CN203469762U - Pressure swing adsorption gas separation device - Google Patents

Pressure swing adsorption gas separation device Download PDF

Info

Publication number
CN203469762U
CN203469762U CN201320504269.4U CN201320504269U CN203469762U CN 203469762 U CN203469762 U CN 203469762U CN 201320504269 U CN201320504269 U CN 201320504269U CN 203469762 U CN203469762 U CN 203469762U
Authority
CN
China
Prior art keywords
operated valve
pneumatic operated
adsorption tower
group
valves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320504269.4U
Other languages
Chinese (zh)
Inventor
刘益民
何锦杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ruiqi Gas Technology Co ltd
Original Assignee
SHANGHAI RICH GAS EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI RICH GAS EQUIPMENT CO Ltd filed Critical SHANGHAI RICH GAS EQUIPMENT CO Ltd
Priority to CN201320504269.4U priority Critical patent/CN203469762U/en
Application granted granted Critical
Publication of CN203469762U publication Critical patent/CN203469762U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Gases By Adsorption (AREA)

Abstract

The utility model discloses a pressure swing adsorption gas separation device. The pressure swing adsorption gas separation device comprises a first pressure swing adsorption unit and a second pressure swing adsorption unit, wherein the first pressure swing adsorption unit and the second pressure swing adsorption unit are communicated with each other through a filter group; the first pressure swing adsorption unit comprises a first absorption tower and a second absorption tower which are connected with each other in parallel; a first group of pneumatic valves, a first group of check valves and a first ball valves, which are connected with one another in parallel, are connected between the top end of the first absorption tower and the top end of the second absorption tower; the first group of pneumatic valves comprise a fifth pneumatic valve and a sixth pneumatic valve which are connected with each other in series; the first group of check valves comprise a third check valve and a fourth check valve which are connected with each other in series; a branch is also arranged on a pipeline between the third check valve and the fourth check valve; the branch is communicated with an exhaust passage of the second pressure swing adsorption unit. Through the pressure swing adsorption gas separation device, the quality of regeneration gas and a regeneration effect of an adsorbent are improved; the production cost is lowered.

