltd.

Address before: 201416 4 4 North Village Road, Zhelin Town, Fengxian District, Shanghai

Patentee before: SHK VALVE GROUP CO.,LTD.

PP01 Preservation of patent right

Effective date of registration: 20190821

Granted publication date: 20140312

PP01 Preservation of patent right
PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20220821

Granted publication date: 20140312

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20220821

Granted publication date: 20140312

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20230902

Granted publication date: 20140312

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312