Description

Pressure swing adsorption gas separation device
Technical field
The utility model relates to a kind of pressure swing adsorption gas separation device.
Background technology
Utilize the equipment of adsorbent transformation separating mixed gas to comprise boost absorption and two processes of depressurization desorption.Its operation principle is: when a container (abbreviation adsorption tower) that adsorbent is housed is when boosting absorption aerogenesis, the regeneration of the depressurization desorption of another adsorption tower emptying simultaneously, utilize portioned product gas through adsorbent bed at depressurization desorption just, to adsorbent reactivation; So alternate cycles work, constantly output products gas.Wherein, Fig. 1 is shown in by process device structure schematic diagram.
As shown in Figure 1, pressure swing adsorption gas separation device of the prior art comprises: one first psa unit and one second psa unit.Described the first psa unit and described the second psa unit are by a filter set 6 ' be communicated with.
Described the first psa unit comprise one first adsorption tower 1 parallel with one another ' and one second adsorption tower 2 '.Described the first adsorption tower 1 ' top and described the second adsorption tower 2 ' top between be connected with first group of pneumatic operated valve parallel with one another and one first ball valve 17 ', described the first adsorption tower 1 ' bottom and described the second adsorption tower 2 ' bottom between be connected with the 4th group of pneumatic operated valve and the 5th group of pneumatic operated valve parallel with one another.
Described first group of pneumatic operated valve comprise one the 5th pneumatic operated valve 15 of mutual series connection ' and one the 6th pneumatic operated valve 16 ', described the 4th group of pneumatic operated valve comprise one the 3rd pneumatic operated valve 13 of mutual series connection ' and one the 4th pneumatic operated valve 14 ', described the 5th group of pneumatic operated valve comprise one first pneumatic operated valve 11 of mutual series connection ' and one second pneumatic operated valve 12 '.
One first emptying muffler 8 ' one end and one second ball valve 18 ' one end be all connected to described the first pneumatic operated valve 11 ' and described the second pneumatic operated valve 12 ' between; One unstripped gas 5 ' outlet be connected to described the 3rd pneumatic operated valve 13 ' and described the 4th pneumatic operated valve 14 ' between.
As shown in Figure 1, described the second psa unit comprise one the 3rd adsorption tower 3 ' and one the 4th adsorption tower 4 '.Described the 3rd adsorption tower 3 ' bottom and described the 4th adsorption tower 4 ' bottom between be connected with second group of pneumatic operated valve parallel with one another, one the 9th pneumatic operated valve 33 ' and the 3rd group of pneumatic operated valve, described the 3rd adsorption tower 3 ' top and described the 4th adsorption tower 4 ' top between be connected with the 6th group of pneumatic operated valve parallel with one another, first group of check-valves and 1 the 12 pneumatic operated valve 36 '.
Described second group of pneumatic operated valve comprise 1 the tenth pneumatic operated valve 34 of mutual series connection ' and 1 the 11 pneumatic operated valve 35 ', described the 3rd group of pneumatic operated valve comprise one the 7th pneumatic operated valve 31 of mutual series connection ' and one the 8th pneumatic operated valve 32 ', described the 7th pneumatic operated valve 31 of one second emptying muffler 9 ' be arranged at ' and described the 8th pneumatic operated valve 32 ' between.
Described the 6th group of pneumatic operated valve comprise 1 the 13 pneumatic operated valve 37 of mutual series connection ' and 1 the 14 pneumatic operated valve 38 ', described first group of check-valves comprise one first check-valves 39 of mutual series connection ' and one second check-valves 40 ', one first throttle valve 41 ' one end be connected to described the 13 pneumatic operated valve 37 ' and described the 14 pneumatic operated valve 38 ' between, described first throttle valve 41 ' the other end be connected to described the first check-valves 39 ' and described the second check-valves 40 ' between, one gas product 7 ' import be connected to described the 13 pneumatic operated valve 37 ' and described the 14 pneumatic operated valve 38 ' between.
Described filter set 6 ' import be connected to described the 5th pneumatic operated valve 15 ' and described the 6th pneumatic operated valve 16 ' between, described filter set 6 ' outlet be connected to described the tenth pneumatic operated valve 34 ' and described the 11 pneumatic operated valve 35 ' between.
Adopt adsorbent dependence self gas product of the pressure swing adsorption gas separation device of said structure certainly will produce following shortcoming to its purging regeneration:
1, cause the waste of gas product;
2, due to the feature such as self gas product dew point is low, cause adsorbent reactivation poor effect.
Utility model content
The technical problems to be solved in the utility model is in order to overcome in prior art the defects such as the large and adsorbent reactivation poor effect of pressure swing adsorption gas separation device gas product consumption, a kind of pressure swing adsorption gas separation device to be provided.
The utility model solves above-mentioned technical problem by following technical proposals:
A kind of pressure swing adsorption gas separation device, comprise, one first psa unit and one second psa unit, described the first psa unit is communicated with by a filter set with described the second psa unit, its feature is, described the first psa unit comprises one first adsorption tower parallel with one another and one second adsorption tower, between the top of the top of described the first adsorption tower and described the second adsorption tower, be connected with first group of pneumatic operated valve parallel with one another, first group of check-valves and one first ball valve, described first group of pneumatic operated valve comprises one the 5th pneumatic operated valve and one the 6th pneumatic operated valve of mutual series connection, described first group of check-valves comprises one the 3rd check-valves and one the 4th check-valves of mutual series connection,
On pipeline between described the 3rd check-valves and described the 4th check-valves, be also provided with a branch road, described branch road is communicated with an exhaust channel of described the second psa unit.
In this programme, between the top of the top of the first adsorption tower and the second adsorption tower, be connected with mutual one the 3rd check-valves of connecting and one the 4th check-valves, on pipeline between the 3rd check-valves and the 4th check-valves, be also provided with a branch road being communicated with an exhaust channel of the second psa unit, the gas that the second psa unit is discharged through exhaust channel is recycled again, make in its first adsorption tower or the second adsorption tower that enters the first psa unit, the first adsorption tower or the second adsorption tower are carried out to punching press or adsorbent reactivation, improve quality and the adsorbent reactivation effect of partial regeneration gas, thereby improve adsorbent absorption property, saved the consumption for the finished product gas of adsorbent reactivation simultaneously, reduce the consumption of unstripped gas, reduced user's production cost.
Preferably, described the second psa unit comprises one the 3rd adsorption tower and one the 4th adsorption tower, between the bottom of the bottom of described the 3rd adsorption tower and described the 4th adsorption tower, be connected with second group of pneumatic operated valve parallel with one another, one the 9th pneumatic operated valve and the 3rd group of pneumatic operated valve, described second group of pneumatic operated valve comprises 1 the tenth pneumatic operated valve and 1 the 11 pneumatic operated valve of mutual series connection, described the 3rd group of pneumatic operated valve comprises one the 7th pneumatic operated valve and one the 8th pneumatic operated valve of mutual series connection, and described exhaust channel is arranged between described the 7th pneumatic operated valve and described the 8th pneumatic operated valve.
In this programme, described exhaust channel is arranged between the 7th pneumatic operated valve and described the 8th pneumatic operated valve, makes the gas of the 3rd adsorption tower or the discharge of the 4th adsorption tower in drain passageway enters the first psa unit.
Preferably, on described exhaust channel, be connected with one second emptying muffler.
In this programme, adopt said structure, the portion gas that the second psa unit is discharged is effectively eliminated the noise in the situation that not affecting adsorbent reactivation effect through the second muffler.
Preferably, the import of described filter set is connected between described the 5th pneumatic operated valve and described the 6th pneumatic operated valve, and the outlet of described filter set is connected between described the tenth pneumatic operated valve and described the 11 pneumatic operated valve.
Preferably, between the bottom of the bottom of described the first adsorption tower and the second adsorption tower, be connected with one the 4th group of pneumatic operated valve and one the 5th group of pneumatic operated valve parallel with one another, described the 4th group of pneumatic operated valve comprises one the 3rd pneumatic operated valve and one the 4th pneumatic operated valve of mutual series connection, described the 5th group of pneumatic operated valve comprises one first pneumatic operated valve and one second pneumatic operated valve of mutual series connection, and one end of one end of one first emptying muffler and one second ball valve is all connected between described the first pneumatic operated valve and the second pneumatic operated valve.
Meeting on the basis of this area general knowledge, above-mentioned each optimum condition, can be combined, and obtains each preferred embodiments of the utility model.
Positive progressive effect of the present utility model is:
The utility model pressure swing adsorption gas separation device has improved the quality of partial regeneration gas, thereby adsorbent reactivation effect and adsorbent absorption property have been improved, save the finished product gas that purges regeneration simultaneously, reducing desorption drops a hint, the consumption that reduces unstripped gas, has reduced user's operation energy consumption and production cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of pressure swing adsorption gas separation device in prior art.
Fig. 2 is the structural representation of the preferred embodiment of the utility model pressure swing adsorption gas separation device.
Fig. 3 is the time-scale between the pneumatic operated valve of the first psa unit in Fig. 2.
Fig. 4 is the time-scale between the pneumatic operated valve of the second psa unit in Fig. 2.
The specific embodiment
Below in conjunction with accompanying drawing, provide the utility model preferred embodiment, to describe the technical solution of the utility model in detail.
As shown in Figure 2, the utility model pressure swing adsorption gas separation device comprises: one first psa unit and one second psa unit.Described the first psa unit is communicated with by a filter set 6 with the second psa unit.
The first psa unit comprises one first adsorption tower 1 parallel with one another and one second adsorption tower 2.Between the top of the top of described the first adsorption tower 1 and the second adsorption tower 2, be connected with first group of pneumatic operated valve parallel with one another, first group of check-valves and one first ball valve 17.
Wherein, described first group of pneumatic operated valve comprises one the 5th pneumatic operated valve 15 and one the 6th pneumatic operated valve 16 of mutual series connection; Described one group of check-valves comprises one the 3rd check-valves 19 and one the 4th check-valves 20 of mutual series connection, and, on the pipeline between described the 3rd check-valves 19 and the 4th check-valves 20, being also provided with a branch road, branch road is communicated with an exhaust channel of the second psa unit.
In the utility model, between the top of the top of the first adsorption tower 1 and the second adsorption tower 2, be connected with mutual one the 3rd check-valves 19 of connecting and one the 4th check-valves 20, on pipeline between the 3rd check-valves 19 and the 4th check-valves 20, be also provided with a branch road being communicated with an exhaust channel of the second psa unit, the gas that the second psa unit is discharged through exhaust channel is recycled again, make in its first adsorption tower 1 or the second adsorption tower 2 that enters the first psa unit, the first adsorption tower or the second adsorption tower are carried out to punching press or adsorbent reactivation, improve quality and the adsorbent reactivation effect of partial regeneration gas, thereby improve adsorbent absorption property, saved the consumption for the finished product gas of adsorbent reactivation simultaneously, reduce the consumption of unstripped gas, reduced user's production cost.
Between the bottom of the bottom of described the first adsorption tower 1 and the second adsorption tower 2, be connected with the 4th group of pneumatic operated valve and the 5th group of pneumatic operated valve parallel with one another.
Wherein, described the 4th group of pneumatic operated valve comprises one the 3rd pneumatic operated valve 13 and one the 4th pneumatic operated valve 14 of mutual series connection; Described the 5th group of pneumatic operated valve comprises one first pneumatic operated valve 11 and one second pneumatic operated valve 12 of mutual series connection.
In addition, one end of one end of one first emptying muffler 8 and one second ball valve 18 is all connected between the first pneumatic operated valve 11 and the second pneumatic operated valve 12; The outlet of one unstripped gas 5 is connected between the 3rd pneumatic operated valve 13 and the 4th pneumatic operated valve 14.
In addition, as shown in Figure 2, the second psa unit comprises one the 3rd adsorption tower 3 and one the 4th adsorption tower 4.Between the bottom of the bottom of described the 3rd adsorption tower 3 and the 4th adsorption tower 4, be connected with second group of pneumatic operated valve parallel with one another, one the 9th pneumatic operated valve 33 and the 3rd group of pneumatic operated valve.
Wherein, described second group of pneumatic operated valve comprises 1 the tenth pneumatic operated valve 34 and 1 the 11 pneumatic operated valve 35 of mutual series connection; Described the 3rd group of pneumatic operated valve comprises one the 7th pneumatic operated valve 31 and one the 8th pneumatic operated valve 32 of mutual series connection.
Further, between the top of the 3rd adsorption tower 3 and the top of described the 4th adsorption tower 4, be connected with the 6th group of pneumatic operated valve parallel with one another, second group of check-valves and 1 the 12 pneumatic operated valve 36.
Wherein, the 6th group of pneumatic operated valve comprises 1 the 13 pneumatic operated valve 37 and 1 the 14 pneumatic operated valve 38 of mutual series connection; Second group of check-valves comprises one first check-valves 39 and one second check-valves 40 of mutual series connection.
Further, one end of a first throttle valve 41 is connected between the 13 pneumatic operated valve 37 and the 14 pneumatic operated valve 38, and the other end of described first throttle valve 41 is connected between the first check-valves 39 and the second check-valves 40; The import of one gas product 7 is connected between the 13 pneumatic operated valve 37 and described the 14 pneumatic operated valve 38.
In addition, as shown in Figure 2, exhaust channel is arranged between described the 7th pneumatic operated valve 31 and the 8th pneumatic operated valve 32.Wherein, on exhaust channel, be connected with one second emptying muffler 9.
In addition, the import of filter set 6 is connected between described the 5th pneumatic operated valve 15 and described the 6th pneumatic operated valve 16, and the outlet of described filter set 6 is connected between the tenth pneumatic operated valve 34 and the 11 pneumatic operated valve 35.
More than be described as the structure of PSA Gas, concrete pneumatic operated valve opens, cuts out the programme-control by PLC, and actuation time, order are with reference to the time-scale of Fig. 3, Fig. 4.
Wherein, the first adsorption tower 1 and the second adsorption tower 2 alternate cycles work.Its concrete course of work is as follows:
As shown in Figure 2 and Figure 3, open the second pneumatic operated valve 12, the 3rd pneumatic operated valve 13, the 5th pneumatic operated valve 15, unstripped gas 5 enters pressure swing adsorption gas separation device, the first adsorption tower 1 work, and gas product is through the 5th pneumatic operated valve 15 input filter groups 6.The portion gas at the top of the first adsorption tower 1, by 17 pairs of interior adsorbent reactivations of the second adsorption tower 2 of the first ball valve, is discharged through the second pneumatic operated valve 12 and the first emptying muffler 8.In addition, the 3rd adsorption tower 3 in the second psa unit or the portion gas in the 4th adsorption tower 4 are through exhaust channel and 19 pairs of interior adsorbent reactivations of the second adsorption tower 2 of the 3rd check-valves.
After work accumulation 240s, the portion gas of closing the top of the second pneumatic operated valve 12, the first adsorption towers 1 passes through 17 pairs of the second adsorption tower 2 punching presses of the first ball valve.The 3rd adsorption tower 3 in the second psa unit or the portion gas in the 4th adsorption tower 4 through exhaust channel to the second adsorption tower 2 punching presses.The first adsorption tower 1 works on, and switches to the second adsorption tower 2 work after 120s.
Close the 3rd pneumatic operated valve 13, the 5th pneumatic operated valve 15, open the first pneumatic operated valve 11, the 4th pneumatic operated valve 14, the 6th pneumatic operated valve 16, the second adsorption tower 2 work simultaneously, gas product is through the 6th pneumatic operated valve 16 input filter groups 6.The portion gas at the top of the second adsorption tower 2, by 17 pairs of interior adsorbent reactivations of the first adsorption tower 1 of the first ball valve, is discharged through the first pneumatic operated valve 11 and the first emptying muffler 8.In addition, the 3rd adsorption tower 3 in the second psa unit or the portion gas in the 4th adsorption tower 4 are through exhaust channel and 20 pairs of interior adsorbent reactivations of the first adsorption tower 1 of the 4th check-valves.
After work accumulation 600s, the portion gas of closing the top of the first pneumatic operated valve 11, the second adsorption towers 2 passes through 17 pairs of the first adsorption tower 1 punching presses of the first ball valve.The 3rd adsorption tower 3 in the second psa unit or the portion gas in the 4th adsorption tower 4 through exhaust channel to the first adsorption tower 1 punching press.The second adsorption tower 2 works on, and switches to the first adsorption tower 1 work after 120s.
The first adsorption tower 1 and the second adsorption tower 2 alternations are once one-period, and switching time is set rear automatic control by PLC in above pneumatic operated valve action and control.
In the first adsorption tower 1 and the second adsorption tower 2 alternations, the 3rd adsorption tower 3 and the 4th also alternation of adsorption tower 4, specific works process is as described below.
As shown in Figure 2, Figure 4 shows, opening the 9th pneumatic operated valve the 33, the 12 pneumatic operated valve 36, the four adsorption towers 4 all presses to the 3rd adsorption tower 3.
After work accumulation 2s, close the 9th pneumatic operated valve the 33, the 12 pneumatic operated valve 36, open the 8th pneumatic operated valve 32, the tenth pneumatic operated valve the 34, the 13 pneumatic operated valve 37, the three adsorption tower 3 work simultaneously, gas product is through the 13 pneumatic operated valve 37 outputs.The portion gas at the top of the 3rd adsorption tower 3 is by first throttle valve 41 and 39 pairs of interior adsorbent reactivations of the 4th adsorption tower 4 of the first check-valves.The interior gas of the 4th adsorption tower 4 is discharged from the second emptying muffler 9 through the 8th pneumatic operated valve 32 parts simultaneously, and its another part flows in the first adsorption tower 1 or the second adsorption tower 2 in the first psa unit.
After work accumulation 59s, close the 8th pneumatic operated valve 32, the three adsorption tower 3 top section gases by first throttle valve 41 and 39 pairs of the 4th adsorption tower 4 punching presses of the first check-valves, the 3rd adsorption tower 3 works on, gas product, through the 13 pneumatic operated valve 37 outputs, switches to the 4th adsorption tower 4 work after 1s.
After work accumulation 60s, close the tenth pneumatic operated valve 34 and the 13 pneumatic operated valve 37, open the 9th pneumatic operated valve the 33, the 12 pneumatic operated valve 36, the three adsorption towers 3 simultaneously and all press to the 4th adsorption tower 4.
After work accumulation 62s, close the 9th pneumatic operated valve 33 and the 12 pneumatic operated valve 36, open the 7th pneumatic operated valve the 31, the 11 pneumatic operated valve 35 and the 14 pneumatic operated valve 38, the four adsorption tower 4 work simultaneously, gas product is through the 14 pneumatic operated valve 38 outputs.The portion gas at the top of the 4th adsorption tower 4 is by first throttle valve 41 and 40 pairs of interior adsorbent reactivations of the 3rd adsorption tower 3 of the second check-valves.The interior gas of the 3rd adsorption tower 3 is discharged from the second emptying muffler 9 through the 7th pneumatic operated valve 31 parts simultaneously, and its another part flows in the first adsorption tower 1 or the second adsorption tower 2 in the first psa unit.
After work accumulation 119s, close the 7th pneumatic operated valve 31, the portion gas at the top of the 4th adsorption tower 4 is by first throttle valve 41 and 40 pairs of the 3rd adsorption tower 3 punching presses of the second check-valves, the 4th adsorption tower 4 works on, gas product, through the 14 pneumatic operated valve 38 outputs, switches to the 3rd adsorption tower 3 work after 1s.
The 3rd adsorption tower 3 and the 4th adsorption tower 4 alternations are once one-period, and switching time is set rear automatic control by PLC in above pneumatic operated valve action and control.
The one-period of the first adsorption tower 1 and the second adsorption tower 2 alternations is 720s, and the working time of the first adsorption tower 1 and the second adsorption tower 2 is 360s; The one-period of the 3rd adsorption tower 3 and the 4th adsorption tower 4 alternations is 120s, and the working time of the 3rd adsorption tower 3 and the 4th adsorption tower 4 is 60s.When the first adsorption tower 1 work, the 3rd adsorption tower 3 and the 4th three cycles of adsorption tower 4 alternate cycles; When the second adsorption tower 2 work, the 3rd adsorption tower 3 and the 4th adsorption tower 4 be three cycles of alternate cycles also.
When the first adsorption tower 1, the 3rd adsorption tower 3 work, the interior gas of the 4th adsorption tower 4 is emptying through 32 minutes two-way ,Yi road the second mufflers 9 of the 8th pneumatic operated valve, 19 pairs of interior adsorbent reactivations of the second adsorption tower 2 of another Lu Jing tri-check-valves or to the second adsorption tower 2 punching presses.
When the first adsorption tower 1, the 4th adsorption tower 4 work, the interior gas of the 3rd adsorption tower 3 is emptying through 31 minutes two-way ,Yi road the second mufflers 9 of the 7th pneumatic operated valve, 19 pairs of interior adsorbent reactivations of the second adsorption tower 2 of another Lu Jing tri-check-valves or to the second adsorption tower 2 punching presses.
When the second adsorption tower 2, the 3rd adsorption tower 3 work, the interior gas of the 4th adsorption tower 4 is emptying through 32 minutes two-way ,Yi road the second mufflers 9 of the 8th pneumatic operated valve, 20 pairs of interior adsorbent reactivations of the first adsorption tower 1 of another Lu Jing tetra-check-valves or to the first adsorption tower 1 punching press.
When the second adsorption tower 2, the 4th adsorption tower 4 work, the interior gas of the 3rd adsorption tower 3 is emptying through 31 minutes two-way ,Yi road the second mufflers 9 of the 7th pneumatic operated valve, 20 pairs of interior adsorbent reactivations of the first adsorption tower 1 of another Lu Jing tetra-check-valves or to the first adsorption tower 1 punching press.
In the utility model, during on the first adsorption tower 1 or the second adsorption tower 2 punching press: in the situation that not affecting the 3rd adsorption tower 3 or the interior adsorbent desorption and regeneration of the 4th adsorption tower 4 effect, improve the quality of the gas product in the first adsorption tower 1 or the second adsorption tower 2 and reduced the tolerance of punching press while switching to this first adsorption tower 1 or the work of the second adsorption tower 2, improve adsorbent absorption property, reduced raw air consumption.
During to the first adsorption tower 1 or the second adsorption tower 2 interior adsorbent reactivation: the dew point through the dew point of the gas product of the first adsorption tower 1 and the second adsorption tower 2 lower than the gas product through the first adsorption tower 1, the second adsorption tower 2, the 3rd adsorption tower 3 and the 4th adsorption tower 4, make in the situation that not affecting the 3rd adsorption tower 3 or the interior adsorbent desorption and regeneration of the 4th adsorption tower 4 effect, improved adsorbent reactivation effect in adsorption tower, and reduced the consumption of the finished product gas for regenerating, improve adsorbent absorption property, reduced raw air consumption.
In sum, the utility model pressure swing adsorption gas separation device has improved the quality of partial regeneration gas, thereby adsorbent reactivation effect and adsorbent absorption property have been improved, save the finished product gas that purges regeneration simultaneously, reducing desorption drops a hint, the consumption that reduces unstripped gas, has reduced user's operation energy consumption and production cost.
Although more than described the specific embodiment of the present utility model, it will be understood by those of skill in the art that these only illustrate, protection domain of the present utility model is limited by appended claims.Those skilled in the art is not deviating under the prerequisite of principle of the present utility model and essence, can make various changes or modifications to these embodiments, but these changes and modification all fall into protection domain of the present utility model.

Claims (5)

1. a pressure swing adsorption gas separation device, comprise, one first psa unit and one second psa unit, described the first psa unit is communicated with by a filter set with described the second psa unit, it is characterized in that, described the first psa unit comprises one first adsorption tower parallel with one another and one second adsorption tower, between the top of the top of described the first adsorption tower and described the second adsorption tower, be connected with first group of pneumatic operated valve parallel with one another, first group of check-valves and one first ball valve, described first group of pneumatic operated valve comprises one the 5th pneumatic operated valve and one the 6th pneumatic operated valve of mutual series connection, described first group of check-valves comprises one the 3rd check-valves and one the 4th check-valves of mutual series connection,
On pipeline between described the 3rd check-valves and described the 4th check-valves, be also provided with a branch road, described branch road is communicated with an exhaust channel of described the second psa unit.
2. pressure swing adsorption gas separation device as claimed in claim 1, it is characterized in that, described the second psa unit comprises one the 3rd adsorption tower and one the 4th adsorption tower, between the bottom of the bottom of described the 3rd adsorption tower and described the 4th adsorption tower, be connected with second group of pneumatic operated valve parallel with one another, one the 9th pneumatic operated valve and the 3rd group of pneumatic operated valve, described second group of pneumatic operated valve comprises 1 the tenth pneumatic operated valve and 1 the 11 pneumatic operated valve of mutual series connection, described the 3rd group of pneumatic operated valve comprises one the 7th pneumatic operated valve and one the 8th pneumatic operated valve of mutual series connection, described exhaust channel is arranged between described the 7th pneumatic operated valve and described the 8th pneumatic operated valve.
3. pressure swing adsorption gas separation device as claimed in claim 2, is characterized in that, is connected with one second emptying muffler on described exhaust channel.
4. pressure swing adsorption gas separation device as claimed in claim 2, it is characterized in that, the import of described filter set is connected between described the 5th pneumatic operated valve and described the 6th pneumatic operated valve, and the outlet of described filter set is connected between described the tenth pneumatic operated valve and described the 11 pneumatic operated valve.
5. pressure swing adsorption gas separation device as claimed in claim 1, it is characterized in that, between the bottom of the bottom of described the first adsorption tower and the second adsorption tower, be connected with one the 4th group of pneumatic operated valve and one the 5th group of pneumatic operated valve parallel with one another, described the 4th group of pneumatic operated valve comprises one the 3rd pneumatic operated valve and one the 4th pneumatic operated valve of mutual series connection, described the 5th group of pneumatic operated valve comprises one first pneumatic operated valve and one second pneumatic operated valve of mutual series connection, and one end of one end of one first emptying muffler and one second ball valve is all connected between described the first pneumatic operated valve and the second pneumatic operated valve.
CN201320504269.4U 2013-08-16 2013-08-16 Pressure swing adsorption gas separation device Expired - Lifetime CN203469762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320504269.4U CN203469762U (en) 2013-08-16 2013-08-16 Pressure swing adsorption gas separation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320504269.4U CN203469762U (en) 2013-08-16 2013-08-16 Pressure swing adsorption gas separation device

Publications (1)

Publication Number Publication Date
CN203469762U true CN203469762U (en) 2014-03-12

Family

ID=50218180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320504269.4U Expired - Lifetime CN203469762U (en) 2013-08-16 2013-08-16 Pressure swing adsorption gas separation device

Country Status (1)

Country Link
CN (1) CN203469762U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104415641A (en) * 2013-08-16 2015-03-18 上海通学实业有限公司 Variable pressure gas adsorption separation apparatus
US11679354B2 (en) 2016-10-21 2023-06-20 Corning Incorporated Sorbent structures with resistive heating capability and methods of making the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104415641A (en) * 2013-08-16 2015-03-18 上海通学实业有限公司 Variable pressure gas adsorption separation apparatus
US11679354B2 (en) 2016-10-21 2023-06-20 Corning Incorporated Sorbent structures with resistive heating capability and methods of making the same

Similar Documents

Publication Publication Date Title
CN101643209A (en) Method for purifying and reclaiming carbon dioxide from landfill gas and device thereof
CN103861422B (en) A kind of concentrate is containing the new process of methane in oxygen coal-bed gas gas
CN104192807B (en) A kind of oxygen generating plant system and technical process thereof
CN103693624A (en) Continuous oxygen generator with integrated molecular sieve adsorption tower
CN102580457B (en) Oxygen generating device special for ozone device
CN203469762U (en) Pressure swing adsorption gas separation device
CN202823095U (en) High yield gas purifying device
CN104415641A (en) Variable pressure gas adsorption separation apparatus
CN200995961Y (en) Oxygen maker of economical pressure-swing adsorptive molecular screen
CN101015761A (en) Pressure-swing-adsorption purging regeneration method without using vacuum pump
CN201529477U (en) Variable-frequency and variable-voltage absorbed gas separating device
CN111217341A (en) PSA nitrogen production system process flow
CN100355484C (en) Pressure swing absorption decarbonization process and apparatus
CN208229602U (en) Energy saving nitrogen making machine
CN202315636U (en) Pressure-changeable adsorption decarbonization device
CN202715337U (en) Pressure swing adsorption equipment
CN202519026U (en) Special oxygen generating device for ozone generator
CN2889461Y (en) Three-tower variable-pressure gas adsorbing separator
CN102635722B (en) Valve on-and-off time sequence control for dual-tower adsorption nitrogen making machine
CN101306300B (en) Pressure swing adsorption decarbonization technique and device
CN202237709U (en) Control system for pressure varying adsorption gas separating equipment
CN203498079U (en) Device for preparing oxygen from air
CN101612508B (en) Low-cost pressure swing adsorption air separation process technology and applied pressure swing adsorption air separation equipment
CN201394410Y (en) Pressure-swing absorption device capable of rapidly increasing pressure of absorption tower
CN201825725U (en) Vacuum pressure swing adsorption system for oxygen production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI TONGXUE INDUSTRY CO., LTD.

Free format text: FORMER OWNER: SHANGHAI RICH GAS EQUIPMENT CO., LTD.

Effective date: 20150129

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201508 JINSHAN, SHANGHAI TO: 201505 JINSHAN, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20150129

Address after: Jinshan District Wei Chang Road 201505 Shanghai City No. 293 Building 2 room 6105

Patentee after: SHANGHAI TONGXUE INDUSTRIAL Co.,Ltd.

Address before: 201508 Shanghai Jinshan District Shanyang town Ting Wei Road No. 2099

Patentee before: SHANGHAI RICH GAS EQUIPMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200819

Address after: Room 7717, building 2, No. 293, Weichang Road, Jinshan District, Shanghai, 201508

Patentee after: Shanghai Ruiqi Gas Technology Co.,Ltd.

Address before: Jinshan District Wei Chang Road 201505 Shanghai City No. 293 Building 2 room 6105

Patentee before: SHANGHAI TONGXUE INDUSTRIAL Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140312